ISSUES WITH RETROFIT REQUIREMENTS FOR HVRT

Slides:



Advertisements
Similar presentations
An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green.
Advertisements

STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
November 19, 2013 Preparing a Successful RFP to get Desired Results.
ISSUES WITH RETROFIT REQUIREMENTS FOR HVRT 1. CURRENT SITUATION WGRs HAVE HAD A CLEAR LIMIT OF 1.1 pu SPECIFIED FOR HVRT IN THE GUIDES WGRs ARE NOW BEING.
System Strength Discussion
Time for a new standard - AS General Conditions of Contract
Specification Writing Presentation Training & Development.
Chapter 17 Acquiring and Implementing Accounting Information Systems
Wind Grid Codes GE Energy Asia Development Bank
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
ERCOT John Adams September 14, 2012 Planning Guide concepts for dealing with Sub Synchronous Resonance in ERCOT & other issues.
FAR PART 45 – Government Property
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
FAR Part 2 Definitions of Words and Terms. FAR Scope of part (a)This part – (1) Defines words and terms that are frequently used in the FAR; (2)
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
Ordinary Capital Expenditures Approvers’ Course Course runtime approximately: XX Minutes.
Project WECC-0100 Update Reliability Subcommittee February 2014.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
RTWG Report to TAC August 5, 2010 Howard Daniels.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
WELCOME TO UNB. MARK McGEEHAN Assistant Manager, Procurement Services 3 plus years with UNB 28 years in Healthcare Procurement Current member of APPA.
Submitting IT Purchasing Statements of Work to DIR SB 20 COMPLIANCE FOR TEXAS STATE AGENCIES TECHNOLOGY SOLUTIONS FOR GOVERNMENT AND EDUCATION.
PRR835 – Reactive Power Capability Requirement
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Managing Authority of EU Funds – Ministry of Finance 1 Methodology of selection of project applications for EU funds including preparation of appraisal.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Salient IRR Revisions Alternative Methods of Procurement.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
ERCOT VRT Voltage Ride Through Standards. Standards Groups Edison Electric Institute (EEI) National Electrical Manufactures Association (NEMA) American.
Distributed Generation Registration June 30, 2008.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Chapter 8 Final Construction Final construction in the SDLC Construct and test programs Construct and test the database Obtain additional hardware Prepare.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
1 DESIGN RESPONSIBILITIES Contract Information Supplied by Design Team Responsibility of the Precaster Option I Provide complete drawings and specifications.
Panhandle Renewable Energy Zone (PREZ) Study
CREZ Related Generation Interconnection Studies July 2008 Jeff Billo RPG meeting
Respect for the Individual · Humility · Innovation · Excellence · Teamwork · Integrity System Strength/Short Circuit Current Minimum Requirement June 5,
Generation Adequacy Task Force Meeting April 10, 2014.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
Ajay Pappu Resource Integration Department ERCOT Generator Frequency Relay Settings Survey Dec 2013.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
GIC System Model Workshop
Freeport Area Master Plan Project -
NERC Lessons Learned Summary
PLWG Review 6.9 and the Interconnection process
Design and modeling 10 step design process
Using Analytics To Improve Contract Lifecycle Management
Phase Angle Limitations
FAR Part 2 - Definitions of Words and Terms
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Reliability and Operations Subcommittee Report
Developing and Issuing the RFP
Chapter 13 Overall Audit Plan and Audit Program
Background (history, process to date) Status of CANs
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Chapter 13 Overall Audit Plan and Audit Program
PARCA Security and Termination Amounts
Standards Review Subcommittee Update
Project WECC-0100 Update Reliability Subcommittee
7 KEYS FOR RESPONDING TO AN RFP For many businesses, the first step in generating revenue is responding to a request for proposal (RFP). RFPs are invitations - contraxaware.com
Presentation transcript:

ISSUES WITH RETROFIT REQUIREMENTS FOR HVRT

CURRENT SITUATION WGRs HAVE HAD A CLEAR LIMIT OF 1.1 pu SPECIFIED FOR HVRT IN THE GUIDES WGRs ARE NOW BEING DEVELOPED THROUGHOUT ERCOT IN MANY STAGES OF COMPLETION BASED UPON CURRENT STANDARDS ERCOT PANHANDLE STUDIES INDICATE CERTAIN CONTINGENCIES CAN RESULT IN VOLTAGE SWINGS EXCEEDING 1.1 pu

CURRENT SITUATION CURRENTLY DEVELOPERS ARE CONTACTING VENDORS AND PERFORMING STUDIES TO DETERMINE THE ABILITY TO COMPLY WITH HIGHER HVRT REQUIREMENTS A NERC HVRT STANDARD (PRC-024) IS BEFORE FERC FOR FINAL APPROVAL; IF APPROVED, PRC-024 ALLOWS FOR A 5 YEAR PHASE IN

KEY ISSUES/QUESTIONS IT IS NOT CLEAR WHY THE CURRENT HVRT STANDARDS ARE NOT WORKABLE DEVELOPERS MAKE SIGNIFICANT COMMITMENTS WELL BEFORE THEY SIGN THE SGIA MAKING UNTIMELY CHANGES COSTLY THE COMPLETED TSP FISs IN THE PANHANDLE DO NOT INDICATE ANY VOLTAGE SWING PROBLEMS

KEY ISSUES/QUESTIONS UNDER WHAT CONDITIONS DO THE STUDIES INDICATE POSSIBLE PROBLEMS ARE THE MODELS CORRECT CHANGES TO STANDARDS MUST BE MADE WITH ENOUGH LEAD TIME TO ALLOW THE INDUSTRY TO RESPOND EFFICIENTLY NEW HVRT STANDARDS APPLIED TO THE POI ARE FAR MORE DEMANDING THAN HVRT STANDARDS APPLIED TO THE TURBINES

KEY ISSUES/QUESTIONS ANY CHANGES THAT ARE SHOWN TO BE NECESSARY AND EFFICIENT MUST BE PHASED IN (PRC-024 ALLOWS FOR 5 YEARS FOR FULL IMPLEMENTATION) IF NEED IS DEMONSTRATED ONLY IN THE PANHANDLE, THEN OTHER AREAS SHOULD NOT BE INCLUDED IN NEW STANDARDS IF NEED IS DEMONSTRATED THEN ALL TECHNOLOGIES IN THE PANHANDLE SHOULD BE INCLUDED, NOT JUST WGRs

KEY ISSUES/QUESTIONS COMPLIANCE EVALUATION CRITERIA NEED TO BE ESTABLISHED WHICH PROVIDE MODELING REQUIREMENTS AND ASSUMPTIONS TO BE USED BY DEVELOPERS/TSPs THRESHOLDS OF PANHANDLE DEVELOPMENT NEED TO BE ESTABLISHED WHERE THE HIGH VOLTAGE PROBLEMS FIRST APPEAR

WGR PROJECT DEVELOPMENT ACQUIRE LAND (LEASES) WIND SURVEY ERCOT INTERCONNECT REQUEST PRELIMINARY DESIGN CONTRACT FOR TURBINES/ WARRANTIES CONTRACT FOR CONSTRUCTION/WARRANTIES FINAL DESIGN FIS REQUEST CONTRACT FOR BOP CONTRACT FOR PPA/FINANCIAL HEDGES FIS COMPLETED OBTAIN FINANCING SIGN SGIA POST SECURITY BUILD