Plans towards CC in the LHC a US – centric perspective

Slides:



Advertisements
Similar presentations
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Advanced Energy Systems, Inc. FY 09 AES Phase I Crab Cavity SBIRs Michael Cole, Doug Holmes.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Stimulating a discussion on cavity performance metrics.
Meeting summary (so far, Monday morning) and comments Tom Peterson, Camille Ginsburg (FNAL), Alex Ratti (LBNL) Crab Cavity Meeting, CERN, 1-6 Aug 2013.
Ofelia Capatina on behalf of the CERN specification team
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 Oct 2010.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Crab Cryostat Integration and Planning Meeting – some outcomes
Resource Loaded Schedule and Budget Profile
Session VI: Cryomodule Construction Summary
CC LLRF SM18 test plan and BA6 infrastructure
CERN – Zanon discussions
Review of options for crab cavities in LHC:
Leonardo Ristori Crab Cavities L2 Manager
WP5 Elliptical cavities
Crab Cavities Contribution from the U.S.
Oct 22 Group Leaders Planning meeting
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Odu/slac rf-dipole prototype
Progress and Issues with VTS Upgrade
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
LHC Crab Cavity Conceptual Design at SLAC
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
Hollow e- lens, Cryogenic aspects
MICE Project in the US: Completion of Efforts
Double Quarter Wave Crab Cavity
Brainstorming on how to best proceed with LESS
ESS RF Development at Uppsala University
UK RFD Pre-Series cryomodule
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
SPS-DQW HOM Measurements
SNS-PPU upgrades the existing accelerator structure
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
Presentation transcript:

Plans towards CC in the LHC a US – centric perspective Ratti LBNL

Outline Where we are…. SPS test considerations …and where we think we are going SPS test considerations Reaching the LHC baseline Organization US (LARP++) role and planned contribution

Global Collaboration Active collaboration with the UK and CERN Cryomodule concepts Engineering analysis System integration Ideas and experience exchange Tremendous amount of skills and knowledge among collaborators Best chance to develop an excellent CC system

SPS vs. LHC SPS LHC implementation will need SPS results + much more 3-4 year focus Downselected many objectives Streamlined goals to simplify systems and provide more fundamental answers Ie. Does crabbing work with proton beams? We don’t need active alignment to verify this Not testing in the LHC LHC implementation will need SPS results + much more

Roles within LARP EM modeling of all systems – SLAC Cavity Design – BNL and ODU Cryostat design and integration – FNAL Close collaboration with CERN and the UK teams Plan to get even closer, through weekly meetings and other integration events Niowave built all PoP systems and is funded to build prototype hardware through the DOE SBIR program Proposing an industrialization plan for a team discussion tomorrow

Collaborative events Besides dedicated breakouts at all collaboration meetings and other LARP or HL-LHC events Dec 12 – Planning meeting at FNAL May 13 –Cryomodule Integration at FNAL https://indico.fnal.gov/conferenceDisplay.py?confId=6859 Jul-Aug 13 – CM Conceptual Design at CERN https://indico.cern.ch/conferenceDisplay.py?confId=263565

Upcoming events DoE review of LARP – Feb 14 Design freeze – Mar. 2014 Release cavity models to Niowave Technical Advisory Panel - Apr. 14 Possibility to combine with CM23 LARP HL-LUMI collaboration meeting in May 7-9

Ongoing work - 2014 LARP plans to complete one fully dressed prototype cavity of each LARP design (DQW and RFD) by the end of September Deliver complete 3D model to Niowave by March Niowave generates production drawings and builds cavities by September Testing later in the year Vertical Test Stands in the US Sending existing proof of principle cavities to CERN for testing in SM18

Ongoing work – Future years After VT measurement results prepare deliverable for SPS test Cyomodule and cavity integration Power couplers desired by early 2016 And no later than summer 2016 Test in SM18 Installation and run in SPS

What will go in the SPS? Establishing selection criteria soon Define what is required and what is important Provocative comment for cavity selection Any cryomodule to meet requirements and pass SM18 Horizontal test in 2016 has a great chance to be installed in the SPS Ultimately it is a CERN decision

What we need from CERN Extended specifications and requirements or clarifications Parts and materials Coated flanges, raw materials (steel, possibly Nb…) Possible procurement of cavities or cryostats to overcome limits in funding Survey interfaces Equipment Power couplers May need help with 400 MHz hardware for US test stand Amplifiers, LLRF Documentation framework Safety ‘folder’ + its management Documentation repository

What we need from CERN (cont.) Engineering Mechanical (Thermal+Stress+Sensitivity) analysis of all cavities and cryomodules Pressure Vessel Safety + beyond SM18 tests of PoP cavities and Horizontal Tests of cryomodules Magnetic field measurements of SPS PT4 area Plus, of course, integration, RF power, Cryo, MPS, Instrumentation….

SPS plans - comments LARP remains committed to supporting this activity. Managing yearly budget and work plan to maximize US contribution in light of ever changing funding allocations. For now, “Flat is the new Up”  Revised schedule adds flexibility If LS2 starts after the 2018 run testing in the SPS more than one cryomodule would be more feasible.

LARP Plans for SPS Test Working with CERN and UK to integrate our efforts LARP plans to participate in the tests by delivering hardware And contribute to integration and installation Direct participation in MDs once the system is installed

Open questions towards the LHC Implement active alignment - OK Cryomodule configuration N of cavities per CM? 2x4 vs 1x8 vs…. Cavity design (H vs V) - is the ability to kick in both planes a requirement for any cavity? What is the *final* operating gradient/kick per cavity? Final aperture? Impedance budget --> what is the acceptable n of cavities, HOM damping requirements… Field quality requirement? Crab in both planes at both IPs? (ie. kissing) Magnetic shielding? ….and more…. We will need to finalize all of the above (and more) before deriving a baseline design of the cryomodule for the HL-LHC….in TDR in 2016? Mismatch with timing of SPS test results

US Scope of work - Today LARP R&D US Construction project Deliver one cryomodule for testing in the SPS 2 cavities, He vessels, tuners, HOM mode dampers RF power couplers, RF power, Cryogenics, local installation provided by CERN US Construction project Deliver N cryomodules with M cavities each Contain cavities, He vessels, tuners, HOM mode dampers Cryogenics, RF power, local installation provided by CERN Until a formal baseline is established and agreed by the sponsoring agency, changes in yearly funding could impact these plans Probably similar for other participants (ie. UK) CERN is involved in the process

US Construction Project Crab cavities are included among the tasks selected in December 2012 as part of the construction project in support of the HL-LHC. Feedback from DOE reminds that the effort on crab cavities should be carried through construction. Should not limit US contribution to the SPS test Working with the collaboration to define the best possible contribution. Need clear deliverables by ~2016-2017 if the project baseline is defined then

Conclusions US remains committed to contributing to the CC project in all phases all the way though the installation and commissioning in the HL-LHC Working with the active, global collaboration LARP Crab Cavities R&D well underway Starting prototype production soon SPS test contributions in the plans for yearly LARP activities US Construction project to include a significant contribution to the Crab Cavities Baseline scope and cost still in preparation