Framework Schedule from EYETS 2016 to LS2

Slides:



Advertisements
Similar presentations
Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Advertisements

Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Development plan and quality plan for your Project
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
1 1. Some recent views ( ) 2 Linac tunnel
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
TE-CRG Activities D. Delikaris, TE-CRG.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. HL-LHC.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LHC intervention scheduling with the Work Acceptance Tool
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
V4.
YETS & LS2 Works EN-EL / Power distribution
CERN Construction Planning and Scheduling (LHC installation)
East Area Renovation Project Team meeting # 2 – EDMS News
AFC 2017 (and 2018) AFC timeline:
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
BE-ICS Activities during the LS2 Period (15 min)
Brief Status SPS Prototype PSB Prototype Installed in LS1
TE-MSC activities in SPS during LS2
Equipment simplified model SMR UR safety
EYETS David Hay EN-OSS.
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Injector De-cabling Project
Configuration Management and Layout Database ELENA Project
SPS cryogenic proximity equipment and SM18 validation
LS1 Committee January 24th, 2014
YETS & LS2 Reminder G. Girardot 20 juin 2017.
Installations, modifications, consolidation in 2005:
J. Uythoven for the MPE-MI & MS Teams
Accelerator and Experiment Interface Session: LS2, LS3
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Renovation of the 45-year old PS magnets
CRG activities for EYETS 2016
SPS activities during LS2 TE-EPC (Power Converter Group)
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
East Hall under construction
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Experimental Areas – LS2 planning
East Hall under construction
Presentation transcript:

Framework Schedule from EYETS 2016 to LS2 Marzia Bernardini, on behalf of EN-ACE-OSS team LHC Performance Workshop Chamonix, 28th January 2016

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ Contents General information YETS and EYETS - activities related to the regular maintenance - length of the YETS and EYETS for the LHC and its Injectors LS2 - Framework for the LHC - Framework for its Injectors Methodology & Interfaces with EN-ACE LS2 Milestones Conclusions LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ Overview LS2 PERIOD The LS2 PERIOD includes: Extended Year End Technical Stop (EYETS) 2016-2017 Year End Technical Stop (YETS) 2017-2018 Long Shutdown 2 (LS2) LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ General information YETS and EYETS - activities related to the regular maintenance - length of the YETS and EYETS for the LHC and its Injectors LS2 - Framework for the LHC - Framework for its Injectors Methodology & Interfaces with EN-ACE LS2 Milestones Conclusions LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

YETS duration: the frame LHC CV maintenance in the LHC and its Experiments  10 wk Safety tests (mainly during Christmas Break) by GS-ASE and EN-EL Minor regular maintenance on cryogenic equipment and rotating machines LHC Recommissioning  1 wk can be considered as a baseline if no major intervention occurs during the YETS (the revision of the duration is under discussion) Regular maintenance activities on other equipment are performed in the shadow of the activities listed above. In conclusion, the minimum length (beam to beam) of the YETS for the LHC is 13 wk (including the Christmas Break) LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

YETS duration: the frame SPS Hardware tests (mainly magnet tests) before and after the shutdown  2 wk CV maintenance for SPS (not including North Area)  6 wk Activities related to Recommissioning by BE-OP 3 wk can be considered as a baseline (this duration can evolve) The safety tests by BE-ICS and EN-EL Regular maintenance activities on other equipment are performed in the shadow of the activities listed above In conclusion, the minimum length (beam to beam) of the YETS for the SPS is 13 wk* (including the Christmas Break) * The RP cool down period is not included LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

YETS duration: the frame PSB & PS Hardware tests (mainly magnet tests) before and after the shutdown 1wk CV maintenance for PSB, PS, Linac2 and Linac4 (not including Isolde, AD, East Area, CTF3 and n-TOF)  5wks Activities related to Recommissioning by BE-OP 3wks can be considered as a baseline, but this duration can evolve The safety tests by BE-ICS and EN-EL Regular maintenance activities on other equipment are performed in the shadow of the activities listed above In conclusion, the minimum length (beam to beam) of the YETS for the PS and the PSB is 11 wk* (including the Christmas Break) * The RP cool down period is not included LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ EYETS 2016-2017: the frame LHC In addition to the baseline fixed for the YETS, there is a request from CMS to anticipate works of LS2, to prepare the Experiment to cope with the 2e34 cm-2s-1 luminosities. These works imply the full opening of the Endcaps and impact the duration of the YETS, which become an Extended YETS. INJECTORS The Injectors benefit from the Extended YETS of the LHC to maximize the activities related to the decabling project in the PSB and the SPS, and to anticipate activities related to LIU project. https://edms.cern.ch/document/1470895/2.0 LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ EYETS 2016-2017 For the LHC the duration of the EYETS is 19 wks For the SPS, PS and the PSB, the duration is aligned to the LHC. This is due to the requests concerning: the decabling project and its implementation strategy; the anticipation of LIU activities during the EYETS These durations includes the tests and HWC periods LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ YETS 2017-2018 For the LHC & the SPS: YETS kept to 13 wks For the PSB and the PS, the duration is aligned to the LHC and the SPS. This is due to the requests concerning: the decabling project and its implementation strategy; the anticipation of LIU activities during the YETS Duration of YETS 2017-2018 LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ General information YETS and EYETS - activities related to the regular maintenance - length of the YETS and EYETS for the LHC and its Injectors LS2 - Framework for the LHC - Framework for its Injectors Methodology & Interfaces with EN-ACE LS2 Milestones Conclusions LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LS2 Framework for the LHC During the LS2, three main categories of activities will be implemented Maintenance: Cryogenics, Cooling and Ventilation, Vacuum, Electrical Systems, Collimation, Access System, Fire detection, ODH, … Projects: HL-LHC Consolidation & Other activities: this could concern all equipment of the LHC machine LS2 Days: https://indico.cern.ch/e/436424 The Baseline – as for Chamonix 2014 – foresaw a length of LS2 of 18 months, but following the requests of the HL-LHC project and the outcomes of the cost and schedule review, the Length of LS2 has been extended to 24 months. PLAN tool is the database used to “build” the schedules concerning the LS2 period. LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

Inputs* in PLAN tool - LHC * Only activities included, NO contribution HL Cons Maint & Upgrade Maint & Upgrade Cons Maint & Upgrade Cons HL EYETS 2016-2017 YETS 2017-2018 LS2 …not weighted data, but huge numbers related to maintenance & upgrade LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

HL-LHC Installation Overview for the LS2 Courtesy Paula Alvarez Lopez – LS2 Days Activities in: LSSs 2, 4, 6 and 8 Civil Engineering in Points 1 and 5 New transp. refrigerator Prep. works halo diagnostic systems New Q5 In-situ a-C coating High bandwidth pick-ups TCSPM Mask for D2 Fast wire scanners TDIS Cryo-bypass+TCLD TAXN BGV Mask for D1 LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ HL-LHC Civil Engineering @ P1 & P5 Courtesy Lucio Rossi – LS2 Days For HL-LHC, LS2 will be the period of D(TH)RILLING! The impact and the final scope of the civil engineering works is not yet finalized If the connections between the present LHC and the new galleries are realized during LS2, the impact on the other activities in Points 1 and 5 during LS2 needs to be assessed LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LS2@LHC: Proposal of First Draft skeleton 2018 2019 2020 2021 Dec. '18 Jan. '19 Feb. '19 March '19 April '19 May '19 June '19 July '19 Aug. '19 Sept. '19 Oct. '19 Nov. '19 Dec. '19 Jan. '20 Feb. '20 March '20 April '20 May '20 June '20 July '20 Aug. '20 Sept. '20 Oct. '20 Nov. '20 Dec. '20 Jan. '21 Feb. '21 March '21 TESTS and WARM UP CRYO Maintenance ELECTRICAL Maintenance & Consolidation Magnets replacement Other activities… HL activities @ P2, P4, P6 and P8 Lift replacement Cool Down @ P7 HL activities @ LSS7 COOL DOWN, TESTS and HWC Depending on the cool down and warm up sequence, the available window for the activities is between 18 to 22 months

Inputs* in PLAN tool - Injectors * Only activities included, NO contribution LIU Cons Maint & Upgrade Maint & Upgrade Cons LIU Maint Upgrade EYETS 2016-2017 YETS 2017-2018 LS2 LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LS2 Framework for Injectors Defined by LIU project 11.5 months 18 months Start of the LS2 for the Injectors: Surface activities for the Linac2, the Linac4 and the PSB machines will start in November 2018 on surface, during tunnel RP cooling. All other surface activities for the PS and the SPS will start at the end of the ion run, in December 2018. Courtesy Julie Coupard LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ General information YETS and EYETS - activities related to the regular maintenance - length of the YETS and EYETS for the LHC and its Injectors LS2 - Framework for the LHC - Framework for its Injectors Methodology & Interfaces with EN-ACE LS2 Milestones Conclusions LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

Methodology and Interfaces with EN-ACE Management of the configuration relative to the machines (Space reservation, Engineering Change Request, Functional Specification, Engineering Specification, Installation Procedure, Tests Procedure etc…) Update of the layout databases Configuration Layout EN-ACE-CL Integration Studies EN-ACE-INT Coordination Scheduling EN-ACE-OSS EN-ACE-COS Documentation Central information of the 3D models between all design office (services, mechanical etc…) Identification of the interferences Non-conformities of installation Central information of the activities to schedule taking into account the logistic and operational safety aspects Follow-up of the documentation (Space reservation, Engineering Change Request, Functional Specification, Engineering Specification, Installation Procedure, Tests Procedure etc…) Follow-up of the Non-conformities of installation LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

Methodology and Interfaces with EN-ACE Configuration Layout EN-ACE-CL Integration Studies EN-ACE-INT Coordination Scheduling EN-ACE-OSS EN-ACE-COS Documentation COORDINATION & SCHEDULING Inside EN-ACE-OSS three working units the LHC its Injectors (SPS, PS ring&TT2, PS Booster, Linac4) the Projects (EHN1, SM18, De-cabling, …) Coordination meetings are held by the different Facility Coordinators to plan the activities during the YETS, the EYETS and the LS2 Groups announce their activities (approved in PLAN tool) - technical, safety aspects and interfaces are discussed Facility Coordinators gradually refine the schedule and the organization VIC and Risk assessment: under the responsibility of the Works and Services Supervisor GENERAL SAFETY INSTRUCTION GSI-WS-1 SAFETY COORDINATION FOR WORKS AND SERVICES Implemented as from the 1st of June 2016 “Work and Services Supervisor: person under the responsibility of the Project Leader or the organic unit responsible for the contract who monitors a specific activity in an operation on behalf of CERN.” LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

Methodology and Interfaces with EN-ACE From Space Reservation (Project Phase) to ECR (Installation Phase) Space reservation Existing situation and introduction Reason for change Detailed description Impact on other items References ECR Existing situation and introduction Reason for the change Detailed description Impact on other items Impact on items/systems Impact on utilities and services Impact on cost, schedule and performance Impact on operational safety Elément(s) important(s) de sécurité Other operational safety aspects Worksite safety Organization Regulatory tests Particular risks References Configuration Layout EN-ACE-CL Integration Studies EN-ACE-INT Coordination Scheduling EN-ACE-OSS EN-ACE-COS Documentation LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

Global picture PLAN Courtesy K. Foraz – LS2 days HL-LHC LIU Upgrade Consol. R2E PLAN LIU Maintenance Config. managt Schedule & Coordination Worksite Coordination Integration Safety LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ General information YETS and EYETS - activities related to the regular maintenance - length of the YETS and EYETS for the LHC and its Injectors LS2 - Framework for the LHC - Framework for its Injectors Methodology & Interfaces with EN-ACE LS2 Milestones Conclusions LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LS2 Project: Main Dates and Milestones Yearly “LS2 day” as of 2015 Activities declared in Plan by end’15 both for injectors and LHC; March’16, definition of activities for EYETS 2016; Mid’16, definition of activities for YETS 2017 and LS2; Preliminary “final” validation: mid 2017. LS2 readiness review – mid 2018 LS2 Day LS2 Day LS2 Readiness Review LS1 Post Mortem LS2 Day PLAN is made available Consolidated List of tasks to Director A&T 1st step final validation Final validation Courtesy J. Ph. Tock LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/

LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/ Conclusions The YETS and EYETS are mainly dedicated to the annual maintenance in the LHC and its Injectors. Nevertheless major projects as the de-cabling project, LIU and HL-LHC will benefit from these periods of time to anticipate activities related to LS2 The LS2 duration has been re-adjusted to allow the completion of major activities related to LIU and HL-LHC: From 18 months to 24 (+4) months for LHC & its Injector chain The LS2 in the Injectors is mainly dedicated to the implementation of the LIU project The LS2 in the LHC is mainly dedicated to major maintenance, HL-LHC and civil engineering activities in preparation of LS3 …nevertheless a huge number of activities related to consolidation, maintenance and upgrade appears: resource allocation between all the activities should be assessed A consolidated list of tasks must be prepared to draft the first preliminary schedules LHC Performance workshop 2016 - https://indico.cern.ch/event/448109/