24/7 Systems Mission Integrate, communicate, and analyze PLANT RELIABILITY INFORMATION From multiple plant condition, repair, overhaul, installation, and.
Advertisements

Online Tenant Request System Reliable and accurate, the IMPAK online tenant request system significantly reduces telephone time and paperwork.
Aims e-Business Applications An Overview of Aims Inventory and Procurement Management Design By: Shaikh Abdul Aziz.
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
More than experience CERN – 3rd MAY 2011 – Kick-off meeting Maintenance Assessment Project – Kick-Off Meeting Arek Burnos, Tony Vaclavicek, Tom Pryslak.
Order Processing Packaging & Shipment
Enterprise Asset Management (eAM)
An overview of the CERN CMMS
MFI Office Maintenance Management Project Presentation 30th of May
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Business Reviews.
Enterprise Asset Management
2013 NPMA Fall Conference Value Through Professional Asset Management Disposition Process Best Practices Marcia Whitson, CPPM CF Cheri Cross, CPPM CF November.
From Research Prototype to Production
Maintenance Specificities in the CERN Cooling and Ventilation Group Asset and Maintenance Management Workshop CERN, November 2013 I. El Hardouz,
Automatically Capturing Data from SCADA to the Maintenance System
Optimizing Marketing Spend Through Multi-Source Conversion Attribution David Jenkins.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Organization, Projects and Activity Forecast 2012 Oliver Böttcher, 29 th of March 2012 EN-HE-HM Handling Maintenance Section at CERN.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Maintenance Management Project EN Dept. Implementation Project Mario Batz EN-CV Maintenance Management Workshop 25 th November 2011 EDMS EDMS
Damien Lafarge on behalf of MMP Engineering Department Work Organization, Maintenance Planning and Maintenance Experience session Pierre Bonnal Christophe.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
New Meter Work order is created by ELopez or MCruz Init Dept: ENG, Route to Dept: CS Status: REQUEST.
Review of the processes released in the framework of the MMP Goran Perinić.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Safety Documentation Formerly an exotic unknown, today part of the work!
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Georgia Department of Transportation Performance Measures - A Case Study in Progress.
July 2014, TE-CRG-MLEDMS Naming Key Issues – List of Naming conventions in use QAC Naming Conventions Sub-committee Meeting n.2 S. Knoops QAC TE(-CRG)
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Trends in Utility Service Centers Service center planning needs to consider new practices in the industry and the operations these facilities support.
 TATA CONSULTANCY SERVICES MM - Inventory management.
Storage and Warehousing Techniques
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
The Compelling Solution . .
Handling Engineering Group
An introduction to Infor EAM at CERN
Test beam check list Michael JECKEL EN-EA-EC.
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Implementation of Computer Maintenance Management system - CMMS
Strategy for conformity of non-standard cryogenic equipment
IT Asset Management Status Update Hardware Asset Handling
Reliability Analysis & Infor EAM
Infor Reporting Options and Pentaho
Safety in Construction and Upgrade Phases
The University of Jordan Mechatronics Engineering Department
The MTF adjusted system to meet Vacuum Group needs
EN-HE SPS works during EYETS
News from QAC and Central Services
Reliability and Maintenance Management as a Part of Asset Management
IT Asset Management Status Update Hardware Asset Handling
SAFETY MEETING THE SAFETY OF YOUR DOOR STARTS WITH YOU. ABESDOOR.CA
GIS Portal Racks Project
Systems Design, Implementation, and Operation
Damietta Container & Cargo Handling Co.
SUBMISSION TITLE Raghu K T – Director Capgemini.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
ETRTO proposal for UN R30 & 64 amendments Extended Mobility Tyres
Property, Plant and Equipment (PPE) register in Infor EAM
Infor EAM in the Handling Engineering Group at CERN
ESA's TEC Directorate Asset Management - Present and Future
Warehouse Management System. Brilliant’s warehouse control system is specially supporting your day to day operations for your single or multiple warehouses.
Presentation transcript:

Asset & Maintenance Management @ EN-HE group Damien Lafarge – EN-HE-LM section leader

Overview of A&MM @ EN-HE Introduction Assets Spare Parts Documentation Work traceability Work Scheduling (Reporting) & Maintenance Management Conclusion

Introduction - Handling Engineering group Maintenance and consolidation of handling equipment, e.g. Lifts Overhead cranes, hoists, special equipment Forklifts, hand pallets, special equipment Operation by public users or by professional users

Assets @ EN-HE Fleet of 3442 assets 15 Classes of assets All assets managed with Infor EAM All assets have yearly safety inspection by HSE All relevant assets in the PPE project

Assets @ EN-HE Equipment (Asset or Functional position) is the focal point for a good asset and maintenance management system Reports to share information Meters to better know your fleet/individuals (including automatic transfer from Timber) Good practice = put online reports with custom fields to share information about equipment Bad practice = try to put everything into the database (e.g. 144 CF for each crane)

Spare parts @ EN-HE (only cranes) 4100 references as parts 33 references as assets (200 assets) 11 classes of parts 180 spare parts attached to work orders since 2015 Part ref. HHZ02877

Spare parts @ EN-HE Attachment of parts/assets to work orders (traceability) Catalogue of prices Inventory of warehouse in bdg7 for old parts with photo EXAMPLE of part ref HHZ02877

Documentation @ EN-HE (cranes, forklifts) 1203 assets in documentation management project (HPR) 329 docs identified for treatment 320 docs treated (97%) Next targets = special vehicles (done) and lifts Chiffres de 2014, chariots terminés entre-temps et nouveaux ponts roulants en cours d’intégration

Documentation @ EN-HE Accessible from any mobile device onsite One set of documents Effort optimized with new equipment (specifications) EXAMPLE LIFT “CRAS-00045” EXAMPLE CRANE “CRPR-00774” Reporting still difficult Chiffres de 2014, chariots terminés entre-temps et nouveaux ponts roulants en cours d’intégration

Work traceability ~4800 foreseen in interventions in 2016 Feedback within the day via mobile devices Regulation impose to trace each intervention Link with parts Photos in EDMS RP doses (TREC) Link with IMPACT

Work traceability Processes being harmonized at the group level in 2016 Optimization of fields filled Optimization of reports Lots of KPIs rely of work order’s data EXAMPLE for a lift EXAMPLE for a crane with parts or photos

Maintenance planning & scheduling 4800 interventions in 2016, 690 IMPACT generated, mostly linked with Infor Consistency of information Reduction of double-entries Still need some debugging / development Use of maintenance plans to generate work orders (e.g. 5 PM for ~1400 work orders) Condition-based maintenance will be considered in the coming 1-2 years based on meters and R&D program

Maintenance planning & scheduling EXAMPLE OF LINK IMPACT & INFOR

Reporting and Maintenance Management Reports defined at operational level (50+ reports) Very little demand for managerial KPIs

Reporting and Maintenance Management New report for maintenance management purposes launched in 2016, lead to the refurbishment of work traceability processes! EXAMPLE : report for HE and HM12HM15

Conclusions First define KPIs/goals (validated with group management), then start your project!!! Iterative process (Deming Wheel) per equipment class with a cycle duration of 2 years minimum; The Maintenance Management Project was a good start for EN-HE group; No metrics taken at the beginning of the project, difficult to measure the impact of maintenance management improvements;

Thank you, questions ?