ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT

Slides:



Advertisements
Similar presentations
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Advertisements

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Diagnostic & Troubleshooting Date 06/09/00, Page 1 Diagnostic & Troubleshooting s.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Susanne Kersten, Wuppertal University November 21/22, 2013.
STATUS OF DAQ PROJECT OPERA collaboration meeting, Hamburg, 3-5 June, ’04 J.Marteau  T.T. LOW VOLTAGE POWER SUPPLIES  NETWORK, RACKS & CABLING  PT DAQ.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
FOPI – Slow Control Content 1.FOPI experiment - Overview 2.GUIs for FOPI 3.System Design.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Mitglied der Helmholtz-Gemeinschaft PANDA MVD Slow Control Issues Harald Kleines, Forschungszentrum Jülich, ZEA-2.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
SD-HCAL technological prototype: services Nick Lumb Lyon, 3 February 2011.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
CERN Giovanna Lehmann, Xavier Pons
ProtoDUNE SP – Slow control temperature gradient monitor
Installation of the T600 at Fermilab
Status & Plans for WA105 Control System
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
NWU IT-ES/NWU IT-ELD Monitoring systems
LKr status R. Fantechi.
FTK infrastructure in USA15 Status and plans for 2015 A
ProtoDUNE SP – Slow control Status
General aspects: Optical links :
Institute of Nuclear Physics Polish Academy of Sciences
ProtoDUNE SP – Slow control temperature readout setup test
ATLAS MDT HV – LV Detector Control System (DCS)
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
ProtoDUNE Installation Workshop - DAQ
NP04 CPA/FC/HV Interfaces
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Magnet Safety System for NA61/Shine
Particle Detection System for MERIT
TPC Detector Control System
Particle Detection System for MERIT
ICARUS Internal Cryogenic Sensors
Presentation transcript:

ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT Giovanna Lehmann – Xavier Pons CERN – EP/DT

Slow control priorities To define the rack allocation, space needed by equipment and power consumption. “Clients” should send the request of the space needed in 19’ rack in terms of U units. Power supply configuration? Crates number? To define the quantity of SC racks needed. To design the rack electrical power supply distribution

1. Heinzinger 300 kV power supply 1.1 Model, type? (Is the PNC or PNChp-Series?) http://www.heinzinger.com/uploads/files/downloads/PNChp.pdf 1.2 Slow control connection to analogue interface 15-pin sub-d connector for PS signal monitoring and control. Option 10 recommended

1. Heinzinger 300 kV power supply 1.3 There is the option (72&76) of RS-232 communication for parameters monitoring. WA105 tried with not a good results. 1.4 Interlock according LAr levels. Is the HV power supply equipped with interlock circuit? Then the power supply should be ordered with the options 02&52 Otherwise SC should think a circuit to interlock the HV power supply?

More information is needed to integrate this system in the SC. 2. CORONA MONITOR 2.1 Custom built. 2.2 System monitor. 2 monitors signals (?) on each filter to determine breakdown. 2.2 Calibration Signal. 2 pulsed signals ( 1per monitor) (SMA connector ) More information is needed to integrate this system in the SC. Specifications of the signals? …. and process?

3. MPOD Crate 3.1 MPOD Crate configuration needed. Which type of PS slot used in the crate? 3.2 How many crates? Important, for booking rack place, allocation,… 3.3 Important all the MPOD crates should come by default with the option Ethernet interface for connecting them the SC trough Wiener OPC server. In contact with CERN WinCC support for integrating them in the SC. 3.4 APA WIB voltage current monitoring and control by means of the MPOD?

4. PD calibration and cabling 4.1 MPOD crate used? If yes, the crate configuration needed, which type PS modules? 4.2 Voltage for current regulation of the UV LEDS needed? If yes, more details are required of this system

5. Outer Veto 5.1 This detector will be on building ground: - Not included into detector racks foreseen so far - Will need to find emplacement + detail on SC 5.2 CAEN power supply supported by SC. Configuration required, PS module type 5.3 LV Agilent N6700, possible to replace by Wiener and integrate it in a MPOD. Only 6 channels 5.4 ??? * remotely controlled power strip: computers, NIM crates, etc * 2-3 computers for DAQ and event builder * monitor temperature in rack and computers

6. Ground planes 6.1 ‘ The impedance monitor has network capability into slow controls system’. More details of the system or device are required ?

6. Beam Plug 6.1 For the moment we can assume the following: * Two pressure sensors * One temperature monitor * One flow rate monitor * Two remote control valves Control N2 supply line, safety interlock… If possible more details of the used hardware: valves, sensors …

7. Purity Monitors - TPC 7.1 Install 4 purity monitors. 2 channel readout to LabVIEW algorithm in a DAQ PC for purity data. Is it possible to integrate the LabVIEW algorithm into SC directly? 7.2 Control LV/HV through SC. To check if the BERTAN PS can be integrated in the SC. We recommend to use the Wiener PS in order to standardize the equipment

8. Purity Monitors 8.1 Light source automatic ON/OFF for gold photocathode done by SC? 8.2 If LED lamps used, control by SC of the signal sent to LED controller. 8.3 To check if BK-PRECISION PS can be integrated into the SC. We recommend the use of Wiener PS. 8.4 More details are required.

9. Cryogenics 9.1 How to exchange data between cryo and SC? At the low level = hardware signals, high level in the scada ? 9.2 List of signals to be exchanged. List of signals owned by SC? 9.3 Flor’s list. This hardware belongs to SC or to the Cryo? 9.4 More details are required. 9.5 As the Cryo experts are at CERN, we’ll contact them to clarify this point.

10. Level meters & pressure sensors 10.1 Sensors and signal type? Signal amount? 10.2 Level meter interlocks the Heizinger HV power supply 10.3 More details are required

11. Temperature gradient monitor other temperature sensors 11.1 Read-out type of the 25 PT100 sensors? Can PT100 & PT1000 be read directly in the SC?

12. Cameras and lighting 12.1 What and how to integrate into SC? 12.2 More details are required