Status of the LHCb Experiment LHCb RRB at CERN 16 April 2008

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
27 th June 2008Johannes Albrecht, BEACH 2008 Johannes Albrecht Physikalisches Institut Universität Heidelberg on behalf of the LHCb Collaboration The LHCb.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Russian groups in LHCb: Status report V. Egorychev CERN-Russia JWG, October 2009.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Status of the LHCb experiment Andrei Golutvin ( Imperial & CERN & ITEP ) on behalf of the LHCb Collaboration Outline:  Introduction  Detector Subsystems.
Alignment Challenge at LHCb Steven Blusk Syracuse University LHC Alignment Workshop, Aug 3-5, 2006.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
LHCb Alignment Strategy 26 th September 2007 S. Viret 1. Introduction 2. The alignment challenge 3. Conclusions.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
First collisions in LHC
DT-LHCb coordination meeting 18 April 2016
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Micromegas Vertex Tracker Status Report
LHCb report G. Passaleva (INFN – Florence)
Test Beam Request for the Semi-Digital Hadronic Calorimeter
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
The LHCb Installation Story
Introduction Status before the 2009 run Results from the 2009 run
Status of the LHCb experiment
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
LHC Experimental Vacuum Systems Status October ‘07
Simulated vertex precision
LHCC referees’ questions, comments, requests
Preparation of LHCb for data taking
Global Alignment in LHCb Steve Blusk Syracuse University
on behalf of the LHCb collaboration Tatsuya Nakada CERN and EPFL*)
Kevin Burkett Harvard University June 12, 2001
The Pixel Hybrid Photon Detectors of the LHCb RICH
UNIZH and EPFL at LHCb.
Preparation of the CLAS12 First Experiment Status and Time-Line
Niels Tuning (Outer Tracker Group LHCb)
VELO-meeting January 25, 2007 Sub-projects: SX & SX
LHCb Trigger, Online and related Electronics
8th International Conference on Advanced Technology and
HL-LHC upgrade at IPHC news
LHCb Alignment Strategy
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Setup for testing LHCb Inner Tracker Modules
LHCb Trigger LHCb Trigger Outlook:
The LHCb VErtex LOcator
The LHCb Front-end Electronics System Status and Future Development
How can we study the magnetic distortion effect?
PERFORMANCE OF THE METAL RADIATION MONITORING SYSTEMS
Presentation transcript:

Status of the LHCb Experiment LHCb RRB at CERN 16 April 2008 CERN-RRB-2008-096 16 April 2008 Status of the LHCb Experiment LHCb RRB at CERN 16 April 2008 on behalf of the LHCb Collaboration Tatsuya NAKADA CERN and EPFL

Contents Construction and Installation Early Physics Cost and Funding Collaboration Issues Conclusions 16 April 2008 LHCb RRB Status Report

I) Construction and Installation LHCb Spectrometer OT/IT Muon System Magnet RICH1 VELO RICH2 TT Calo. System 16 April 2008 LHCb RRB Status Report

C A B 1) Experimental Area chicane for controlled access RB86 POINT 1 Mu-system HCAL ECAL RADIATION SHIELD C A B RICH2 IT+OT LHC CRYO MAG. RICH1 closed by a concrete plug-in, VELO POINT 7 Service infrastructure installed and safety system operational. 16 April 2008 LHCb RRB Status Report

Delay in completing the shielding wall →30 Apr 08 All the cooling pipes going through the chicane of the wall had to be replaced between the end of December and beginning of January due to the poor welding quality. -detector installation and commissioning work also affected- 16 April 2008 LHCb RRB Status Report

2) Beam Pipe and Magnet Vacuum pipe and VELO vacuum tank fully commissioned last autumn and ready to be used. (currently filled with ultra pure Ne) Recently evacuated once more and vacuum quality remains good. Beam Condition Monitors, produced by the Dortmund group (based on diamond detectors) installed around the beam pipe. BCM Magnet fully commissioned and the control has been tested from the CERN Control Centre. 16 April 2008 LHCb RRB Status Report

3) VErtex LOcator Both detector halves successfully installed. (funded by CH, DE, GB, NL) Both detector halves successfully installed. 16 April 2008 LHCb RRB Status Report

But making good progress. S/N>20 achieved! Commissioning is in progress: somewhat slower since not many modules can be switched on simultaneously, if not under vacuum. But making good progress. S/N>20 achieved! R-strip Si sensor with and without common mode noise subtraction 16 April 2008 LHCb RRB Status Report

4) RICH RICH-1: remaining parts are now all at CERN, (funded by CERN, CF, GB, IT) RICH-1: remaining parts are now all at CERN, quartz windows, photon funnels and lower HPD box. Photon funnel with B field distortion monitoring system mounted RICH-1 lower HPD box test insertion Installation will be completed by the end of April HPD commissioning for the upper box started: all HPDs OK 16 April 2008 LHCb RRB Status Report

RICH-2: Completed and commissioning in progress 17 HPD’s replaced Hits from 200k events with CW laser NB: A total of ~300k pixels. No threshold tuning yet. Log-scale colour coding. A few more HPDs may need to be replaced during the 2008/09 shut down. 16 April 2008 LHCb RRB Status Report

5) Outer Tracker (funded by CERN, CF, CN, DE, NL, PL) -detector installation completed + 80% of the FE electronics boxes installed (100% by the end of April) -commissioning with cosmic muons (special trigger) cosmic counter ◆ ◆ ◆ ◆ ◆ ◆ drift time distribution a track in the horizontal plane 16 April 2008 LHCb RRB Status Report

Cause of gain loss identified One long module with identical material to the production module, except using Trabond rather than Araldite, produced and being tested: so far no clear sign of gain loss seen. Trabond 260 hr Araldite 284 hr Cause of gain loss identified Heat treatment in-situ has started: 2 C-frames heated. ~4 C-frames by the end of April In-situ gain measurements with source in progress 16 April 2008 LHCb RRB Status Report

6) Silicon Tracker TT Si sensor ladders (funded by CERN, CH, DE, ES, UA) TT Si sensor ladders A side 100% installed and tested few connection problems being fixed C side 80% installed test in progress 16 April 2008 LHCb RRB Status Report

All IT sensor boxes (12). installed and connection test. started All IT sensor boxes (12) installed and connection test started. -two already tested- Radiation Monitoring System Four very thin metal foil detectors (made by the Ukrainian group) installed in front of IT boxes of T2. 16 April 2008 LHCb RRB Status Report

7) Calorimeter System (funded by CERN, CF, ES, FR, RO, RU, UA) All the detector and electronics installed and cabled. Commissioning well advanced. Cosmic ray seen by the all four detectors of the Calo system Calo system is now able to provide L0 cosmic signal for the global commissioning. 16 April 2008 LHCb RRB Status Report

9) Muon System (funded by CERN, CF, IT, RU) All MWPCs installed for M2-M5 Commissioning work in progress: connection, timing, HV, readout, etc. L0 cosmic signal with M4-M5 coincidence → clean comic ray with low number of hits Muon system is now able to provide L0 cosmic signal for the global commissioning. M1 M2 M3 M4 M5 16 April 2008 LHCb RRB Status Report

Cable chains installed. Installation of the infrastructure for the M1 wall, i.e. gas pipes and cables are in progress. Cable chains installed. After the installation of the signal cables, mount as many chambers as possible. 16 April 2008 LHCb RRB Status Report

10) Trigger and Online (funded by CERN, CF, CH, DE, FR, ES, GB, IT, NL) All the Level-0 trigger boards in hand, being commissioned In the global commissioning, Level-0 decision was made based on Calo or Muon L-0 cosmic signals and readout most of the detector subsystems (some are electronics only) muon triggered event E-cal hit H-cal hit 16 April 2008 LHCb RRB Status Report

3D event display for an L0 muon triggered event Next step is to include OT. 16 April 2008 LHCb RRB Status Report

central control login servers Online system @ surface Online System Consolidating the installed equipment. Starting with 20% of network switch and CPU farm capacity. The rest to be purchased toward the end of 2008 for the 2009 run. central control login servers file servers data base servers control/LCG network disk array (110×500GB) 16 April 2008 LHCb RRB Status Report

Integration and improvement of online and control software through regular global commissioning. control room @ surface 16 April 2008 LHCb RRB Status Report

11) Computing Physics quality software in place Event reconstruction ready for real data, track finding found to be robust against misalignment. Tracking framework is now identical for offline and HLT. Measured B field implemented and ready for test. LHCb Common Computing Readiness Challenge Simulating real data taking situation with four experiments IP8-control-room  Tier-0  Tier-1’s with nominal DAQ rate = 35 kB/event @ 2 kHz: 70 MB/sec alternating 6 hours on 6 hours off (50% duty cycle) start event reconstruction automatically @ Tier-1 successfully executed 16 April 2008 LHCb RRB Status Report

II) Early Physics Discussion on more concrete plan for the first physics with very few data, including a case for < 1 pb-1, has started. After initial calibration and alignment, some physics can be done with <108 Min.Bias events → No HLT required inclusive “low pT” physics particle ratios +/-, p/K/p, L/L vs dhdpT L polarization hyperon production inclusive J/y for c and b production and exclusive D0→K-p+ and D+→K-p+p+ -those channels are also useful for momentum and PID calibration- 16 April 2008 LHCb RRB Status Report

Physics with exclusive B decays requires HLT Physics with exclusive B decays requires HLT 5s observation of “rare” decays needs up to 2 pb-1 16 April 2008 LHCb RRB Status Report

CDF and D0 studied time dependent CP asymmetries And with more data… CDF and D0 studied time dependent CP asymmetries in Bs→J/yf: very small in the standard model CDF NB 2bs = -fs NB: If there were indeed New Physics as suggested by M. Bona et al. (arXiv:0803.0659), who combined all the CDF and D0 results, LHCb would see a 5s observation of CP in Bs→J/yf with ~200 pb-1, i.e. 10% of nominal year of data. 16 April 2008 LHCb RRB Status Report

III) Cost and Funding No change since the last RRB in October 2007 i.e. Cost: 75.341 MCHF Funding: Fully funded, with the second instalment from US-NSF for the extra contribution to the CPU’s via Syracuse (200 kUSD) expected by Nov 2008 16 April 2008 LHCb RRB Status Report

-Issue of the VELO full replacement detectors -Issue of the VELO full replacement detectors As already presented during the last RRB, 100% of 42 sensor modules needed after  Ldt = 6 fb due to the irradiation (cf. nominal LHCb physics 10 fb-1) 50% of them (21 modules) already required as spares in case of a severe beam related accident, covered by VELO groups Remaining 50% can be considered as a common item according to the MoU for M&O, Annex 7 16 April 2008 LHCb RRB Status Report

-Issue of the VELO full replacement detectors -Issue of the VELO full replacement detectors As already presented during the last RRB, 100% of 42 sensor modules needed after  Ldt = 6 fb due to the irradiation (cf. nominal LHCb physics 10 fb-1) 50% of them (21 modules) already required as spares in case of a severe beam related accident, covered by VELO groups Remaining 50% can be considered as a common item according to the MoU for M&O, Annex 7 16 April 2008 LHCb RRB Status Report

A document including the cost estimate submitted and endorsed by LHCC -Our proposal: Share the investment cost for the 21 modules (496 kCHF), pro rata, over 5 years (corresponds to 4.5% increase of M&O Cat. A ) Item Cost (kCHF) Si 180 Pitch adapter 70 Hybrids 65 TPG substrates 38 Kapton flat cables 23 Other items (transport, additional tooling, etc.) 120 NB: A document including the cost estimate submitted and endorsed by LHCC 16 April 2008 LHCb RRB Status Report

NB: after  L dt = 6 fb Si sensors and detector bases will be activated may need to follow lengthy radiation safety procedures for the replacement operation: e.g. cool down period, limited working hours, restricted working space, etc.  replacement operation might take longer than the normal annual shutdown period… pre-mounted two detector halves would be an advantage would require two new detector bases with cables etc. Decision to be taken in future once we have a better knowledge of the irradiation at LHC and of shutdown scenario, and if required, funding method would then need to be discussed 16 April 2008 LHCb RRB Status Report

-Issue on the replacement for UX85/3 (3rd Be section of the beam pipe) Leaks due to the non-conformal Be material Fixed currently by varnishing and operational However, no long term guarantee under irradiation → CERN vacuum group (AT-VAC) has requested to procure replacement piece Investigation being continued in collaboration with AT-VAC -finally responsible for the procurement and operation- Current indication is: procurement could be possible within the available funds from CERN 16 April 2008 LHCb RRB Status Report

IV) Collaboration issues New collaborator: Moscow State University, Russia 3 PhD’s and PhD students Team leader: P. Ermolov Area of contribution: Muon and VELO, where manpower needed Additional Tier-2 activity NB Russia: in the LHCb experiment since the beginning CORE contribution, 2.5 MCHF Crucial role in the detector construction for Muon (PNPI), Calo (BINP, IHEP, INR, ITEP) and Radiation Calculation (BINP) Computing (Tier-2 federation) and physics 16 April 2008 LHCb RRB Status Report

New management will take over from 1 May 2008 Spokesperson: Andrey Golutvin, Imperial College (since 4/2008) and ITEP Deputy Spokesperson: Andreas Schopper, CERN Technical Coordiator Werner Witzeling, CERN Resource Coordinator Olav Ullaland, CERN unchanged 16 April 2008 LHCb RRB Status Report

V) Conclusions All the subsystems needed for the 2008 run have been installed, except 1/4 of TT ladders and RICH-1 mechanics (quartz windows, photon funnels and the lower HPD box). Expected to be complete by the end of April. M1 installation will continue as long as possible. Commissioning work is in progress and Level-0 trigger now provides cosmic muons (with Calo- or Muon system). Preparation for early physics is underway. Eagerly looking forward to the first data in summer. VELO replacement modules for beyond 6 fb needs from the collaboration 496 kCHF. LHCb would like the RRB to agree in principle to the pro rata share of this, spread over the coming 5 years, i.e. 4.5% of M&O Cat.A. 16 April 2008 LHCb RRB Status Report