„Banat sun 4 all-Pilot project for promotion and implementation of solar energy for sanitary water heating“ 1.

Slides:



Advertisements
Similar presentations
Use of renewable energy in the Provinces of Treviso headquarters Maurizio Tufaro Treviso Paving the way for self – sufficient regional Energy supply based.
Advertisements

Financial tools to support mitigation projects and programes in the Slovak Republic Helena Princová, Mario Gnida Climate Change Policy Department Climate.
DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO
DISTRICT HEATING: AN OVERVIEW PRESENTED BY: NIELSEN SYSTEMS APRIL 8, 2011.
Energy efficient technology and equipment implementation in plumbing and heating installations УКРІНТЕРМ 2011.
Renewable Energy in Islamic Republic Of Iran
Donors’ Conference on Sustainable Energy for Kosovo
Reconstruction of K4 Boiler for Biomass Combustion.
Uzbek Academy of sciences Institute of power engineering and automation Proposed project for international collaboration Construction of solar field in.
Southwark’s New District Heating Network.
AWARD FOR THE BEST ENERGY EFFECTIVE PROJECT 2008 in Slovenia Optimal use of renewable energy sources for heating and cooling of our office building Optimal.
Green Partnerships Local Partnerships for Greener Cities and Regions BIOMASS Expert working group on biomass Prepared by Veronika Valentar.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
Berlin, 8-12 May 2006 Gefördert durch die Europäische Union Promoted by the European Union Technological Educational Institute of Crete THE EXPERIENCE.
A HOUSE TO ECONOMIZE. MAIN TECHNOLOGIES USED FOR THE “ ECOLOGICAL HOUSE " This is a list of the most important technologies that we can use in our houses.
Storage and Distribution Radiant heating uses a series of tubes to distribute heated water throughout the main hut and cabins. However, the boiler isn't.
Renewable Technologies Available in Ireland Paul Kane.
The Komi Republic (KR)is the subject of the Russian Federation, a part of the North-West Federal District. Area thousand sq. km. Population -
CLIMATE CHANGE AND SME FINANCING 9 – 10 October 2013, Sofia Greenhouse gases emission assessment in SME and Household sectors – current status and tendency.
CAPABILITY OF INCREASING ENERGY EFFICIENCY IN EU HOUSING Nataliya Anisimova Czech Technical University in Prague
Energy Efficiency in Serbian Industry – Implementation of Cleaner Production Cleaner Production Centre of Serbia Faculty of Technology and Metallurgy,
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Options for climate friendly technologies for power generation and their related costs and potential environmental impacts Sustainable Energy Development.
Energy year 2013 District Heat Wilhelms District heat in Finland year 2013  Heat sales (incl. taxes) 2,31 mrd €  Sold heat energy31,7 TWh.
IEE/12/064/SI /02/2015. Municipality of Kecskemét - General economic data  Capital of Bács-Kiskun county  Economic, administrative, educational,
Renewable energy resources are the sources that can be replaced / generated at the same rate that they are being utilised.
District Heating Technology Improvement of district heating systems efficiency starts at the consumer New calculation tools help consumer and district.
«Energy Saving Policies in Greece» Dr. Litos Charalampos, Technical Chamber of Greece, Prof. Ioannis Vourdoumpas Chania
Environmental Protection and Infrastructure Operational Programme Tímea Baán EIOP Managing Authority Ministry of Economy and Transport.
County Council Prahova Region Location Energy Generation.
7th Inter-Parliamentary Meeting, Berlin Werner Weiss AEE - Institute for Sustainable Technologies (AEE INTEC) A-8200 Gleisdorf, Feldgasse 19 AUSTRIA INTRODUCTION.
Geothermal Heating System in the City of Bijeljina Bijeljina, City of Bijeljina City of Bijeljina Bosnia and Herzegovina.
REVITALIZATION AND MODERNISATION OF DISTRICT HEATING SYSTEMS IN SMALLER SERBIAN MUNICIPALITIES.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
TRACECA PROJECT EVALUATION. Construction of Unguri-Bronitsa border crossing point and access roads from Ukraine and Moldova.
The principle of solar energy Solar energy refers primarily to the use of solar radiation for practical ends. However, all renewable energies, except.
1 Norwegian experiences with renewable energy in the district heating sector and industry International training conference on RES, Gdansk November.
1 Case study: Sofia District Heating Dr. Venkata R. Putti Team Leader, Carbon Finance Assist The World Bank Minsk / Belarus, March 2007.
Energy year 2014 District Heat.
Dubrovnik Conference Island of MLJET Island of MLJET NEEDS & OPPORTUNITIES IN INFRASTRUCTURE KOMUNALNO MLJET D.O.O. FRANO HAZDOVAC, DIRECTOR.
Experience of Tukums Municipality Regarding Sustainable Development and Climate Change Zane Siliņa Chief project manager Development department of Tukums.
Taina Wilhelms Energy year 2011 District Heat.
Greenhouse Management.  List the different types of heating systems used in a greenhouse.  Describe the advantages and disadvantages of each type of.
DISTRICT HEATING District heating is an infrastructure which allows heat generated in a centralized location to be distributed to residential homes and.
Oddgeir Gudmundsson Applications Specialist Danfoss
Heat Plan Denmark Low Carbon Urban Heating Anders Dyrelund, market manager Rambøll Denmark.
Case application: Insulation and glazing, The Netherlands Harry Vreuls, NL Agency Workshop: Harmonization in Energy Savings Calculation: How To Fit International.
Energy Committee Annual Report The Selectboard established the Brattleboro Energy Committee in 2009, expanded its membership to 10 in 2012, and to 11 in.
09 tSeptember 2016 Daiva Matonienė Co-chair of U4SSC Initiative (ITU), Viceminister of the Ministry of Environment of the Republic of Lithuania JOINT EFFORTS.
Market possibilities within the energy efficiency in Latvia The Royal Danish Embassy in Riga prepared for The Danish Board of District Heating Inese Leja-Raphael.
Architecture Supported by:
Cook & Heat Stoves Use in Mongolia
Program for installing heating systems using renewable energy, including the replacement or completion of classic heating systems Between July 15, 2010.
Energy year 2015 District Heat.
EPC CONCEPTS and BUSINESS CASES
Dominik Franjo Dominković. , I. Bačeković, D. Sveinbjörnsson, A. S
PHYSICS.
Transition towards Low Carbon Energy Monday 12th June 2017
NEFCO Energy Efficiency and District Heating Projects in Ukraine
Finnish Climate and energy strategy and electricity markets
Renewable energy sources
PEA pilot project in Ignalina region Warm water all week
Geothermal district heating in the city of Kecskemét MLEI GeoKec – City of Kecskemét (HU) 21/03/ /03/2016 IEE/12/064/SI /03/2016.
Crude oil is pumped out of the ground, refined, and turned into gasoline, fuel oil, and other oil products.
District heating in Finland 2017
SOLAR PANELS SAVING IN YOUR HOME!
Renewable and Non-renewable
SCORES project presentation
Solar nova scotia case study: Solar Thermal Halifax
Presentation transcript:

„Banat sun 4 all-Pilot project for promotion and implementation of solar energy for sanitary water heating“ 1

Financed by European Union IPA cross border PROGRAM ROMANIA – REPUBLIC OF SERBIA IMPLEMENTS AND CO-FINANCES CITY OF PANCEVO IN PARTNERSHIP WITH ROMANIAN MUNICIPALITY LUGOJ 2

MAIN GOAL OF THE PROJECT: IMPROVEMENT AND MODERNIZATION OF HOT SANITARY WATER SUPPLY SYSTEM, THROUGH RESEARCH OF POSSIBILITIES OF RENEWABLE ENERGY USE IN PANCEVO AND LUGOJ PROJECT VALUE: 854.941 EUR TOTAL PANCEVO BUDGET: 674.760 EUR IPA FINANCING -PANCEVO: 509.988 EUR CO-FINANCING PANCEVO: 164.771 ЕUR 3

PUC DISTRICT HEATING SYSTEM WHAT ABOUT FURTHER PLANS ? CONTENT: ABOUT PANČEVO PUC DISTRICT HEATING SYSTEM HOT SANITARY WATER PROJECT BANAT SUN 4 ALL WHAT ABOUT FURTHER PLANS ? 4

Pančevo is a city 20km north-east from Belgrade 5

136,000 inhabitants - 76,000 live in the city 27,500 households 12,500 flats, public and bussines spaces connected to the district heating network (44%) Total: 820.000m2 5 th district heating system in Serbia 2,000 households use natural gas directly 13,500 use electricity, wood, coal ... 6

-2.500 or 25% more flats connected to the district heating system of By 2003 -Decentralized system 36 boiler rooms altogether with 55 operating boilers , total power 160 MW. -In season 1993/94 a total collapse of the system, the system worked for 80 days only, of 186 days of heating season. From 2003 to 2016 -2.500 or 25% more flats connected to the district heating system of 220.000m2 or 33%of flats, public and business spaces are connected to the system -Built and reconstructed 44km or 60% of total hot water pipeline 31 boiler rooms connected to district heating system and 8 boiler rooms of public and commercial buildings are CLOSED 7

Heating plant Kotež 53,6 MW (2x23,3MW+7MW) District heating system of Pančevo of today by the number of users is the 5-th system in Serbia Heating plant Kotež 53,6 MW (2x23,3MW+7MW) Pumping capacity 1600 m3/h, (100MW of users) Heating plant Sodara 26,5 MW (2x10,5MW+5,5MW) Pumping capacity 930 m3/h, (60MW of users) Boiler room Jastrebačka 1MW, Boiler room Sindjelićeva 0,8 MW Boiler room Svetog Save 0,14MW Total installed capacity 82 MW 12.500 flats or 640.000 m2 400 public and business users or 180.000m2 Total 820.000 m2 heated space, 2.200 users of domestic hot water 8

72 km of hot water pipeline 44 km new, less then 10 years old and 28 km from 30 to 40 years old red: new hot water pipeline built in the project rehabilitation and modernization of district heating systems funded by the EAR (4,5 mill. Eur) 2007-2008. orange: a new hot water pipeline built by our own fund or funded by new users from 2003-2014. blue: old hot water pipeline from 30 to 40 years old 9

areas that gravitate to certain heating plant 10

T HOT SANITARY WATER Pančevo is one of the only three cities in Serbia, together with Belgrade and Novi Sad where the district heating system is built for supply of domestic hot water to one community. Community Kotež 2 was built in 1983 when the district heating system for domestic hot water was also built. In the beginning ,there were 3200 flats which were connected to the system. System is designed to operate together with district heating as three pipe lines. Hot water for heating would be transported by one pipe line, by the second one for preparation of hot sanitary water, and by the third, common pipe, it would be returned from both systems. From the very beginning it was noticed that the system of hot sanitary water results in losses which were in 2010 -200.000EUR annually. 11

This measure reduced transport losses from 62% to 38%. All these years, PUC “Heating “ was in a vicious circle, for every year, losses were created, as according to law communal service cannot be canceled. Beside that, electric installations in buildings are installed not being prepared for consumption for electric preparation of hot sanitary water. Most losses were in heat dissipation because it was established by measuring that, during the summer period, mostly at common returning pipe, considering hot water, 62% of energy produced for heating of sanitary water is lost. It was decided that by investing in the system and applying for donation makes the system of hot sanitary water SUSTAINABLE. In 2012, City of Pančevo invested about 300.000 EUR in a new pipeline system. A new preinsulated pipe system was built of plastic mass for hot sanitary water supply. This measure reduced transport losses from 62% to 38%. Performance would have been even greater if it were possible to build an entire network of plastic pipes, but the first 220m of three pipe line DN500 had to remain, because it undergoes international road and replacement of this part of pipeline cannot be done before replacement of heating pipeline. 12

In 2011 we applied to IPA fund for the construction of a pilot plant for preparation of hot sanitary water id est for promoting of sun energy together with the Municipality of Lugoj in Romania. Although we passed evaluation, we were informed that in that moment there were not enough means for the financing of the project. In October 2015 it was offered to partner cities to finance the project, but now with a reduced implementation time from 24 to 12 months. Beside other activities, project in Pančevo consisted of construction of pilot plant consisting of 906m2 of solar collectors and pertaining equipment which would distribute the acquired energy. Solar energy would be used for the preparation of the hot sanitary water. More than 600 MWh of solar energy would be obtained this way, id est it would save about 92.000 m3 of natural gas and reduce pollution of CO2 for about 200 tons a year. This way, solar energy would substitute from 8% to 10% of energy for preparation of hot sanitary water. 13

14

This is going to be the biggest system of solar collectors for hot water production in Serbia. Collectors will be mounted on a steel consctruction so that the usable space below could be used for other purposes. It is going to be the only system that is incorporated into the District heating system. During the winter the energy from the sun collectors will be used to heat water losses in District Heating System or to heat combustion air and thus raise the boilers level of efficiency. 15

16

17

What about further plans and how to reach a sustainable system? System extention for more than 600kW of solar energy use for preparation of hot sanitary water. The use of heat pumps, the power of 2x300kW which would connect low temperature geothermal energy with preparation of hot sanitary water. The natural gas installation of condensation boiler systems 4x300kW which would amortize all situations when there isn’t enough energy from alternative sources. And , of course, completion of the heat distribution system from plastic pipes in order to have a completely independent system for hot sanitary water from the heating system. 18

THANK YOU FOR YOUR ATTENTION Zoran Božanić Technical manager zoran THANK YOU FOR YOUR ATTENTION Zoran Božanić Technical manager zoran.bozanic@grejanje –pancevo.co.rs CITY OF PANČEVO Trg Kralja Petra I 2-4 26000 Pančevo www.pancevo.rs 19