Outline Introduction to LCLS Some background on SLAC Timing

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
Stephanie Allison Facility Advisory Committee Meeting Apr 16, 2007 Timing and Event System S. Allison, M. Browne, B. Dalesio, J.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
INTRODUCE OF SINAP TIMING SYSTEM
Overview of SINAP Timing System Electronics Group Beam Diagnostics & Control Division SINAP.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April Kukhee Kim.
John Dusatko 2012 EPICS Timing Workshop The SLAC Timing System April 24, The Accelerator Timing System at SLAC: Experiences, Ideas & Future Plans.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Micro-Research Finland Oy Timing System Modules Jukka Pietarinen EPICS Collaboration Meeting, Argonne, June 2006.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS-I/LCLS-II Timing System Low Level Kukhee Kim for LCLS Timing Team ICD Software,
1 Timo Korhonen PSI 1. Concepts revisited…again 3. New (Diamond) cards features and status 4. EPICS interface 5. Conclusions SLS & Diamond Timing System.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
EPICS Collaboration Meeting Timing Workshop April 24, 2012.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
Outline Introduction to LCLS Some background on SLAC Timing
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
SLAC Aerial View. SLAC Timing System Specifications Blue Book: (~1968) - Resolution: 50 nSec - Jitter: 15 nSec - Main Trigger Line Waveform: + /
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
John Dusatko USPAS Fundamentals of Timing & Synchronization January 25, 2008 / Santa Rosa, CA 1 The LCLS Timing & Event System -
TOP Electronics Status & Beam Test Experience Kurtis Nishimura January 16, 2012 University of Hawaii Belle II TRG/DAQ Workshop Belle II TRG/DAQ - January.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
MicroTCA Development and Status
LCLS_II High Rep Rate Operation and Femtosecond Timing
SLAC I&C Division / EE Department
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
SLS Timing Master Timo Korhonen, PSI.
LCLS Timing Software and Plan
MICE AFEIIt Timing and Triggering
SLAC Timing System Overview
Timing and synchronization at SPARC
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
WP02 PRR: Master Oscillator and RF Reference Distribution
Event Displays for EVR IOCs
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Timing Outline Scope The order of things
A Portion of the SCP RF Control System LCLS Related
LCLS Event System - Software
Low Level RF Status Outline LLRF controls system overview
BESIII EMC electronics
EPICS Collaboration Meeting
Timing and Event System for the LCLS Electron Accelerator
LCLS Timing Outline Scope The order of things
Low Level RF Status Outline LLRF controls system overview
LCLS RF Stability Requirements
Linac Coherent Light Source (LCLS) Low Level RF Status
SLS & Diamond Timing System update
Beam Synchronous Acquisition on IOC
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Breakout Session SC5 – Control Systems
EVG-to-EVR Data Transfer (Dayle Kotturi)
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Breakout Session: Controls
Timing and Event System Status DOE Review of the LCLS Project SC5 - Controls Systems Breakout Session S. Allison, M. Browne, B. Dalesio, J. Dusatko,
Breakout Session SC3 – Undulator
Presentation transcript:

The LCLS Timing & Event System - An Overview – John Dusatko / Accelerator Controls

Outline Introduction to LCLS Some background on SLAC Timing The SLAC Linac Timing System The LCLS Timing System Issues Future Direction Conclusion

Introduction

LCLS Introduction The Linac Coherent Light Source is an X-ray FEL based on the SLAC Linac: 1.0nC, 14GeV e- are passed thru an undulator, a Self Amplifying Stimulated Emission process produces 1.5 Angstrom X-Rays. LCLS is an addition to the existing SLAC Linac: it uses the last 1/3 of the machine This is important to note because we have to integrate the New LCLS Timing System with the Existing Linac (SLC) Timing System.

The LCLS – Schematic View (ignoring photon beamline) Single bunch, 1-nC charge, 1.2-mm slice emittance, 120-Hz repetition rate… 6 MeV z  0.83 mm   0.05 % 135 MeV z  0.83 mm   0.10 % 250 MeV z  0.19 mm   1.6 % 4.54 GeV z  0.022 mm   0.71 % 14.1 GeV z  0.022 mm   0.01 % Linac-X L =0.6 m rf= -160 rf gun new Linac-1 L 9 m rf  -25° Linac-2 L 330 m rf  -41° Linac-3 L 550 m rf  -10° Linac-0 L =6 m 21-1b 21-1d X 21-3b 24-6d 25-1a 30-8c undulator L =130 m ...existing linac BC-1 L 6 m R56 -39 mm BC-2 L 22 m R56 -25 mm DL-1 L 12 m R56 0 LTU L =275 m R56  0 SLAC linac tunnel research yard (RF phase: frf = 0 is at accelerating crest)

LCLS Timing – Some Definitions The LCLS Timing System can be viewed as consisting of three parts: Part 1: ‘Standard’ Accelerator Timing 10ps Triggers for Acceleration and Diagnostics Part 2: S-Band Timing 2856MHz LCLS RF Phase Reference Distribution Part 3: Ultra-Precise Timing 10fs Synchronization for Experiments (LBL System)

LCLS Timing – Some Definitions The LCLS Timing System can be viewed as consisting of three levels: Part 1: ‘Standard’ Accelerator Timing 10ps Triggers for Acceleration and Diagnostics ‘Triggers’ are signals from the timing system used by HW to accelerate & measure the beam Part 2: S-Band Timing 2865MHz RF Phase Reference Distribution Part 3: Ultra-Precise Timing 10fs Synchronization for Experiments (LBL System)

LCLS Timing – Performance Requirements LCLS Timing System Requirements Maximum trigger rate: 360 Hz (120Hz) Clock frequency: 119 MHz Clock precision: 20 ps Delay Coarse step size: 8.4 ns ± 20 ps Delay range; >1 sec Fine step size: Max timing jitter w.r.t. clock; 10ps rms Differential error (skew), location to location: 8 ns Long term stability: Signal Level: TTL

Requirements Comparison Timing Reqmts for earlier SLAC systems: Original Linac: (~1968) Resolution: 50 nSec - Jitter: 15 nSec - Main Trigger Line Waveform: + / - 400 Volts PEP – II: (~1998) - Resolution: 2.1 nSec - Jitter: 20 pSec - NIM Level Waveform: 0 to –0.7 V into 50 Ohms

Background

SLAC’s Timing Systems In order to explain the New LCLS timing system, we first need to understand how the old SLAC timing system works – i.e. how we got from there to here The SLAC Accelerator complex consists of several machines: Linac, Damping Rings, Stanford Linear Collider, PEP-II, FFTB, NLCTA / each with its own timing sub-system The overall timing system consists of incremental add-ons to the original system Design Challenge for LCLS Timing System was that it had to know about and work with the existing system

(pre-LCLS) SLAC Accelerator Complex (Lots of Pieces)

SLAC Linac Timing System

Old SLAC Timing System We’ll talk a little about the existing SLAC Linac Timing System: The Linac is a Pulsed Machine (get a packet of beam per pulse) runs at a max of 360Hz (120Hz) Three Main Timing Signals: 476MHz Master Accelerator Clock (runs down 2mile Heliax Main Drive Line cable) 360Hz Fiducial Trigger (used to ‘tell’ devices when the beam bunch is present) / encoded onto the 476MHz master clock 128-Bit PNET (Pattern Network) Digital Broadcast (contains trigger setup, beam type & rate information)

Some More Details Why 360Hz? PNET Broadcast Original design rate of the Linac / derived from the 3-phase, 60Hz AC power line frequency: want to trigger devices (Klystrons, etc.) consistently so as to not create huge transients on the Power Line Sync’d to 476MHz PNET Broadcast A special computer called the Master Pattern Generator (triggered by the 360Hz fiducial) broadcasts a 128-bit digital message containing information (PP/YY beamcode, conditions, rate, charge, etc.) about the beam This is used by the local sectors computers (micros) to set up triggers and their delays Sent over SLAC coax cable TV network

Source: SLAC Blue Book c.1962 How The 360Hz is Generated The Sequence Generator creates a 360Hz signal as well as 6 Timeslot pulses (used for further synchronization) Source: SLAC Blue Book c.1962

Timing HW at Head-End of Linac For Phase Stabilization Source: D. Thompson

Generation of The Linac Timing Signal (AM Modulator) The 360Hz Signal is Amplitude Modulated onto the 476MHz Accelerator Clock and propagated down the Main Drive Line. The AM process is not ideal and some FM occurs; in addition, the signal gets more dispersed as it heads down the 2 mile MDL

Linac RF Phase Reference Distribution This slide is to give you an idea of how the Linac Phase Reference is used Each sector (30 total) taps off the MDL, to extract the RF clock This is just the Phase Ref, trigger generation is accomplished by a different set of HW

CAMAC Trigger Generation PNET Data on Serial Link Timing CAMAC Crate Old Timing System (CAMAC based) generates triggers by combining the RF Clock, 360Hz Fiducial and PNET Data (processed by local micro) 476MHz is divided/4 to get 119Mhz + fiducial by another system / This is because the older technology HW could not run at 476MHz PNET Data on Serial Link The Programmable Delay Unit (PDU) Module generates the triggers. It contains digital counters that get set with delay values from PNET and started when the Fiducial Pulse comes along

The LCLS Timing System

Finally – The LCLS Timing System Old CAMAC System is no longer viable for new Systems (performance limited, obsolete) Seek to implement a new Timing System that has similar functionality, better performance, and can be laid atop the old system, working alongside it In addition, LCLS has have its own master oscillator (PLL sync’d with Linac MO) and local phase reference distribution system at S20 LCLS System is VME based, using High-Speed digital serial links to send Clock, Trigger and Data all on one optical Fiber to timing clients

The LCLS Timing System New Timing HW (COTS): Originally designed for UK Diamond Light Source Event Generator (EVG): Similar to the MPG Event Receiver (EVR): Similar to the PDU Timing is more closely integrated into each sub-system: Each Subsystem has its own EVR (living in VME crate with an IOC) Compared to SLC timing which had multiple types of devices served by one PDU typically LCLS Timing is architected as a Star network with one master broadcasting to many clients

Timing Compare/Contrast SLC Timing: CAMAC Based Copper data cable @ 5Mb/s PDU Triggers: NIM-Level Width: Fixed @ 67ns Polarity: Fixed NIM level Delay Range: 0…2.7ms (5.4ms) Step size: 8.4ns (100ps w/VDU) 16 outputs per PDU One PDU per CAMAC crate SCP-Based LCLS Timing: VME Based Fiber data & clk cable @ 2.38Gb/s EVR Triggers: TTL-Level (can have others) Width: Adjustable: 8.4ns…550us Polarity: Selectable Pos/Neg Delay Range: 0…36 seconds Step size: 8.4ns (420ps w/EVR-RF) 14 outputs per EVR Can have multiple EVRs per VME Crate EPICS-Based

LCLS RF Front End LCLS Master Osc – slaved to Linac MO / Lower Phase noise req’d by LCLS LCLS Timing gets 476Mhz from Here

LCLS Timing/Event System Architecture ~ Linac main drive line Low Level RF FIDO PDU Raw 360 Hz LCLS Timeslot Trigger LCLS Timing System components are in RED LCLS Master Oscillator 476 MHz Linac Master Osc Sync/Div 119 MHz 360 Hz System is based around the EVent Generator and EVent Receiver SLC MPG P N E T I O C E V G F A N SLC events LCLS events fiber distribution Precision<10 ps * EPICS Network Digitizer LLRF BPMs Toroids Cameras Wire Scanner SLC klystrons I O C E V R D E V TTL * m P P N E T P D U TTL-NIM convert. *MicroResearch SLC Trigs

The Event System Based on Commercial Hardware (MicroResearch Finland) Which was based on a design from ANL-APS Timing System Designed Around Xilinx Virtex-II FPGAs Uses FPGA’s internal High-Speed 2.38 Gb/s Serial xcvr, which connects to a fiber optical transceiver FPGA logic implements all of the timing functions Uses 119MHz clock from Linac which get multiplied up to by FPGA internal PLL to 2.38GHz EVG sends out 8-bit event code to EVRs along with clock and trigger information over one fiber EVR Receives event code & with its associative memory, generates a trigger with a delay set by digital counters

The Event System Upon RX’ing a 360Hz Fid, the EVG sends out a stream of serial Data to the EVRs over a fiber link. The serial stream consists of 16-bit words sent every 8.4ns. Each word contains an Event Code byte and some trigger setup data

Event Generator EVG contains a RAM that gets loaded with event codes, based on PNET data. 360Hz Fiducial causes the RAM to get sent out over the Serial fiber link to the EVRs. In addition, there is a 2K data buffer that gets loaded with the PNET pattern and EPICS timestamp. This data is used by the EVRs

Event Receiver Buffer Data (PNET & EPICS Timestamp) is stored here for use by EVR CPU EVR contains another RAM that looks for matches of event codes to its contents. If match, it starts a counter running that generates a trigger

Trigger Generation Process How an LCLS trigger is generated: PNET message broadcast (following a Fiducial) VME PNET receiver in LCLS Master Timing Crate rx's the PNET broadcast and gen's IRQ to VME CPU The Master Timing VME CPU takes the PNET data and uses it to assign the proper event codes (MPG xmits pipelined pattern data 3 fids ahead) Event Codes setup in EVG one cycle ahead Next Fiducial is Sent  360Hz Fiducial signal rx'd by EVG The EVG begins to send out the event codes in its Sequence RAM The event codes get sent across the serial fiber links to the EVRs Inside the EVR, its mapping RAM (assoc memory) is set to map a specific HW trigger to an event code. When the Event Code matches the same value in the mapping RAM, a hit is generated and after a programmed delay, a HW trigger is output from the EVR to the device.

EVG Hardware Event Generator VME-64x Module: Sits in Master Timing Crate with VME PNET receiver and Master Timing CPU. Receives 119MHz reference and 360Hz master timing fiducial from SLC timing system. Receives PNET pattern from SLC system. Broadcasts timing system data in the form of a high-speed 2.5Gb/s serial data stream to the EVRs over an optical fiber.

EVR Hardware Event Receiver Comes in two flavors: VME and PMC. Receives 2.5Gb/s serial datastream from EVR and generates triggers based on values of the event codes. Also receives and stores PNET timing pattern, EPICS timestamp and other data and stores them in an internal data buffer. Can output 14 total pulsed-output triggers and several more level-type Triggers are output via a rear transition module (not shown) Trigger delay, width, duration and polarity are fully programmable Trigger signal level format is TTL VME Version has 10ps jitter PMC Version has 25ps jitter

Fanout Hardware Fiber Fanout Module Basic function is to receive one optical signal and generate copies of the same signal for transmission. 1:12 way fanout (1 In  12 Out) Contains Clock-Data Recovery (CDR) circuitry to re-generate & clean-up the signal Fits into a VME crate, but ONLY uses power Uses commercial SFP (Small Form-factor Pulggable) optical xcvrs SFP units are hot-swappable Front Panel LEDs indicate link health No other diagnostics than this There is one of these modules at each critical distribution point in the system / if one module fails, it takes timing out for a large group of clients

System SW

What Happens during one 2.8mS machine interval: Record processing (event, interrupt) Hardware Triggers Receive pattern for 3 pulses ahead Triggering Event Codes Start Beam Kly Standby Event Timestamp, pattern records, and BSA ready Acq Trigger Kly Accel Fiducial Event Received Fiducial F3 B0 18 500 1023 0.3 100

LCLS Systems – Master Timing Rack  Located in LI20 RF Hut (Rack LKG-21) Master FODU Connects fibers to Long-Haul Trunks for entire machine Master Timing Crate Contains: VME CPU VME PNET Rx EVG Master Fanouts 119MHz Synchronizer Chassis

LCLS Timing System – BPM Client  What you’d see in a typical service building (e.g. B105) … BPM Crate w/VME-EVR Rx FODU & Fanout Crate Rear of BPM Crate / Showing Trigger Rear Transition Module

LCLS Timing System – Other Clients Toroid Crate w/PMC-EVR Profile Monitor Crate w/ (4) CPUs & PMC-EVRs MCOR Magnet Crate Rear of Toroid Crate / Showing Trigger Rear Transition Module

Performance The Event System Trigger Jitter was measured using an Agilent Infinium 54845A Digital Oscilloscope in Jitter Histogram Mode / data was collected for 30 minutes The EVR output (shown) was measured against the system input trigger (360Hz fiducial) The Actual jitter performance is much better after subtracting off the intrinsic jitter of the scope: Actual Jitter: JITTERsystem = [ (JITTERsys_meas)2 – (JITTERscope)2 ]1/2 Event System Jitter: JITTEREVR =[ (9.7472ps)2 – (6.3717ps)2 ]1/2 = 7.3763 ps EVR jitter w.r.t. fiducial 9 ps rms jitter

Problems Seen Thus Far: Issues Current LCLS Timing System has growing pains (integration w/old system, SW, HW) Use of commercial HW doesn’t quite fit our needs / having to modify EVG & EVR Problems Seen Thus Far: “Trigger Storms”: Due to LCLS Master Osc unlocking / Fix: New MO / De-Couple LCLS Timing Sys from it (connect direct to MDL) Dead Links: Fibers / Xcvrs / Still Troubleshooting

LCLS Timing – Future Directions MPG Replacement: Planning on Moving the EVG Master Crate to MCC and Replacing the MPG Micro With it (probably in 2009 some time..) Additional Diagnostics: Designed & Built New Syncer Chassis with added diagnostics: Fiduciual Loss, Rate Monitors, RF Input Power, Clock Lock Detect, Clock Rate Monitors, etc. Status: Chassis Installed / Need to wire up diagnostic readout HW and finish the SW Would like to re-design the Fanout modules to take advantage to the built-in diagnostics (Tx & Rx optical power, temp, voltage, etc.) of the Fiber SFP modules Additional Timing System Upgrades: FIDO Replacement / New Fid Modulation Scheme (future…) Linac Sector 0 Timing Upgrade (future…)

LCLS Timing – Future Directions Eventual Goal: Completely replace SLC Timing System in the Linac while retaining all of the legacy functionality and providing new features Develop a timing system that is expandable & adaptable to new machines (e.g. PEP-X) Challenges: Temperature-induced phase drifts Handling PEP Injection Damping Ring Timing

Conclusion / Summary LCLS Timing System System has been implemented / co-existing with and slaved to SLC timing system (for now) First SLAC timing system to use COTS HW Initial Experience has been positive overall (with the usual growing pains) Both SLC & LCLS systems are running in parallel right now Plan to replace SLC timing in LCLS with new HW Other upgrades are being planned

End of Talk