CLARREO Mission Status

Slides:



Advertisements
Similar presentations
Brian Killough NASA NASA Future Missions Summary CGMS-38 Meeting Delhi, India November 8-12, 2010.
Advertisements

Space-based Architecture for Climate Mary Kicza NOAA’s Assistant Administrator for Satellite and Information Services May 19, 2011.
Traceability Traceability Statement for AIRS/IASI Outstanding Issues with Traceability Concept How we can strive to resolve these Strategy for CLARREO/TRUTHS.
2 - 1 WCRP Denver 2011 Measurement of Decadal Scale Climate Change from Space Marty Mlynczak, Bruce Wielicki, and David Young NASA Langley Research Center.
Spectral variability in the Earth’s Outgoing Longwave Radiation Richard Bantges, Helen Brindley, Jacqui Russell, Jon Murray, Claudio Belotti, Christopher.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
CLARREO SDT Meeting Alternative Missions & The Path Forward David Young April 10-12,
CLARREO Mission Studies Overview David F. Young First CLARREO Mission Study Team Meeting Newport News, VA April 30 - May 2.
Welcome to the MODIS Land Collection 5 / Long Term Data Record Workshop Chris Justice MODIS Land Discipline Lead.
NASA Earth Science Technology Update Presented to Doppler Wind Lidar Working Group April 28, 2015 George J. Komar Associate Director/Program Manager Earth.
2 - 1 Mission Concept Review 17Nov10 Bruce Wielicki, David Young, Marty Mlynczak, Rosemary Baize NASA Langley Roger Cooke Resources for the Future April.
1 Economic Value of Climate Science Bruce Wielicki, NASA Langley Roger Cooke Resources for the Future David Young, NASA Langley Martin Mlynczak, NASA Langley.
Integrated Mission Review 28Jan108Jan10: N - 1 Use or disclosure of the data contained on this sheet is subject to the restrictions on the IMR cover page.
1 R. D. Gehrz 67th International Symposium on Molecular Spectroscopy, Columbus, OH, June 21, 2012 The Stratospheric Observatory for Infrared Astronomy.
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
Climate Absolute Radiance and Refractivity Observatory (CLARREO) The Story so Far… David F. Young NASA Langley Research Center CLARREO Mission Study Lead.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda 11 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th –
1 Climate Absolute Radiance and Refractivity Observatory (CLARREO) Project Status Steve Sandford – Mission Formulation Manager July 6, 2010.
1 Climate Absolute Radiance and Refractivity Observatory (CLARREO) Welcome David Young Project Scientist CLARREO Mission Formulation Team NASA Langley.
1 Science Definition Team Meeting National Aerospace Institute Hampton, VA Dec 1-3, 2015.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California CLARREO GPS RO/AJM-JPL.
Orbital Analysis for Inter-Calibration Dave Mac Donnell Brooke Anderson Bruce Wielicki Don Garber NASA Langley Research Center Solar Workshop January 30,
- 1 CLARREO Science Meeting CLARREO Science Meeting July 6, 2010 July 6, 2010 Bruce Wielicki.
Report from NASA 17th GSICS Executive Panel, Biot, 2-3 June 2016 James J. Butler NASA Goddard Space Flight Center Code 618 Biospheric Sciences Laboratory.
1 ARCSTONE Mission ConceptGSICS Meeting, March, 2015 NASA Langley Research Center ARCSTONE Mission: Accurate Lunar Spectral Irradiance Calibration Concept.
Mission/Measurement Overview  Mission Overview / Purpose  Provide a new level of accuracy to greatly improve a wide range of climate change observations.
1 CLARREO Advances in Reflected Solar Spectra Calibration Accuracy K. Thome 1, N. Fox 2, G. Kopp 3, J. McCorkel 1, P. Pilewskie 3 1 NASA/Goddard Space.
Economic Value of a New Climate Observing System Bruce A. Wielicki NASA Langley Research Center, Hampton, Va Roger Cooke Resources for the Future, Washington,
NOAA, version 2, May 2014 Coordination Group for Meteorological Satellites - CGMS CGMS Socioeconomic Benefits Tiger Team CGMS 42 Plenary.
Incoming Themes for 2017 Frank Kelly, USGS
CLARREO Pathfinder - Overview
Paper under review for JGR-Atmospheres …
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
I&T&C Organization Chart
NESDIS-JMA AHI Collaboration
SESSION 4: GFOI Space Data Strategy
2017 Annual Meeting Preparation and Proposal of CLARREO-like Workshop by GSICS/IVOS Scott NSMC/CMA March 20-24, 2017.
GLAST Large Area Telescope:
Accuracy Requirements for Climate Change
Pasadena Convention Center
GSICS Quarterly Special Issues and Editors
GEOSS Data Sharing Principles
GEO-CAPE to TEMPO GEO-CAPE mission defined in 2007 Earth Science Decadal Survey Provide high temporal & spatial resolution observations from geostationary.
Measurements of the Moon by CLARREO Pathfinder and ARCSTONE
Update on Advancing Development of the ROLO Lunar Calibration System
Future Developments of the Lunar Calibration System
NPOESS Airborne Sounder Testbed (NAST)
Title Goes Here Name(s), Organization, CEOS Affiliation
CLARREO Pathfinder Inter-calibration: Requirements and Objectives
Systems Engineering Management
Precipitation Virtual Constellation (P-VC)
Stan Whitcomb LSC meeting Livingston 21 March 2005
Proposed 2019 CEOS chair initiative
Proposal of SI-traceable IR and VIS Hyperspetral reference Workshop by GSICS/IVOS Scott NSMC/CMA.
Recent activities of OCR-VC
GFOI Update & CEOS Next Steps
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.1 Coping with climate change European Commission Research.
Special Issue of the IEEE TGRS on “Inter-Calibration of Satellite Instruments”: 17 January 2019 GSICS Research Working Group Web Meeting Planning.
WGCapD Perspectives of Work Plan –
Current Status of ROLO and Future Development
X-DIS/XBRL Phase 2 Kick-Off
Composition of eXTP mission
Committee on Earth Observation Satellites
CLARREO Pathfinder Inter-calibration: Requirements and Objectives
Atmospheric Composition Virtual Constellation (AC-VC)
NASA Budget & the Political Process
Lunar Calibration Workshop Status of the preparation
Precipitation-Virtual Constellation
Presentation transcript:

CLARREO Mission Status Bruce Wielicki, Rosemary Baize and Dave Doelling GSICS Meeting Darmstadt, Germany March 24, 2014

CLARREO Mission Status Passed Mission Concept Review Nov 2010 Science Definition Team selected in Jan 2011 NASA Earth Science budget reduction in Feb 2011 has caused a delay. Remains in pre-phase A studies, current launch date no earlier than 2022 in NASA’s current mission plans 2 RS and 2 IR instrument calibration demonstration systems underway (CU-LASP/GSFC for RS, UW/LaRC for IR) Climate Model OSSEs and Intercalibration simulation studies Alternative less costly mission studies: ISS best option to date International collaboration options with UK, Italy in study No climate observing system: factor of 3 to 4 underfunded: this remains a large challenge for the climate science community

2013 Progress: Journals 26 journal papers published/in press in 2013 15 papers submitted/in review 42 papers in preparation 13 journal papers were published in 2012 This SDT meeting will give us a fresh view of science study progress and directions

CLARREO Mission BAMS Cover Paper

Intercalibration to CLARREO for Climate Change Accuracy LANDSAT Intercalibration of 30 to 40 instruments in LEO and GEO orbits

Economic Value of Climate Observations Journal of Environment, Systems, and Decisions Cooke et al., 2013 Available free and open access online @ http://link.springer.com /article/10.1007%2Fs10669-013-9451-8

Results and Sensitivity to Assumptions World Wide Economic Benefits Parameter Change CLARREO/Improved Climate Observations VOI (Trillion US 2015 dollars, NPV) 3% discount rate Baseline* $11.7 T BAU => AER $9.8 T 0.3C/decade trigger $14.4 T 2030 launch $9.1 T * Baseline uses 0.2C/decade trigger, 95% confidence in trend, BAU => DICE optimal emissions, 2020 launch Delaying launch by 10 years reduces benefit by $2.6 T Each year of delay we lose $260B of world benefits

2013 Progress: Instruments UW Instrument Incubator Program (IIP) demonstrated space environmental testing to reach TRL-6 on their CLARREO prototype infrared (IR) interferometer LaRC IR Calibration Demonstration System (CDS) held successful NIST peer review: now within a factor of 2 of CLARREO requirements with next step to implement small nonlinearity corrections CU LASP IIP successful high altitude balloon flight (30km) of their CLARREO prototype reflected solar (RS) spectrometer with solar and lunar views GSFC RS CDS held successful NIST peer review, and participated in Landsat ground calibration campaign. On schedule for their successive accuracy steps to CLARREO levels.

ISS Mission Concept Selected the Japanese Experiment Module Exposed Facility (JEM-EF) for this study L/V, installation and JEM-EF interfaces defined and provided by ISS Other ISS locations viable, but ram-side of JEM-EF is optimal for maximizing viewing opportunities Dual-instrument payload approach demonstrated by NRL’s HREP *FRGF (Grapple Fixture) RS Deployment Mechanism 0.85 m Payload Carrier RS Gimbal *PIU RS Spectrometer 1 m 1.85 m IR Spectrometer *HCAM-P (Launch mounts) * = ISS-provided GFE CLARREO ISS Mission Concept

2014 Directions Extend the science understanding of CLARREO requirements beyond the BAMs paper to include a much wider range of climate variables, including cloud properties, temperature and water vapor profiles, water vapor greenhouse gas effect. Support the next Decadal Survey Educate the world on why CLARREO is a critical part of any climate observing system Continue to reduce mission costs and risks

2014 Key Tasks Key journal papers we still need to publish Refining CLARREO requirements as a function of wavelength using new science studies in combination with IIP and CDS instrument calibration studies Instrument Design sessions to look at smaller, lighter, less expensive instrument designs Summary Report for CLARREO web site and for background support of decadal survey white paper. Redesign of CLARREO web site for improved effectiveness Decadal Survey schedule and White Paper

Decadal Survey Schedule NASA/NRC negotiating terms of study now missions as in the last decadal survey? likely NRC preference science topics and priorities? likely NASA preference white paper content may or may not be set in study terms Expected selection of study members in spring 2014 Early meetings of committee in summer 2014 Expected call for White Papers: Jan 2015 Expected due date for White Papers: June 2015 Final report due out in 2017

Key Related 2014 Activities NRC study of satellite continuity requirements and metrics. This study is underway and planned for completion in 2014, in time for use by the next decadal survey. CLARREO concepts expected to provide key background information for this study, as climate observations are a critical focus. This issue again relates to the lack of an international climate observing system. WCRP Grand Challenge Climate Sensitivity workshop at Schloss Ringberg Germany, March 23-28, 2014. One of the aspects is to better understand the ways to test climate model sensitivity with observations and to understand past and future observation needs. CLARREO concepts as presented in the BAMS and VOI papers are also directly relevant to this study.

Conclusion GCICS remains a key focus of the CLARREO mission The intercalibration software tools development presented at the last GSICS meeting (Costy Lukashin & Chris Currey) continue in development with deployment at NOAA NCDC planned.