School Closure/Consolidation Composition of School Closure Committee (SCC) Closure/Consolidation Criteria Timelines.
Advertisements

February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
Agenda SCHEDULE UPDATE EDUCATIONAL PLANNING UPDATE COMMUNITY ENGAGEMENT OPTION STANDARDS BUILDING & SITE BUDGET PROCESS HIGH SCHOOL PROJECT PLANNING MEETING.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
SCHEMATIC DESIGN PRESENTATION
Indiana’s Education Roundtable 9/28/05 Indiana’s Education Roundtable ‘District Efforts to Move Resources to Learning’ Presented by Thomas W. Thornton,
Central management of training Program development Local implementation of programs Government orientations, policies and structures Components of the.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
SPACE ADMINISTRATION IN HIGHER EDUCATION INSTITUTIONS – BARRIERS AND OPPORTUNITIES Jean Skene Director: HEMIS Department of Higher Education and Training.
Margaret Heritage, CRESST Raymond Yeagley, NWEA. National Forum on Education Statistics  Mission: improve the quality, usefulness, timeliness, and comparability.
C APITAL I MPROVEMENT PROGRAM FY 2015/16 – FY 2020/21 August 14, 2014.
Space Utilization Project Chandler Unified School District 2010.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Multi-Purpose.
Discussion and Possible action on the historic designation by the City of Laredo Landmark Board on certain LISD Schools.
College Station ISD Planning for Growth December 12, 2006.
BUILDING PROJECT AND THE FEASIBILITY STUDY August 20, 2012 Wachusett Regional High School MOUNTVIEW MIDDLE SCHOOL.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
1 Predevelopment Suzanne Keech Corporate Managing Director, Studley, Inc. June 2010.
Missoula County Public Schools Overview of Planning January 2014.
Walton County School District 5-Year Facilities Work Plan
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
Schematic design presentation School of Business South Hall Renovation.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
August 18, 2011 Facility Master Plan Master Plan Presentation “Listen” “Listen”“Understand”“Create”
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Program Review A systematic method of analyzing components of an instructional program, including instructional practices, aligned and enacted curriculum,
Columbus Signature Academy New Tech Campus – Phase 1 Columbus, Indiana Lee J. Brockway Award Renovations High School CSO Architects 2009 Exhibition of.
About District Accreditation Mrs. Sanchez & Mrs. Bethell Rickards Middle School
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Standard III Resources Effective Practices in Accreditation ASCCC Accreditation Institute, Feb , San Diego, CA Cheryl Aschenbach, ASCCC At-large.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Presentation to the Finance and Administration Advisory Group ▸Implementing a New Space Request Process ▸Process for requesting additional space.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education August 4, 2014 Stakeholder Engagement and Communications Services.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
Scott Raines, Director of School Planning and Construction “Investing in West Virginia’s Future”
DRAFT April 14, 2016 BOARD PRESENTATION > ORGANIZE, SHARE, + LEARN COMMUNITY COLLEGE DISTRICT 2016 EDUCATIONAL AND FACILITIES MASTER PLANS SAN BERNARDINO.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Bridging Business & Buildings:
Fort Stanwix National Monument Energy Audit Contract
CLINTON COMMUNITY SCHOOL DISTRICT
Overview of MSBA Building Process and Project Timeline
Board Work Session April 10, 2017.
Overview of MSBA Building Process and Project Timeline
Fun Facts: James M. Bennett High School
Board Meeting September 25, 2017.
2006 Facilities Master Plan Update Cañada College
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
Department of Political Science & Sociology North South University
DRAFT Standards for the Accreditation of e-Learning Programs
Board Meeting August 21, 2017.
Assessment Cycle and Academic Effect
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
UNION GROVE ELEMENTARY REFERENDUM
Kincaid Hall Renovation
Best Practices Creating Effectively Designed Learning Spaces
Standard III Resources
Safety and Security- From Assessment to Implementation
Facilities Modernization Program
Westfield State University
LESSONS LEARNED NYP Design and Construction NYP BEST PRACTICES.
New Secondary School Construction Update
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Continuing challenges regarding previous “findings” :
Dixon Middle School Project Update
Presentation transcript:

February 13, 2017

The VISION of the Vigo County School Corporation is to ensure that our three comprehensive high schools meet the needs of students and staff of today and into the future

VISION With this vision guiding all study efforts, participants embarked on a journey of investigation, analysis and discovery to make this vision a reality. Study Definition Data Gathering Analysis Condition Assessment Update Recommendations

Team: Purpose: STUDY DEFINITION Board, Administration, Staff, and Design, Legal, Financial and Construction Consultants Purpose: Review the context in which this study has been commissioned, and establish the scope and schedule for the Feasibility Study

Team: Purpose: DATA GATHERING Board, Administration, and Fanning Howey Align Feasibility Study outcomes with: Curricular program delivery Enrollment trends Other criteria relevant to Vigo CSC Collect existing high school facility documentation

Team: Purpose: ANALYSIS Administration and Fanning Howey Analyze class scheduling on a per classroom basis Demonstrate current Facility Utilization as a function of programming vs. available spaces

BUILDING UTILIZATION

BUILDING UTILIZATION

BUILDING UTILIZATION

BUILDING UTILIZATION

BUILDING UTILIZATION

Team: Purpose: ANALYSIS Administration and Fanning Howey Calculate building capacity as a function of available space compared to the number of classes taught in a five period day

Building Capacity: ANALYSIS TERRE HAUTE SOUTH HIGH SCHOOL  83 teaching stations x 25 students/class x 80% utilization = 1,660 student capacity TERRE HAUTE NORTH HIGH SCHOOL  83 teaching stations x 25 students/class x 80% utilization = 1,660 student capacity  WEST VIGO HIGH SCHOOL  45 teaching stations x 25 students/class x 80% utilization = 900 student capacity

Team: Purpose: ANALYSIS Administration and Fanning Howey Compare building capacities with area per student benchmarks for high schools in Indiana STUDENT CAPACITY SF/STUDENT 1,000 260 1,600 240 2,000 220

Team: Purpose: ANALYSIS Administration and Fanning Howey Compare building capacities with area per student benchmarks for high schools in Indiana TERRE HAUTE SOUTH HIGH SCHOOL 209 SF/Student current vs. 240 SF/Student TERRE HAUTE NORTH HIGH SCHOOL 205 SF/Student current vs. 240 SF/Student WEST VIGO HIGH SCHOOL 314 SF/Student current vs. +260 SF/Student

Team: Purpose: ANALYSIS Administration and Fanning Howey Evaluate classroom and lab sizes against benchmarking norms Classrooms 900 SF Science Classroom/ Lab Combinations 1,400 SF

CLASSROOM SIZE ANALYSIS

CLASSROOM SIZE ANALYSIS

CLASSROOM SIZE ANALYSIS

CONDITION ASSESSMENT UPDATE Team: Board, Administration, Staff, and Fanning Howey architects and engineers Purpose: Tour each high school campus Review curricular/co-curricular/extra-curricular programs Discuss how the facilities support or deter programming

CONDITION ASSESSMENT UPDATE Filters: Site/Circulation Safety and Security Building Shell/Systems Interior Building Spaces Educational Adequacy

CONDITION ASSESSMENT UPDATE Renovation Replace mechanical and electrical systems, improve technology, and provide new finishes. Major Renovation Replace mechanical, plumbing, electrical, and technology systems. Modify room sizes, and provide new finishes and fixed equipment. Demolition/Reconstruction Demolish all improvements, retain floor slab/building shell, and reconstruct to meet program requirements.

SITE CONDITION ANALYSIS

BUILDING CONDITION ASSESSMENT

BUILDING CONDITION ASSESSMENT

SITE CONDITION ANALYSIS

BUILDING CONDITION ASSESSMENT PLANS GOES HERE

BUILDING CONDITION ASSESSMENT

SITE CONDITION ANALYSIS

BUILDING CONDITION ASSESSMENT

Diligent maintenance has enabled ongoing occupancy FINDINGS Diligent maintenance has enabled ongoing occupancy Facilities are failing to provide a 21st century educational environment Areas which must be addressed include: Safety and security Environmental comfort Flexible learning spaces Access to technology Lower energy costs

Most high-performing Indiana high schools undergo: RECOMMENDATIONS Most high-performing Indiana high schools undergo: Major remodeling at 15-year intervals Major renovations at 25 to 30-year intervals

RECOMMENDATIONS The Feasibility Study findings indicate that a significant facility improvement initiative for these three high schools and West Vigo Middle School is warranted

ADDITIONS/RENOVATIONS CONCEPT

RECONSTRUCTION CONCEPT

ADDITIONS/RENOVATIONS CONCEPT

RECONSTRUCTION CONCEPT

ADDITIONS/RENOVATIONS CONCEPT

RECONSTRUCTION CONCEPT

February 13, 2017