THEMIS THEMIS MPDR Nov 12-14, 2003 University of California, Berkeley

Slides:



Advertisements
Similar presentations
2014 Workshop on Spacecraft Flight Software 1 Pasadena, CA, December 16-18, 2014 ICON End-To-End Operations Philosophy Will Marchant, Manfred Bester, Carl.
Advertisements

Welcome to the Aerospace Educator Workshop Saturday, March 8,
Michael Lampton Overview of Space Sciences Laboratory 16 July 2003.
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS/Science Briefing 1 NASA/HQ, 03/12/2003 T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS (THEMIS) RESOLVING THE PHYSICS.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
High Altitude Scientific Ballooning (Near Space Engineering)
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
National Aeronautics and Space Administration Goddard Space Flight Center MISSION READINESS REVIEW THEMIS Cynthia M. O’Carroll GSFC Public Affairs Office.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
1 Measurement, Integration and Test Section (376) Environmental Test Laboratory Group 3765 Themis Pre-Environmental Review 3/06.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
THEMIS MISSION PDROVERVIEW- 1 UCB, November 12, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness.
Solar B Mission Operations Working Group - 3 February Page 1 SS Instrument Operations for TIMED, Cluster, & Stereo C. P. Holmes Sun-Earth Connection.
THEMIS FGM CDR Peer ReviewBerlin, April 6, UCB/Swales should identify an individual that will assume responsibility for magnetic cleanliness on.
THEMIS/MIWG#3 1 SSL, 06/15/2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
THEMIS SRR MO-1UCB, July 8-9, 2003 THEMIS Mission Overview Peter R. Harvey Project Manager Space Sciences Laboratory University of California, Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
THEMIS Project Management 1 UCB, June 14-16, 2004 THEMIS Mission CDR Project Management Peter R. Harvey University of California - Berkeley.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
THEMIS FDMO CDR Peer Review − Appendix 1June 1-2, 2004 Appendix.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MPDR / CAROR-1UCB, November 12-14, 2003 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF.
ITAR Restricted Data 1THEMIS Mission CDR 6/18/04 System Safety Overview WBS Element Tim Keepers (301)
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: Time History of Events.
April 2014 At A Glance ASIST is a real-time command and control system for spacecraft development, integration, and operations. Mature and reliable, ASIST.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
Lessons Learned Project Overview 1 Jan 29, 2008 THEMIS Introduction Jan 29, 2008.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
THEMIS FDMO Review Appendix − 1 October 5, 2004 Appendix.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 THEMIS Confirmation Assessment Project Overview Peter R. Harvey University of California - Berkeley.
Engineering and Science Directorate Organization Structure June 2016.
Kentucky Space Enterprise Missions
Mission Critical Design Review (MCDR) June 14-18, 2004
NASA Heliophysics 2017 Poker Flat Sounding Rocket Campaign Ends Successfully in Alaska The latest three sounding rockets from the Poker Flat Sounding Rocket.
THEMIS THEMIS MCDR June 14-18, 2004 University of California, Berkeley
THEMIS The THEMIS mission approach to addressing the substorm question
FIELDS Mission Assurance Manager University of California, Berkeley
THEMIS Mission Assurance
THEMIS THEMIS SRR July 8-9, 2003 University of California, Berkeley
Project Overview and Status
Kentucky Space Facilities for satellite development, testing and operation Twyman Clements1, David Jones1 ,Jason Bratcher1, Jessamyn Delgado2, Daniel Erb1,
THEMIS Mission Confirmation Readiness
THEMIS program: an Overview
Welcome to the Sciences and Exploration Directorate!
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
Significant results from 2 years of operations
Tools of Space Exploration
Launch and On-orbit Checkout
GSFC SDO Project Barbara Thompson Elizabeth Citrin Project Scientist
EagleSat 2 – Mission and Development Overview
Response to Comment on “Tail Reconnection Triggering Substorm Onset”
THEMIS Introduction Nov 6, 2007.
Presentation transcript:

THEMIS THEMIS MPDR Nov 12-14, 2003 University of California, Berkeley TIME HISTORY OF EVENTS AND MACROSCALE INTERACTIONS DURING SUBSTORMS RESOLVING THE MYSTERY OF WHERE, WHEN AND HOW AURORAL ERUPTIONS START THEMIS MPDR Nov 12-14, 2003 University of California, Berkeley

Coffee, food, and posters at Silver Addition Main Entrance (outside) Opening Remarks MPDR Presentations Coffee, food, and posters at Silver Addition Main Entrance (outside) Splinter room in Addition Library Local arrangements, see Amy Shutkin Other issues, see: Vassilis Angelopoulos or Peter Harvey Silver Addition Splinter room Samuel Silver Space Sciences Laboratory

SPACE SCIENCES LABORATORY Background Initiated in 1958 by Drs. Teller and Seaborg Multidisciplinary organization Connecting campus research to space efforts Facility opened in 1966 New facilities added in 1998 Research Efforts Involving Balloons Sounding rockets Satellite instruments & science complements Complete satellites Mission & Science Operations Ground Station Operations Agencies Involved NASA, NSF, NSBF, USAF, DOE ESA, ISAS, IKI, PSI, etc. $35M/yr (85% NASA, 15% NSF, 5% misc.)

Facilities 55000 sq. ft. Office and Laboratory Space Employing 420 Scientists, Engineers, Staff On-Site Machine Shop Clean Room Facilities to Class 100 Thermal Vacuum Facilities up to 3m diameter Spacecraft Integration Facility 4-story High Bay Radiation Sources Laboratory Mission Operations Centers Science Operations Centers 11 Meter S-Band Satellite Antenna Secure High Speed Communications to NASA

Operations Components Mission Operations Center Science Operations Center 11-meter S-Band Antenna with X-band upgrade capability High Speed Communications to NASA Ground Network Network Security Autonomous Operations Pass Supports Tracking and Data Acquisition Spacecraft Command and Control Emergency Response System Self Checking Network Security Presently tracking: IMAGE, RHESSI, FAST, CHIPSat

EXTREME ULTRAVIOLET EXPLORER Project Management Science Package Telescopes Electronics Mission Operations Science Operations  Launched on 7 June 1992 Mission Successfully Concluded 1Q2001

FAST AURORAL SNAPSHOT Science Package Electric Field Instruments Particle Instruments Electronics Mission Operations Science Operations   Launched on 21 Aug 1996 Mission Continuing through 2003

RAMATY HIGH ENERGY SOLAR SPECTROSCOPIC IMAGER Project Management Spacecraft Bus Science Package Imager Spectrometer Electronics Mission Operations Science Operations Ground Data Systems Launched February 5, 2002 Mission Operations Planned for 2 years

THEMIS is an Essential Component to Swales Corporate Growth THEMIS is Central to Swales Strategic Plan Swales has committed significant internal resources over the last 4 years to mature the THEMIS Mission design thereby enhancing the science return Swales has the Human & Financial strength to drive THEMIS to a success THEMIS Management has high visibility with weekly direct- reporting to CEO/COO We love doing this type of work! 1978 1980 1985 1990 1995 2000 2001 First direct contract with JPL First direct contracts with GSFC & NRL SAI Founded Delivered first Flight HW Delivered ISS Radiator First major contracts with LaRC Delivered FUSE OTA Successful Launch of EO-1 Acquired Thermal and Structural Products Divisions Doing Business As Awarded SMEX-Lite Commercialization First major STS Payload Contract NRL Instrument Development (LASCO / SSULI) 61% 21% 14% 4% Engineer Designer / Other Professionals Technician Support / Clerical Labor Mix

Opening Remarks THEMIS Team Attendees THEMIS NASA Attendees Vassilis Angelopoulos UCB PI Peter Harvey UCB PM Ellen Taylor UCB MSE Tom Ajluni Swales PPC Sys Engr John Bonnell UCB EFI Charles Carlson UCB ESA Davin Larson UCB SST Werner Magnes IWF FGM Alain Roux CETP SCM Paul Turin UCB Mechanisms Hari Dharan UCB Mag Booms Manfred Bester UCB Mission Ops Mgr Tim Quinn UCB Science Ops Mgr Sabine Frey UCB Orbits Eric Donovan UCalgary GBO/dply Chris Lashley Swales P&PC Mechanical Rob Eppler Swales Bus Mechanical Rommel Zara Swales Thermal Richard Leboeuf Swales ACS Mike McCullough Swales RCS Rob Kraeuter Swales EPS Steve Hammers tHC Flight Software Ron Jackson UCB Msn Assurance Jorg Fisher UCB Parts Program Tai Phan UCB Conjunctions Harald Frey UCB GBO/ASIs Chris Russell UCLA GMAGS; Mag. Clean. Joe Means UCLA GMAGs; Mag.Clean. Bob Ergun CUBoulder EFI/DFB Jim Westfall CUBoulder EFI/DFB William Liu CSA GBO/Canada Kate Harps UCB Financial Mgmt Dorothy Gordon UCB IDPU DCB Peter Berg UCB Power Mike Cully Swales PPC Mngr Nahide Craig UCB EPO THEMIS NASA Attendees Dave Sibeck GSFC Program Scientist Dennis Lee GSFC Mission Engineering John Thurber GSFC Mission Engineering Frank Snow GSFC Mission Manager Tony Comberiate GSFC Explorer Progr. Dir. Tammy Harrington KSC Launch Services Willis Jenkins HQ Program Executive

Opening Remarks Review Board Mark Goans GSFC/Systems Review Office/Co-chair Brian Keegan Honeywell/Co-chair   Joe Bolek GSFC/Systems Engineering Lou Fantano GSFC/Thermal Systems Scott Glubke GSFC/Propulsion Systems Rick Schnurr GSFC/Electrical Systems Jason Hair GSFC/Mechanical systems Terry Ford Independent/Guidance, Navigation and Control J. B. Joyce Independent/Mission Operations Ronnie Killough Southwest Research Institute/Software Frank Martin Martin Consulting, Inc./Science William Taylor Independent/Project Management Kevin Morgan IV&V Dr. Larry Cooper NASA HQ EPO Ben Burress Solar B E/PO Lead

Agenda, MPDR (Day 1)

Agenda, MPDR (Day 2)

Agenda, CAR (Day 3)

Agenda, Safety Splinter (Day 3)