Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int Summary Report of 6th FG NGN Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int.

Slides:



Advertisements
Similar presentations
INTERNATIONAL TELECOMMUNICATION UNION Document 27 – E TELECOMMUNICATION STANDARDIZATION SECTOR TSB Directors Consultation Meeting on IPTV standardization.
Advertisements

The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
ITU-T Study Group 13 Communications to IETF CCAMP Working Group Marco Carugi ITU-T SG13 Liaison Officer to IETF CCAMP
DOCUMENT #:GSC15-PLEN-11 FOR:Presentation SOURCE:TTA AGENDA ITEM:Plenary 4.8 TTA activities since GSC14 Keun Hyeob LEE, TTA President.
30-31 March 2005 Workshop "IMS over Fixed Access" - Washington 1 TISPAN_NGN Project plan Martin Niekus Alain Sultan
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
The 6th CJK NGN Working Group Meeting April 10 ~ 12, 2006, Hangzhou, China CJK NGN WG (IP-TV Ad-Hoc Group) Chae Sub Lee
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
The 6th CJK IT Standards Meeting April 10 ~ 12, 2006, Hangzhou, China CJK IT Standards Meeting (Collaboration of Security Activity between CJK On NGN and.
The 16th CJK NGN-WG Meeting July 22 ~ 24, 2009, Beijing, China 16 th CJK NGN-WG (Standardization on DSN and Future Direction ) Shin-Gak Kang
Review of Q.8/13 work TTC February Q.8/13 work completed in January Y.2232 (formerly Y.wsconv) was approved by incorporating all.
1 CJK NGN15, Beijing, China Beyond Requirements Document number Beijing, China July 2009 Chaesub Lee
Working Structure and methods for CJK N-iDs Working Group Chae Sub TTA, Korea.
NGN Management Related to FCAPS Interfaces: 27 July 2004 Dave Sidor Chairman, ITU-T SG 4 Nortel Networks/USA Tel Fax
Report of CJK editing team activities for NGN-draft Recommendations
Cognitive Network Standardization Activities April, 2008
14th CJK NGN-WG (Status of New SG 13) Chae Sub Lee
IPv6-based Multihoming Standardization Activities April, 2008
Review of new Question descriptions under ITU-T SG11
CJK NGN test-bed study Phase Ⅲ&Ⅳ
Unified Mobility Management Network Research Division
Future Network Proposal for Future Network Standardization in ITU-T SG13 14th CJK NGN WG December HyoungJun KIM, ETRI
Progress of Network Architecture Work in FG IMT-2020
ETSI–3GPP NGN ACTIVITIES
ETSI–3GPP NGN ACTIVITIES
Proposal for study scope of CJK IPTV-adhoc group
Status report on CJK NGN Working Group
IPv6 based NGN and after (Use of NGNv6) March 31 – April 2, 2008
8th CJK Plenary NGN Workshop for further collaboration March, 2008
CJK NGN test-bed study Phase III&IV
20th CJK UNIOT-WG (Standardization of Mobile IPTV in ITU-T)
Bruno Chatras, ETSI TC TISPAN Vice-Chairman
Future Networks: Design Goals and Promising Technologies
ITU-T Study Group 16: MM Services, Systems and Terminals
NGN interoperability 20th CJK UNIOT-WG TTC
CJK 10th NGN-WG (Status of NGN/NID-WG Discussion) Chae Sub, Lee
Status report on CJK NGN Working Group
CJK 10th NGN-WG (Preparation for the next SG13) Chae Sub, Lee
Dec , 2008 Hyeong-Ho Lee, ETRI Jinkyung Hwang, KT
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
SG-13 / SSG Information Sharing Session Geneva - 05 November 2002
IPTV Standardization and Services in Japan
CJK NGN WG (Proposal for drafting group on IPTV Standards)
ITU-T Next Generation Networks
Summary of ITU Workshop on “Developments regarding telecommunication network architectures and services” Kampala 2 April 2012.
NGN interoperability - TTC activities in ITU-T -
Taesang Choi CJK Testbed Collaboration for NGN Taesang Choi
Global Standards of IPTV and its infrastructural framework
Chae-Sub, LEE Chairman of FG NGN
IP and NGN Projects in ITU-T Jean-Yves Cochennec France Telecom SG13 Vice Chair Workshop on Satellites in IP and Multimedia - Geneva, 9-11 December 2002.
GSC: Standardization Advancing Global Communications
Liu Duo CJK4_014 NGN activities in CCSA Liu Duo
Good Morning 1/17/2019.
NGN 2004 Project status on July 25
Charles KIM TTA Collaboration Plan for CJK NGN Charles KIM TTA
Roles and Functions of CJK NGN WG for NGN Standardization Chae-Sub LEE
ITU-T Focus Group Next Generation Network
The CJK IT Standards Meeting July 5~7, 2004, Seoul, Korea
Session 4: MULTIMEDIA issues
ETSI–3GPP NGN ACTIVITIES
ITU-T Study Group 16 Multimedia services, systems
Nobuo Fujii (GTSC Chair) Rapporteur: Nicole Butler
Architecture and Interworking
IPTV & Content Delivery in ETSI
Hans, KIM TTA Release approach and CJK requirements Hans, KIM TTA
Consideration about Architecture related NGN Standards Chae-Sub, LEE
Chae-Sub LEE TTA Future Collaboration of CJK NGN-WG Chae-Sub LEE TTA
Hans, KIM TTA Future of NGN Standards - FG NGN and SGs - Hans, KIM TTA
COMMITTEE 4 ITU-T Structure: Points of agreement and
Presentation transcript:

Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int Summary Report of 6th FG NGN Chae-Sub LEE TTA Chae-sub.lee@ties.itu.int

Table of Contents Deliverables from FGNGN Release Plan from FG NGN Contribution Status from CJK

Deliverables from FG NGN (1) Release Independent Deliverables WG Deliverable Title Current Draft Target Date Cat. Stat Target SG* 1 NGN release-independent requirements (none) 4Q05 0/1/1 P 13 NGN general services and capabilities (release independent) D 2 Customer Manageable IP Network FGNGN-OD-00149 2Q05 0/2/1 S 3 General aspects of QoS and network performance in NGN (TR-NGN.QoS) FGNGN-OD-00129 3Q05 13/12 Network performance of non-homogeneous networks in NGN (TR-NGN.NHNperf.). FGNGN-OD-00130

Deliverables from FG NGN (2) Release 1 Deliverables WG Deliverable Title Current Draft Target Date Cat. Stat Target SG* 1 NGN Release 1 Scope FGNGN-OD-00141 2Q05 1/1/1 S 13 NGN Release 1 requirements FGNGN-OD-00142 3Q05 D 2 Requirements & Architecture for NGN (FRA) FGNGN-OD-00146 1/2/1 Functional Requirements for NGN Mobility (FRMOB) FGNGN-OD-00147 13 /19 IMS for Next Generation Networks (IFN) FGNGN-OD-00148 3 A QoS control architecture for Ethernet-based IP access networks (TR-123.qos) Approved Mar. 05 A Multi Service Provider NNI for IP QoS (TR-msnniqos) FGNGN-OD-00107

Deliverables from FG NGN (2) Release 1 Deliverables WG Deliverable Title Current Draft Target Date Cat. Stat Target SG* 3 Requirements and framework for end-to-end QoS in NGN (TR-e2eqos.1) FGNGN-OD-00127 4Q05 1/2/1 D 13 A QoS architecture for Ethernet networks (TR-enet) FGNGN-OD-00131 1/2/2 Resource and admission control functions(TR-racf) FGNGN-OD-00128 3Q05 A QoS Framework for IP-based access networks (TR-ipaqos) FGNGN-OD-00113 Performance measurement and management for NGN (TR-pmm) FGNGN-OD-00126 12 Algorithms for Achieving End to End Performance Objectives (TR-apo) FGNGN-OD-00135 4 Signalling requirements for IP QoS TRQ.IP QoS.SIG.CS1 Q Series Supplement 51 Dec. 2004 A 11 5 Security Requirements for R1 FGNGN-OD-00132 1Q05 S 17 6 Evolution of Networks to NGN FGNGN-OD-00138 PSTN/ISDN evolution to NGN FGNGN-OD-00139 PSTN/ISDN emulation and simulation FGNGN-OD-00140

Deliverables from FG NGN (3) Beyond Release 1 Deliverables WG Deliverable Title Current Draft Target Date Cat. Stat Target SG* 2 Functional Requirement for Soft Router FGNGN-OD-00145 TBD 2/2/1 D 13 Digital Multimedia Broadcast FGNGN-OD-00144 P Converged Services Framework FGNGN-OD-00150 5 Guidelines for NGN Security FGNGN-OD-00133 2Q 05 17 7 Problem Statement FGNGN-OD-00158 Apr. 2005 2/1/1 A Requirements FGNGN-OD-00153 3Q05 S High Level Architecture FGNGN-OD-00154 4Q05 Candidate Technologies

Releases Plan from FG NGN Services Release plan between FGNGN and SG13 Network Capabilities Architecture Scope of FGNGN QoS and Control Security Scope of SG13 as NGN Lead Group Migration Transport FGNGN R1 Management ITU-T R1 Scope of Other SGs Protocol FGNGN R2 Terminals ITU-T R2 Provisioning (NNAR, Charging etc.)

Releases Plan from FG NGN FGNGN Release 1 Coverage

Releases Plan from FG NGN FGNGN Release 1 Scope and Services Service Types PSTN/ISDN Emulation services PSTN/ISDN Simulation services Multimedia services Internet access Other services (data services etc.) Public service aspects (LI, ETS/TDR, etc.) Service Capabilities Basic network capabilities Service support capabilities Open Service Environment Service Enablers PSTN/ISDN Emulation support Public service support capabilities

Releases Plan from FG NGN FGNGN Release Processing Plan Specification Stage Complete 3 Specification Stage Incomplete Release 1 Phase 3 depth width time 2 2 1 I Release 2 Phase Rec. I.130 I II II III 1 Specification Stage Complete 3 4 5 III NGN Functional Capability Set Specification Stage Incomplete (IMS) 1 2 NGN Functional Capability Set

Contribution Status from CJK Analysis of Participants on FGNGN CJK Others Total 1st 33 75 108 2nd 19 47 66 3rd 54 67 121 4th 60 63 123 5th 117 62 199 6th 78 144 283 334 617

Contribution Status from CJK Analysis of Input Documents CJK North America Europe Others 1st 2 12 23 2nd 8 22 3 33 3rd 60 48 11 4th 46 47 21 5th 73 29 24 6th 63 25 Total 179 177 38 124