Traffic Control & Coordination

Slides:



Advertisements
Similar presentations
TRAFF-20 Development Author: Nick Rubbi Prepared: December 2011.
Advertisements

Chapter 2 Operating System Overview Operating Systems: Internals and Design Principles, 6/E William Stallings.
Discovering Computers Fundamentals, Third Edition CGS 1000 Introduction to Computers and Technology Fall 2006.
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
Operating Systems.
Advanced Evaluation Techniques and Hardware-In- The-Loop Simulation Darcy Bullock, P.E. Professor Purdue University.
RT-TRACS A daptive Control Algorithms VFC-OPAC Farhad Pooran PB Farradyne Inc. TRB A3A18 Mid-Year Meeting and Adaptive Control Workshop July 12-14, 1998.
Applied Transportation Analysis ITS Application SCATS.
Illinois Department of Transportation Emergency Management I-74 Reconstruction Project Peoria, Illinois ITS Midwest Annual Meeting February 7, 2006.
Oregon Microsimulation Roundtable March 2012
University of Management & Technology 1 Operating Systems & Utility Programs.
Control Technology and Automation
Invitation to Computer Science 5 th Edition Chapter 6 An Introduction to System Software and Virtual Machine s.
Topics of presentation
CE Operating Systems Lecture 3 Overview of OS functions and structure.
Operating System 2 Overview. OPERATING SYSTEM OBJECTIVES AND FUNCTIONS.
OPERATING SYSTEM - program that is loaded into the computer and coordinates all the activities among computer hardware devices. -controls the hardware.
Line 22 BRT: Summary Santa Clara Valley Transportation Authority May 2003.
1 RANKING OF FUNCTIONAL REQUIREMENTS/ TOPIC AREAS FOR NEEDED RESEARCH BY THE TRB TRAFFIC SIGNAL SYSTEMS COMMITTEE JULY 21, 2002 MID-YEAR MEETING IN SALT.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
SCATS 6.10 Release Review SMUG, March 2013 Sydney.
CSC190 Introduction to Computing Operating Systems and Utility Programs.
Fail-Safe Module for Unmanned Autonomous Vehicle
SUBMITTED BY: AKSHAY KAMBLE-09D223 SAURABH CHAVAN-09D210 ALOK VANJARE-12203A1012 ANAM SAYED-11D250.
SCATS Congestion Improvement Program. The Scope of the SCATS Congestion Improvement Program.
DSRC and SPaT, SSM, SRM & MAP
Lecture 11. Switch Hardware Nowadays switches are very high performance computers with high hardware specifications Switches usually consist of a chassis.
TRAFF-20 Development Author: Nick Rubbi Prepared: March 2015.
© Airspan Networks Inc. Automatic QoS Testing over IEEE Standard.
WIRELESS FIRE DETECTION
Michael Rahaim, PhD Candidate Multimedia Communications Lab
Constraints Space Load Capacity Costs Operating hours.
GCSE COMPUTER SCIENCE Computers
Home automation using Arduino & ‘PIR sensor’
Software Specification and Configuration Management
MOVA Traffic Signal Control Trial
PSCAD models.
Operating System.
Operating System 2 Overview
Unit Computer Hardware
Control Systems NASDPTS November 2016.
Operating Systems (CS 340 D)
PLC: Programmable Logical Controller
SNUG, February 2017 Tauranga
TYPES AND COMPONENTS OF COMPUTER SYSTEM
Commissioning and Testing the LHC Beam Interlock System
Session III Architecture of PLC
“What do I do ?”, “How do I do it ?”, What do I do it with ?
Signalized Intersections
IPRS-7 IP/GPRS Receiver Software
Unit Computer Hardware
Transit Signal Priority: Evolution
City of Wilmington Bike Plan Update
CS 501: Software Engineering Fall 1999
Software testing and configuration : Embedded software testing
Annual Workshop Hamilton
Operating System 2 Overview
Design of a UPC/ScanTron Reader
Operating Systems : Overview
School of Civil Engineering
Operating Systems : Overview
Operating Systems p.describe the characteristics of knowledge-based systems; q.describe the purpose of operating systems; r.describe the characteristics.
Plc & scada applications
TRAFFIC PRIORITY MANAGEMENT SYSTEM
Introduction to Hardware
TOPIC: HARDWARE AND SOFTWARE
Operating System 2 Overview
IoT Traffic Signal Panel
Overview of Computer system
Presentation transcript:

Traffic Control & Coordination Next Generation Traffic Signal Controller (VC6) Presenter : Paul Milazzo

Traffic Control & Coordination Traffic Signal Controllers in Australia All Traffic Signal Controllers currently in production for the Australian market are manufactured to the Roads and Maritime Services Specification TSC/4 All TSC/4 controllers are fully functional with SCATS All TSC/4 controllers currently run as VC5 controllers

Traffic Control & Coordination Controller Software Overview SCATS and TRAFF Software developed by Roads and Maritime Services, NSW TRAFF software integrated into the controller by manufacturers TRAFF software interacts with manufacturer developed software sometimes referred to HRS TRAFF software interacts with the controller personality (Site Specific Configuration Data) Memory allocation increased in VC6 for Personality Data

Traffic Control & Coordination System Overview SCATS TRAFF Personality HRS

Traffic Control & Coordination A TSC/4 Controller Typical Controller Current controllers can have up to the following hardware configuration: 24 Signal Groups 16 Can be configured as Vehicle Groups, and 8 Can be configured as Pedestrian Groups

Traffic Control & Coordination The New Generation Controller can have up to 32 Signal Groups These 32 Signal Groups can be ALL vehicle groups with no Pedestrian Groups or a mix as before with up to a maximum of 8 Pedestrian Groups All signal groups have lamp monitoring capabilities (some older generation controllers only monitored the first 16 signal groups) All signal groups have full conflict monitoring capabilities VicRoads Theatrette - Kew

Traffic Control & Coordination A TSC/4 Controller Typical Controller Current controllers can have up to the following hardware configuration: 32 Inputs 24 Can be configured as Vehicle Detectors (e.g. loops), or TRAM Detectors, Emergency Vehicle Inputs 8 Can be configured as exclusively as Push Button Inputs

Traffic Control & Coordination The New Generation Controller can have up to 48 Inputs and 8 Push Button Inputs This allows for addition detection features such as advance and departure detection as well as queue detection The New Generation Controller can have up to 24 Special Purpose Inputs and 24 Special Purpose Outputs These inputs and outputs can be used to controller ancillary devices The New Generation Controller can have up to 32 XSF and MSS Flags, increased from 16 of each. These flags can be used for features such as TRAM Priority.

Traffic Control & Coordination Future Development Ability to maintain co-ordination through a short communications error Increase reported operational data to SCATS for remote monitoring Implement Signal Phasing and Timing data (SPaT) Increase number of phases

Traffic Control & Coordination This is the end of this presentation. Thank you for your attention.