Prototype Interoperation Coordination

Slides:



Advertisements
Similar presentations
Enabling Secure Internet Access with ISA Server
Advertisements

1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
H. 323 Chapter 4.
Module 5: TLS and SSL 1. Overview Transport Layer Security Overview Secure Socket Layer Overview SSL Termination SSL in the Hosted Environment Load Balanced.
GVCID parameter for Encapsulation - V2 - Oct2009 Encapsulation Service: Specifying the channel in the underlying Space Data Link Protocol Version 2/3 (Last.
2008 Spring CCSDS meeting ( Washington, USA ) SMWG 1 CCSDS Service Management Validation Test Quick Report 12. March 2008 JAXA YAGI Nobuhiro/SUZUKI Kiyohisa.
Getting Started. Edline Web Site Requirements Provide Students and Parents With: 1.A Brief Course Description 2.Your Address 3.Course Syllabus 4.Major.
1 Configuring Internet- related services (April 22, 2015) © Abdou Illia, Spring 2015.
K. Salah 1 Chapter 31 Security in the Internet. K. Salah 2 Figure 31.5 Position of TLS Transport Layer Security (TLS) was designed to provide security.
Networks Evolving? Justin Champion C208 Ext:3723
WebReport/400 TCP/IP Configuration Presented by Kisco Information Systems.
1 Enabling Secure Internet Access with ISA Server.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
SMWG-SRN-01 SMWG Iterim Meetings June JAXA SLE-SM/UM Prototype Interoperation Coordination Takashi Asama Katsuji Miyashita
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
2010 Fall CCSDS meeting SMWG UK ) 1 Prototype Test Coordination for the SCCS Service Management (B-1) 26th October, 2010 JAXA ASAMA
2011 Fall CCSDS meeting SMWG 1 JAXA Prototype Test Report for the SCCS Service Management (B-1) 3rd November, 2011 JAXA ASAMA
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
SMWG Closing Report Erik Barkley Chair, SMWG Interim Meeting Greenbelt, MD, USA June 2007 Draft 1.
NETWORKING FUNDAMENTALS. Network+ Guide to Networks, 4e2.
CSS-SM Refactoring Proposal Scope –Allow inclusion of services or modifications to existing ones without having to reedit the entire CSS-SM book. Objectives.
SMWG-JAXA April JAXA SLE-SM/UM Prototype Implementation Status Nobuhiro Yagi 25.April.2007 Telecon.
1 12 March 2008 JPL/DSN/CSSXP Overview and Findings JPL/DSN/CSSXP Overview and Findings Crystal City, USA 12 March 2008 Erik Barkley (JPL)
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
© 2005 Cisco Systems, Inc. All rights reserved. BGP v3.2—1-1 BGP Overview Establishing BGP Sessions.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Apr 1, 2003Mårten Trolin1 Previous lecture Certificates and key management Non-interactive protocols –PGP SSL/TLS –Introduction –Phases –Commands.
SLE-SM Briefing 12 March 2008 Page 1 Arlington, VA Space Link Extension (SLE) Cross Support Services Presented by Hugh Kelliher Director Space ConneXions.
Welcome POS Synchronize Concept 08 Sept 2015.
NAT (Network Address Translation)
Training Objectives About D2F Download Installation Configuration
SMS module HDL-MGSM.431.
JAXA CCSDS Secretary Office
CS408/533 Computer Networks Text: William Stallings Data and Computer Communications, 6th edition Chapter 1 - Introduction.
Bruno Saba DCT/TV/IN 26/04/2010
ESAW Workshop 2009 Martin Götzelmann, VEGA Yves Doat, ESA/ESOC
CCSDS Reference Architecture
Cross Support Architecture WG: Charter and Work Plan
Network Fundamentals – Chapter 5
Joint IPR/DAI Workshop
IPSec VPN Chapter 13 of Malik.
Introduction to Networking
ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG)
Net 431: ADVANCED COMPUTER NETWORKS
Setup Of 4050 EIP To Control LOGIX PLC
Subject Name: Computer Communication Networks Subject Code: 10EC71
CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code 450/Code 572 April 2003.
Anatomy of a Wireless LAN – Part I
JAXA CCSDS Secretary Office
Communications & Computer Networks Resource Notes - Network Software
NET323 D: Network Protocols
Setting Up Firewall using Netfilter and Iptables
Firewalls Routers, Switches, Hubs VPNs
FAFSA-Apply Today! Presented by McDaniel College.
Configuring Internet-related services
Chapter 4 Introduction to Network Layer
Welcome! To the ETS – Encumbrance Certified Copy of Encumbrance
CT 1306 Communication Networks Management Lab
Welcome! To the ETS – Encumbrance Certified Copy of Encumbrance
Priorities and contents of releases
Chapter 7 Network Applications
<Your Team # > Your Team Name Here
Module 9 Troubleshooting.
IOT and ZigBee Wang Zhongsheng Xi'an Technological University,
Purchase Document Management
Student Accounts Receivable
KX-NS Step by Step Guide Initial Setup
Presentation transcript:

Prototype Interoperation Coordination 4th.Oct.2007 Katsuji Miyashita miyashita.katsuji@sorun.co.jp SMWG CCSDS Meetings Oct. 2007

1.1 SLE Service Management Status of JAXA 1.1 SLE Service Management Development of prototype system in JAXA --> Just finished the development. (Except specific schema of “Modulation Type Option”.) Security method --> Use only XML encryption. --> Need to exchange the Public Key with X.509 Certification by means of e-mail. JAXA will provide it by Oct 12. Modulation Type Option --> We agreed in September telecon that the modulation type PCM/PSK-PM is added specially and the new schema is provided by JPL. But JAXA thinks now that the additional specific parameters for ALOS is necessary into the schema, so JAXA will coordinate with JPL about it. SMWG CCSDS Meetings Oct. 2007

1.1 SLE Service Management (Cont.) Exchange ServiceAgreement --> The parameters of Return and Forward will be exchanged by operations of Service Management, though the transfer service is performed only RAF service. --> At this meeting, we would like to coordinate the uncertain items which of JPL/JAXA provide in service agreement. The items (included JAXA proposal) to be provided by JAXA is shown by Oct 12, and the items by JPL is expected by Oct 19. SMWG CCSDS Meetings Oct. 2007

1.1 SLE Service Management (Cont.) Samples --> We will send a actual OEM of ALOS by e-mail on Oct 12(TBD), which was generated by Flight Dynamic. Please check its’ contents. --> The following XML samples generated by JAXA/UMR-1 will be sent by e-mail on Oct 12, but they are not encrypted. Please check them. ATP-I, ACP-I, CSP-I Requirement --> After all parameters are fixed, we would like JPL to set up the CSSXP by the parameters by around Oct 26. SMWG CCSDS Meetings Oct. 2007

-->JAXA proposal is provided on Oct 4. 1.2 SLE Transfer Service The Version of Transfer Service [ B-1 vs R-2(2000) ] --> Agreed to perform only RAF service in Interoperability test and Shadow track test between JAXA/TKSC and JPL/DSN. Communication for the Transfer Service --> Scheduled Line Check on Nov 6. Network Configuration --> JAXA would like to coordinate with JPL directly. ex.) ISDN parameters, IP address, Port Number, etc. -->JAXA proposal is provided on Oct 4. JPL response is expected by Oct 19. SMWG CCSDS Meetings Oct. 2007

1.2 SLE Transfer Service (Cont.) Parameters of RAF service --> We sent the parameter sheet for RAF service to JPL on Oct 4, and it includes the parameters which does not appear in service agreement. --> The parameters is necessary to be fixed before the Interoperability Test. Requirement --> We would like JPL to decide the above parameters of both network and RAF service, and inform to us by Oct 19. SMWG CCSDS Meetings Oct. 2007

Table 2-1 Test Schedule (Proposal) 2. Interoperability Test Plan 1) Schedule Table 2-1 Test Schedule (Proposal) SLE Service Management Test Prime 0000-0500 UT Oct 30, 2007 (TBD) Backup 0100-0300 UT Nov 6, 2007 SLE Transfer Service Test Nov 13, 2007 Nov 20, 2007 NOTE: The working day time is around as follows; JAXA 0030-0845 UT JPL 1700-0100 UT 2) Confirmation Is it possible to generate the simulated telemetry data (VCDU) at JPL ? Which equipment generate ? (Ref. Figure 2-1) SMWG CCSDS Meetings Oct. 2007

2. Interoperability Test Plan (Cont.) JPL JAXA/TKSC SLE Fwd Service Provider (CCP) Router Router Test Mod ISDN Circuit SLE UGW (TSX-UGW) Voice System Voice System SLE Rtn Service Provider(T DS) End User Simulator SLE SM/CM (CCSXP) SLE SM/UM (Red-1) (UMR-1) Internet CM-TH Figure 2-1 TEST CONFIGURATION SMWG CCSDS Meetings Oct. 2007

3. Schedule JAXA will provide new schedule. According to set shadow track testing on Jan 2008 by 17th Oct. SMWG CCSDS Meetings Oct. 2007