Status of LHCb PC Farm prototype

Slides:



Advertisements
Similar presentations
DAY12 UNIT 15: DRYER OUTLETS AND LIGHTING CIRCUITS FOR THE LAUNDRY, POWDER ROOM, REAR ENTRY HALL AND ATTIC.
Advertisements

Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
NT series introduction UPS training June 2006 Markus Schwab.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
TOPIC-MAKING CONNECTION OF ONE SWITCH AND ONE SOCKET
WebCCTV 1 Contents Introduction Getting Started Connecting the WebCCTV NVR to a local network Connecting the WebCCTV NVR to the Internet Restoring the.
Verigy V93000 Service Training
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
1 07/09/2004Rack Coordination meeting Ph.Gavillet CERN/PH-LBO PC Racks - Status Content qNews, matters arising ãLast Experiment meeting (24/08) – Minutes.
Verigy V93000 Service Training Appendix B Autotransformer E8005A.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
The LHC PC Rack Project Fred Wickens On behalf of the LHC PC-Rack Study Group 10th LECC Workshop Boston Sep 2004.
Infrastructure for the LHCb RTTC Artur Barczyk CERN/PH RTTC meeting,
PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Inspection Team Topic: Electrical Safety 9/15/2015.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
 Each program needs separation.  Better computer security by not installing multiple programs on one system.  Most out-of-the-box software assumes.
Magnet Measurement Plan APS MBA M1 R&D Magnet Joe DiMarco, et al. 26 November 2013.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
RTTC rack status Apr. 14 th 2005 Loïc Brarda, CERN.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
Planning The Electrical System  Safe means for the entrance of electrical supply into a building  Means of disconnecting all electrical power in a building.
AEON 4000 Including the SMPS 4000 rectifier and the AEON Gold Alarm & Monitoring Unit.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
DC Machine & Transformer
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
S A Griffiths CM42 June 2015 Electrical & Control.
ELECTRICAL PLANT DIMENSIONING
User Operation Presentation
IBBelle: Status & Plans
IP-based 8-port Switched Power Manager
MEDIUM VOLTAGE APPLICATIONS.
Engineering Technology Division
ROCKER ARM SPOT WELDING MACHINE
5. Outdoor unit Installation
ProtoDUNE SP – Slow control Status
March 27, 2012 Arc Flash Event © ABB February 7, 2012 Slide 1.
COOLING LHC RACKS PROCUREMENT
Tracker cooling loop “check out” draft for discussion
ATF2 Magnet Power Supplies
LV Safe Powering from UPS to Clients
SC of KM3 Vidyo meeting of Thursday, February 18
Product Training Module
Elec 2607 Digital Switching Circuits
Technician Operation Presentation
The Greening of IT November 1, 2007.
CAN branch PSU – Update meeting
Pierluigi Paolucci & Giovanni Polese
PowerLogic™ offer for the basic metering market
SMPS POWER PLANT SMR 48V/25A SALIENT FEATURES
Hardware integration and interfaces
PM9, PM9P and PM9C Power Meter
Process design 2 – analysis
Fig. 3 Voltage-driven phase switching in a 1T-TaS2 nano-thick crystal.
Presentation transcript:

Status of LHCb PC Farm prototype Content PC rack configuration Powering tests Outlook (short term) 16/06/2004 Ph.Gavillet CERN/PH-LBC

Ph.Gavillet CERN/PH-LBC PC rack configuration 2 * Subfarm / 59U rack Each rack 1 * rackcooler CIAT 1 elec. Dist. box (1phase :63A) 1 * 48-port Control switch Each Subfarm 3 * 9-outlet reglettes (16A) 23 * PCs 1 * 24-port Data switch Currently 39 (23 + 16) PCs 16/06/2004 Ph.Gavillet CERN/PH-LBC

PC rack: current configuration 16/06/2004 Ph.Gavillet CERN/PH-LBC

Ph.Gavillet CERN/PH-LBC Powering tests (12/05) TS-EL (J.Pierlot, F.Courajoud) Test 1: 3-phase supply, 3 departs 3 departs (R,S,T ) supplying 3 reglettes (10A, 19 outlets) One (25A, C-curve) circuit breaker / depart 3 (off/on spaced by ~ 20s) every ~4 mins Powering OK (Full PC-rack booting in ~ 4 mins) Test2: 1-phase supply, 3 departs 3 departs (on 1 phase) as for Test 1 5 (off/on spaced by ~ 20s)) every ~4 mins Powering OK Test3: 1-phase supply, 6 departs 6 departs supplying one reglette each (10A, 9 outlets) One (16A, C-curve) circuit breaker / depart 5*off/on every ~ 20s, 3*off/on spaced by <1s) every ~ min 16/06/2004 Ph.Gavillet CERN/PH-LBC

Ph.Gavillet CERN/PH-LBC Outlook (short term) Complete 2nd Subfarm configuration Last PCs to be delivered on week 25 Installation completed by end of week 26 Powering test on full configuration Repeat On/Off tests Work out reglettes characteristics Circuit breakers (type, Amp) Conclude on single rack powering Repeat detailed LV measurements (K.Kahle et al.) Inrush currents Harmonic distortion Repeat cooling measurements on full configuration Power in / Power out balance Map of temperatures: In / behind PCs / Out Start investigating cooling of switches 16/06/2004 Ph.Gavillet CERN/PH-LBC