Presented by: Fred Kessler Nossaman LLP

Slides:



Advertisements
Similar presentations
AAAE Airport Finance & Administration Conference Daytona Beach, Florida March 4-7, 2012 Federal Controls on the Use of Airport Revenue Pablo O. Nüesch.
Advertisements

Interstate 2.0: a 21 st -Century Network Financed by All- Electronic Tolling by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Managed Lanes in Washington State
Expanding the Potential of Tolling: A 21 st Century Look AASHTO November 18, Brian Peters Florida DOT, Assistant Secretary of Finance and Administration.
Wisconsin Transportation Finance and Policy Commission Freight Rail Day 2012 October 26, 2012.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
I-15 Managed Lanes: Building on Success And Lessons Learned I-15 Managed Lanes: Building on Success And Lessons Learned.
MAP Washington State Public Transportation Symposium August 26, 2013.
EXPRESS LANESEXPRESS LANES Executive Workshop Wednesday, September 18, 2013.
FHWA Policy and Guidance
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration Department of Transportation Enabling Congestion Pricing in the.
MAKING IT HAPPEN. AASHTO Annual Meeting Pittsburgh, PA November 18, 2012 Expanding the Potential of Tolling: A 21st Century Look Federal Tolling Law under.
Presentation to the Subcommittee on Highways and Transit and the House Committee on Transportation and Infrastructure Peggy Catlin, Deputy Executive Director.
Joint I-680 Sunol JPA & I-580 Policy Committee Workshop – September 9, 2013 A Presentation for the I-580 Express Lane Policy Advisory Committee April 9,
Jeffrey F. Paniati Executive Director Federal Highway Administration US Department of Transportation Washington, DC Reducing Congestion Tools of.
Tolling and Congestion Pricing Patrick DeCorla-Souza Office of Innovative Program Delivery Federal Highway Administration Presentation to Transportation.
CEE 8207 Design of Sustainable Transportation System CEE 8207 Design of Sustainable Transportation System Today’s Topic A tool of sustainability Types.
Urban Road Pricing: US DOT Congestion Initiative and Urban Partnerships 14 th World Congress on ITS IBEC Special Session October 10, 2007 Beijing Exhibition.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
Soup to Nuts: Changing Operating Parameters for HOV Facilities Sponsored by the HOV Pooled-Fund Study and the Federal Highway Administration.
Convergence of Transportation Policy and RFID Enabler of Future Transportation Policy Chris Body Mark IV Vice President, Business Development.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Tolling and Pricing Opportunities Under the Federal-aid Highway Program January 2006.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey A. Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
High-Occupancy Toll (HOT) Lanes Recent Developments Planning and Operations Committee September 9, 2005.
Regional HOT Lanes Study Preliminary Findings An Informational Hearing of the Senate Transportation and Housing Committee Toll Roads and Managed Lanes.
US DOT Congestion Initiative Urban Partnership Agreements I-95 Corridor Coalition EPS Summit September 19, 2007 Boston, Massachusetts Jeffrey F. Paniati.
Transportation leadership you can trust. Electronic Tolls and Congestion Pricing Study Phase Two Interim Report – Implementation Considerations presented.
SAFETEA-LU Operations, ITS, and Freight Provisions Jeffrey F. Paniati Office of Operations Federal Highway Administration U.S. Department of Transportation.
Interstate Tolling: Why and How by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation
MAKING IT HAPPEN. TRB 88 th Annual Meeting Risk Management in Public-Private Partnerships January 14, 2009 Statutory and Public Policy Approaches to PPP.
Interstate 2.0: a 21 st -Century Network Financed by All- Electronic Tolling by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
US DOT Congestion Initiative Urban Partnership Agreements NTOC Summer Meeting September 7, 2007 Washington, DC Jeffrey F. Paniati Associate Administrator,
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
Fixing America’s Surface Transportation (FAST Act) Association of MPOs 444 N Capitol St., NW Suite345 Washington, DC
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Revenues Sources for Transportation Financing Jeffery A. Richard Foster Pepper & Shefelman.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
Rebuilding Our Nation’s Aging Interstate System
Rebuilding Rhode Island’s Aging Bridges with Truck Tolling
AASHTO 2016 NTPEP Annual Meeting May 9, 2016
CDBG: California’s Redesign and Public Outreach
Evaluation of a New Approach to Address Metropolitan Congestion
Integrating Transit and Highway Solutions In High Volume Corridors
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Charlotte Region Fast Lanes Study
I-77 High-Occupancy Toll Lanes
Overview of FHWA CMAQ & System Performance Measures
21st Century Transportation Committee Finance Subcommittee
Lessons Learned from HSIP & CMAQ
Nick Wood, P.E. Texas A&M Transportation Institute
AIRLINE TRANSPORTATION AERO 4100 / 5100
Regional Transit Formula Fund Policies Section 5307/5340 – Urbanized Formula Fund Section 5337 – State of Good Repair Section 5339 – Bus and Bus Facilities.
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
AASHTO Committee on Funding & Finance
PROBLEM: how do you price lane capacity?
Orange County Transportation Authority Citizens Advisory Committee
Portland Metro Region Value Pricing Under HB 2017
I-81 Corridor Improvement Plan
State Infrastructure Bank
by Robert W. Poole, Jr. Director of Transportation Policy
MAP-21: Current Federal Transportation Policy
NEPA Assignment Program Overview
Safe Routes to School John Schaefer State Coordinator.
Webinar: Responding to the FHWA CMAQ & System Performance Measures:
Presentation transcript:

Presented by: Fred Kessler Nossaman LLP fkessler@nossaman.com AASHTO Annual Meeting Pittsburgh, PA November 18, 2012 Expanding the Potential of Tolling: A 21st Century Look Federal Tolling Law under MAP-21 Presented by: Fred Kessler Nossaman LLP fkessler@nossaman.com

Overview Federal tolling law before MAP-21 Key changes in federal tolling law under MAP-21 General Interstates Other highways, bridges and tunnels Managed Lanes and HOVs Use of Toll Revenues Value Pricing Pilot Program Examples Policy question

Federal Tolling Law Pre-MAP-21 General federal prohibition on tolling federal-aid projects Narrow exceptions subject to FHWA approval of §129 agreement HOT lanes under §166 Four pilot tolling programs Value Pricing Pilot Program – 15 statewide slots, 1 vacancy. 7 permanently reserved via coop agreements Express Lanes Demonstration Program – expired 9/30/12. 15 slots, 5 agreements. Allocated slots now to proceed under §129 Interstate System Construction Toll Pilot Program – expires 8/19/15. 3 slots, 2 vacancies. Mainstreamed by MAP-21 Interstate System Reconstruction and Rehabilitation Pilot Program – 3 slots; 0 vacancy

Key Changes under MAP-21 General Expanded opportunities to toll as matter of statutory right under §129. No FHWA approval or agreement needed Central principle: No net loss of free, non-HOV lane capacity on highways Managed lanes enabled, but real confusion with HOV conversions to managed lanes FHWA guidance issued 9/24 http://www.fhwa.dot.gov/map21/guidance/guidetoll.cfm

Key Changes under MAP-21 Interstates Initial construction (i.e. before opened to traffic). Replaces Interstate System Construction Toll Pilot Program New capacity. Number of non-HOV toll-free lanes cannot be reduced. May include HOV conversion to HOT lane. No qualifiers. Replaces Express Lanes Demo Program Highway reconstruction. Number of non-HOV toll-free lanes cannot be reduced. May include HOV conversion to HOT lane, but: Conversion must be to an automated congestion management tolling system; and HOVs in converted lanes must be exempt from tolls Bridge or tunnel reconstruction or replacement. No qualifiers. Entire facility may be tolled

Key Changes under MAP-21 Other highways, bridges, tunnels Initial construction (i.e. before opened to traffic) New capacity. Number of toll-free lanes cannot be reduced Reconstruction of tolled facility Reconstruction and conversion to toll facility. No qualifiers. Entire facility may be tolled Conversion of HOV lane to toll facility. No qualifiers

Key Changes under MAP-21 Managed Lanes and HOVs §129(a)(1)(H): Authorizes conversion of HOV lane to toll facility. No tolling agreement, no qualifiers. §166(b): Authorizes conversion of HOV to HOT lane. No tolling agreement, but with qualifiers: Conversion must be to an automated congestion management tolling system HOVs in converted lanes must be exempt from tolls Must annually certify vehicle eligibility; operational performance monitoring, evaluation and reporting; enforcement No degradation in service permitted – before and as a result of conversion – with annual reports of service impacts

Key Changes under MAP-21 Managed Lanes and HOVs How to reconcile? Sept. 24 guidance: §129 has no specific authority allowing non-HOVs to use HOV lanes This authority only comes from §166 So, §166 governs all conversions of HOV lanes to toll operations

Key Changes under MAP-21 Managed Lanes and HOVs HOV non-degradation requirements Degradation = <45 mph average speed 90% of morning or evening peak period time for 180-day period New MAP-21 requirement to cure degradation within 180 days – increase HOV occupancy; vary tolls on non-HOVs; discontinue non-HOV use; increase HOV capacity If fail, FHWA must impose sanctions - withhold Federal funds; withhold project approvals; any other appropriate action

Key Changes under MAP-21 Use of Toll Revenues Limits on use of toll revenue clarified New requirement for annual audit to verify adequate maintenance, proper revenue use Secretary may order toll suspension for non-compliance with limitations on use until agreement reached on achieving compliance

Value Pricing Pilot Program VPPP still useful Available in 15 states FHWA uses it only if mainstream tolling programs (§129, §166, ELDP) unavailable to accommodate Useful for, e.g.: HOV/HOT lanes conversion with some HOV tolling Free lane to managed lane conversion Truck only toll lanes Cordon pricing Regional express lane program Other pricing variations

Examples Example 1: 6-lane interstate route, no HOV lanes State wants to: (1) Expand to 8 lanes and toll 2 lanes. Permitted under MAP-21? (2) Expand to 8 lanes, with 2 managed lanes in each direction. Permitted under MAP-21?

Examples Example 2: 8-lane interstate, including 1 degraded HOV-2 lane in each direction. State wants to: (1) Expand to 10 lanes, convert HOV to managed lane, no tolling of HOVs. Permitted under MAP-21? (2) Expand to 10 lanes, with 2 managed lanes in each direction, including conversion of HOV lane, tolling of HOV-2s. Permitted under MAP-21? (3) Same as (2), except toll all HOVs in peak periods

Is there a continuing rationale for federal tolling restrictions? Policy Question Is there a continuing rationale for federal tolling restrictions?

777 South Figueroa Street, 34th Floor Contact Fred Kessler Nossaman LLP 777 South Figueroa Street, 34th Floor Los Angeles, CA 90017 213.612.7829 fkessler@nossaman.com