CLIC Handling Engineering Update

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
FCC layout: lifts & cranes Ingo Rühl / EN-HE FCC Infrastructure & Operation Meeting 17 December 2014.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
Remote Handling design progress for the Collimation Upgrade project Keith Kershaw EN-HE 6 June 2011.
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Transport and Handling (T&H) considerations for HL-LHC
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
ILC TRANSPORT AND INSTALLATION Questions from last CES: Beam height explanation, Transport implications of sloping access tunnels proposed for access to.
Transport & Handling of Detectors TAN Workshop S. Prodon –
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
ICARUS Collaboration Meeting Dec A. Scaramelli.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
 Reduce costs.  Reduce damage.  Increase space and equipment utilization.  Increase throughput.  Increase productivity.  Improve working conditions.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Experimental Hall in Mountain Regions
Storage and Warehousing Techniques
CLIC Civil Engineering Update
Schedule CM SPS G.Vandoni.
Updated Design of Detector Hall
SBN Far Detector Installation & Integration
IT-4189 Supply and installation of a cryogenic distribution system
EN-Handling Engineering Group
SX1 manipulation VERSION 1 Version
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
CLIC Civil Engineering & Infrastructure
Experimental hall design in Japanese site
FCC lifts Layout, characteristics etc.
News from Integration WG
INSTALLATION SEQUENCE
Detector Service Cavern for ILC
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
Accelerator and Experiment Interface Session: LS2, LS3
Status of Cryogenics Facilities Design
A very first look at siting issues
COOLING & VENTILATION INFRASTRUCTURE
IT-4328: Technical Specification
Update on Junction Box Design
UK RFD Pre-Series cryomodule
Cryogenic cavern in Asian site
Detector hall in mountain regions
RDR Baseline Layouts for Interaction Region
LINAC 3 Meeting ICL machines Injectors
Presentation transcript:

CLIC Handling Engineering Update Michal czech – ingo rueHl en-he

Outline Surface transport & handling Shaft Underground handling Questions/ What is next?

Surface transport Surface transport in between the buildings carried out using the fleet of road transport vehicles (feasibility studies to be done). Surface transport within buildings carried out by: Mobile cranes, Overhead cranes, Forklifts, Industrial lift trucks, Trucks and trailers, Pallet trucks, Etc. * Any specific requirements to be determined. Specific requirements like fragility, tilt, max speed, loading/unloading ways, etc.

Surface handling – EOT cranes Building Type: Crane load capacity (tonnes) Detector Assembly 2x80 (CMS approach) + strand jacks Colling Tower and Pump Station 3.2 Colling and Ventilation 20 Cryogenic Warm compressor 20 Cryogenic Surface Cold Box 20 Workshop 10 Central Area Machine Cooling Towers 5 Shaft Access 20

Surface handling - Questions Q: Traveling crane full length of the Klystron & Modulator Building, is there a need for it? A: Two possible solutions are: EOT crane: Increased height of the building; No constraints on floor live load; Possibility to have more equipment in the building. Surface/road/ground vehicles: Increased surface of the building (an access to all the equipment needed); Constraints on the floor live load. Depending on the amount of the equipment that will be installed in the building a need of the crane can be evaluated. Davide Aguglia is on holidays until 4th of Sept

Transfer: Surface  Underground Shaft Access point: shafts (10 total, 3 during 380 GeV stage) * Iinclined tunnels only when shafts are not feasible (geographical or environmental reasons). Shaft requirements: Evacuation Shaft maintenance (cables, pipes, etc.) Quick access for people and equipment Transport means: Stairs Stairs/ tremie (crane maintenance platform) Lifts/ tremie

Transfer Surface – Underground Shaft Q: Are the new dimensions of the handling opening (tremie) adequate? A: The longest object is beam pipe (10m) The heaviest object is Dipole (5 t) Transport of the klystron modulator tank not verified (can it be turned? 2000mm x 1500mm x 1000mm – dimensions of the shaft and lift reached). Q: Are the lift dimensions and capacities adequate? A: standard 3t lift used in LHC (can be adapted) Tremie dimensions: Module 2010x1550x1200 1500kg-1700kg Mb tl quadrupole 2000x200x200 300kg Beam pipe 10000x200x200 30kg Dipole 600x800x1500 5000kg

TO BE UPDATED Transfer Surface – Underground Shaft LIFT 3-5t LIFT 3-5t TREMIE Tremie dimensions: Module 2010x1550x1200 1500kg-1700kg Mb tl quadrupole 2000x200x200 300kg Beam pipe 10000x200x200 30kg Dipole 600x800x1500 5000kg

Underground transport Machine Cavern: Transport of each accelerating structure on the Trailer-Crane vehicle; Space for the truck support needs to be defined and reserved (by EN-HE); Cable trays access and position to be discussed; Transport volume should not be less than 950mm.

Underground transport Klystron Cavern: Modulator tanks installed before other equipment. Is there maintenance foreseen? Transport volume width min 900mm (EURO Pallet width 800mm); Monorail above the Klystron solenoid for the maintenance; Min 500mm clearance below fixed part of the hoist. Q: Operation frequency Support fixed above (false ceiling?) Monorail with electric hoist

Questions/ What is next? Updated list of the equipment for each building/area with dimensions; Please think about the transport when designing (lifting points, CoG, installation)  ;