DRAFT Strategy Division 4 2011-2015.

Slides:



Advertisements
Similar presentations
DIVISION 4 Lighting and Signalling for Transport.
Advertisements

Project Cycle Management
LED Panel 28 th February 2008 LED Standardisation Lawrence Barling Senior Technical Manager The Lighting Association.
Ensuring that building products meet code requirements ICC Evaluation Service, Inc. The ICC-ES Evaluation Committee conducts open public hearings on proposed.
CIE and Roadlighting Steve Jenkins Division 4 Representative.
Chapter 4: Inception is Not the Requirements Phase
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Project Cost Management Estimation Budget Cost Control
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Your Project Proposal.
1 Project Management & Project Management Software Yale Braunstein School of Information Management & Systems UC Berkeley.
Runtime alignment system SOFTWARE DESIGN IDEAS Wed 4 th May 2005 P Coe.
Apr 2006COST529_0406.ppt1 Collaboration in the science & technology of lighting post-COST529 Stuart Mucklejohn COST529 UK National Representative British.
Subrecipient Monitoring. A formal binding legal agreement between your institution and another legal entity A portion of your sponsored project's.
Photometry of LED Lighting Devices
Analysis of the influence of aiming, on visibility distance and glare Poland 65 GRE, 29 March 2011 Dr EngTomasz Targosinski Informal document No. GRE
Land as a Resource State of play 5 March Land as a Resource: at the crossroad of objectives 1 and 2 of 7 th Environmental Action Programme (EAP)
 Road Safety the European Union Policy Carla Hess European Commission, Directorate General for Mobility & Transport Road.
Mesopic vision models and their application János Schanda 1 and Agnes Vidovszky- Nemeth 2 1. Virtual Environments and Imaging Technologies Laboratory,
Introduction to Information System Development.
Introduction to Systems Analysis and Design Trisha Cummings.
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
Action Plan Intermodal & ITS Experts Group June 2011 Update.
Smart cities Rasmus Lindholm, Director, ERTICO – ITS
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
___________________________________________________________________________ 2008/TPTWG30/IEG/01 Agenda Item: 7.0 Action Plan for the Intermodal & ITS Experts.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
Cluster Management Scorecard FITT (Fostering Interregional Exchange in ICT Technology Transfer)
RBM and Asset Strategy.
20th AIAA Advanced Measurement and Ground Testing Technology Conference Lessons Learned in AIAA Working Group Development E. Allen Arrington Dynacs/NASA.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Neighbourhood Planning Miles Thompson Shared Planning Policy Manager South Oxfordshire and Vale of White Horse District Councils
IRES: an update on the revision process Vladimir Markhonko United Nations Statistics Division The 4 th meeting of the Oslo Group on energy statistics Ottawa,
Using Information Technology to Reduce Traffic Jam in a Highly Traffic Congested City Sayed Ahmed and Rasit Eskicioglu We propose a cost effective and.
EGEE NA3 Status Prof. Malcolm Atkinson Director John Murison Training Manager CERN 14 th January 2004.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Project Risk Management Planning Stage
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October/December2008.
Gianluca Rossi NCP INCO and FAFB Theme APRE Iacopo De Angelis NCP ICT 31 March 2010 ABEST II Workshop Roles of partners and partner search.
1 Science Definition Team Meeting National Aerospace Institute Hampton, VA Dec 1-3, 2015.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Program and Quality.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
TK2023 Object-Oriented Software Engineering
Operations as a Competitive Weapon
Project Management Information and Tracking Advanced Concepts
The Opportunity of a Lifetime
Status DEX Publication Project
Project Management Lifecycle Phases
Simplification of Lighting and Light-Signalling Regulations
Goal of the workshop To define an international roadmap towards colliders based on advanced accelerator concepts, including intermediate milestones, and.
WG Technical Editor’s Report
Recognization and management of RISK in educational projects
CENELEC TC215 WG3 (EN Series)
Standards and Certification Training
Analyzing the Business Case
Introduction to Systems Analysis and Design
2010 Content Standards for K-12 Second Language
on Priority Substances Strategic Coordination Group
SMART & CARING GRANT APPLICATION WORKSHOP
Third International Seville Conference on Future-Oriented Technology Analysis (FTA): Impacts and implications for policy and decision-making 16th- 17th.
Snow tyres provisions - status report
CEN/WS XBRL PT kick-off meeting
Reporting on the Project
DSG Governance Group Recommendations.
Putting Some Reality into the Glare and Visibility Debate
Presentation transcript:

DRAFT Strategy Division 4 2011-2015

Evaluation of Previous term 2007-2011 Previous term 2007-2011 Technical Energy consumption Solid state lighting Intelligent road lighting (TC4-44) Lighting concepts (TC4-36, 1C-P5,Ton van de Brink; 1C-P7, Narisada) Reflection properties of road surfaces (1C-P11, Cyril Chain) Retro reflective and other passive devices as energy savers Lighting for elderly (?) (CIE draft, Ken Sagawa) Technical basics (mesopic vision, photometry, calculations, measurement,...) TC4-47 nearly ready? TC4-44 published, R4-45 TC4-44 and TC4-51? TC4-50 R4-34 Workshop 2011, group of reporters, interdivisional TC? TC mesopic?, TC4-15, ...TC4-33... on going

Evaluation of Previous term 2007-2011 Organizational Highlights Balance with necessary fundamentals Changes of the environment TC’s: Review of ToR and membership Lead time Number of TC’s (<10?), less parallel, short list Reporters: Smaller jobs; publication in e.g. CIE News For quicker start-up of TC Publications D4: Existing publications up to date? Documents Proposals submitted in advance Identification by numbering  Realistic plans to fulfil expectations As many TC’s on fundamentals as more application oriented TC’s Still needs much attention. Including TC4-11, number of TC’s: in 2007: 20 TC’s in 2011: 15 TC’s More reporters than before. Reporters prepared : TC4-49, TC4-50, TC4-51 Official reviewing cycle D4 enquiry (2*) but lack of volunteers Still not accepted in practice This is normal in standardization org’s; CB will look into this REAL LIFE: VOLUNTEERS with ample time

Evaluation of Previous term 2007-2011 Fundamental TC y TCC Application 15 Calculations 1990 21 2003 8 45 Vehicle Headlamps 2005 6 2010 1 19 Visibility in Fog 1989 22 ? 46 Roundels 21 Light Pollution 200? 47 Applications of LEDS 2007 4 32 Surface Colors 1994 17 2008 3 48 White Light 33 Discomfort Glare 2006 5 49 Retro-reflectors 36 Visibility Design 50 Road Surfaces 40 Retro Materials 1998 15 51 Optimization

Reviewing CIE D4 Publications UK comment UK Recommendation Evaluation of Previous term 2007-2011 Reviewing CIE D4 Publications UK comment Reports are produced in isolation UK Recommendation cluster and investigate existing publications before producing new ones at new assignment of TC first check which publications already exist and should be reviewed 

Review publications DRAFT Running TC’s (“basic”) Publ. Running TC’s (“application”) 15 Calculations 140 45 Vehicle Headlamps 19 Visibility in Fog 46 Roundels ISO/CIE S006 79 Comment from review enquiry 21 Light Pollution 126?? 47 Applications of LEDS 32 Surface Colors 039 48 White Light 33 Discomfort Glare 031 49 Retro-reflectors 72 74? 36 Visibility Design 50 Road Surfaces 66 47, 66, 144 40 Retro Materials 113 51 Optimization 93 Closed TC’s Single Volunteers 38 was stopped due to lack of progress 074 Reporter 4-33 072 44 115 ready Axel Stockmar 132 32, 136? Comment from review enquiry priority S004 Paul Lutkevich 136

Transfer to 2011-2015 Evaluation of Previous term 2007-2011 Technical Rev. of CIE 30.2, measurements; is CIE 194 including this? Lighting quality parameters review included in TC4-47? No? Lighting concepts: really included in TC4-51? Probably? Interdivisional TC Elderly, to be prepared by reporters D1,3,4,5 TC Mesopic vision application DE4: Extract relevant parts from CIE 194:2011 On Site Measurement of the Photometric Properties of Road and Tunnel Lighting by TC4-26 for feasibility fast track glossary/ standard)

Transfer to 2011-2015 Evaluation of Previous term 2007-2011 Organizational Transfer to 2011-2015 lead time TC’s reviewing cycle of existing publications in practice lack of volunteers use of collaboration tool and webex document numbering

STRATEGY 2011-2015 Technical Energy Mesopic vision Application of LED’s Review of quality parameters Effects of spectral distribution Road reflection properties Passive devices Lighting concepts Control strategy (TC4-51) Mesopic vision Lighting for Elderly (Interdivisional TC) Basics Rev. of CIE 30.2, measurements CIE 194 glossary/ standard? Existing fundamental TC’s

Use of collaboration tool and webex When starting TC: STRATEGY 2011-2015 Organizational Code of procedures Lead time TC’s Use of collaboration tool and webex When starting TC: evaluate/cluster existing publications produce work schedule (possibly by reporter) Reviewing cycle of existing publications in practice TC meeting schedule (each TC >1/y) Lack of volunteers Document numbering

Wishes from ILN International Lighting Network ILN Tuning the current work program of the division? Divisions need to deliver Funding possibilities? Joint activities Current activities probably in the scope LED’s TC4-47 new TC on mesopic vision TC4-51 New topics?

HAVE FUN AND SUCCES