SLSP activated well on April 7th

Slides:



Advertisements
Similar presentations
Gun summer shutdown New NEG’s - Ten 9.5” strips New NEG tube – 27 hr. sputtering time New cathode – “yellow” 25 deg SS polished to 1um, 100kV.
Advertisements

Status of 500-kV DC gun at JAEA N. Nishimori, R. Nagai, R. Hajima Japan Atomic Energy Agency (JAEA) M. Yamamoto, T. Miyajima, Y. Honda KEK H. Iijima, M.
NCEA Physics Thermionic emission.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
PSSC Space Instrument Laboratory Plasma instrument calibration system provides an ion beam of energy range up to 130keV/charge in a clean room To develop.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Prototype TPC Tests C. Lu 12/9/98 V = 0. Gas gain test for the low pressure chamber The chamber is constructed with the following parameters: D anode.
Scanning Electron Microscope Jamie Goings. Theory Conventional microscopes use light and glass lenses SEM uses electrons and magnetic lenses to create.
05/20/ High-Current Polarized Source Developments Evgeni Tsentalovich MIT.
WG4 Injector and beam manipulation concepts (low emittance e+ and e- sources, emittance exchange, reduction and preservation approaches,...) John Power.
The Electron Cloud And Secondary Electron Yield Tom Schmit Mentor: Bob Zwaska.
St Columba’s high School Electricity and Electronics Electric Fields and Resistors in Circuits Alternating Current and Voltage.
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
09/13/20111 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
1 First observations on CsI -coated ThGEM in Trieste presented by Gabriele Giacomini phone meeting 06/08/2008.
Agenda Cooling finger HV-Prep Valve (2-3/4” vs. 4-1/2“) Puck moves = QE falls Prep vacuum & bakeout Abnormal beam shape and orbit from HV chamber.
1 Satoshi Mihara for the   e  collaboration, review meeting at PSI, Jul 2002 Photon Detector Satoshi Mihara ICEPP, Univ. of Tokyo 1.Large Prototype.
The CEBAF 200kV Inverted Gun P. Adderley, M. BastaniNejad, J. Clark, J. Grames, J. Hansknecht, J. McCarter, M. Poelker, M. Stutzman, R. Suleiman, K. Surles-Law.
High Intensity Polarized Electron Gun Studies at MIT-Bates 10/01/2008 PESP Evgeni Tsentalovich MIT.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lifetime Measurements.
Advanced Welding Technique
4 th Electron-Ion Collider Workshop, Hampton University, Monday May 19 th, 2008 CEBAF Load-Lock Polarized Electron Photogun Joe Grames & Matt Poelker (Jefferson.
1 Fulvio TESSAROTTO GDD meeting, CERN, 01/10/2008 Trieste THGEM news New THGEM test in the COMPASS hall New THGEM test in the COMPASS hall Preparation.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Beam Loss Issues for High-Power, High-Brightness Electron Injectors Bruce Dunham Cornell University December 18, 2012.
PXIE absorber test bench A. Shemyakin, C. Baffes, K. Carlson, B. Hanna, L. Prost, J. Walton November 6, 2012 Project X meeting Test bench description Difficulties:
Calibrating DC Current Shunts: Techniques and Uncertainties Jay Klevens, Ohm-Labs, Inc. © 2011.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
A bit of CEBAF polarized source history…
Beam Commissioning Adam Bartnik.
Electrostatic deflector development at RWTH Aachen
Movement of Charged Particles in Electric Fields
JLEIC R&D weekly meeting, Thursday Jan 26, JLab.
Bubble Chamber Schedule – 2017
SUMMER 2017 SUMMER 2018 >= SUMMER 2019
Photocathode analysis and characterization at DESY
Why are we removing our very good gun?
Twisted Electrons Planning Discussion
DC Injector and Space Charge Simulation Status
Tunnel Penetration Tunnel Floor Gun Little Oil Tank ISB Rack
Thomas Jefferson National Accelerator Facility
Parity Quality Beam (PQB)
5 MeV Mott Measurement for CEBAF Operations group
Further Measurements of Photocathode
First observations on CsI-coated ThGEM in Trieste - ADDENDUM -
QWeak Collaboration Meeting
Charlie Sinclair Cornell University (retired)
Summer ‘09 SAD Same good photocathode PREP and LOAD chambers
Ch. 4/5 Notes Day 5 2/2/16.
Status of 500-kV DC gun at JAEA
Production of Magnetized Electron Beam from a DC High Voltage Photogun
Perturbation of Focusing Field Profile due to HV Support Tube
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Atomic Emission Spectra
R. Suleiman and M. Poelker October 12, 2018
Studies of Emittance & Lifetime
Riad Suleiman February 2, 2017
A. Freyberg Aug 2016 ECT’16 =>
Carlos Hernandez-Garcia Don Bullard February 2, 2017
Polarized Source: Recent Activities
350kV and 500kV Yan 9/8.
CSC Turn ON Status Report by Fred B.
Electron Gun UP (EGUP) Plan
Preliminary analysis of PS septum 31 failure August 8th, 2008
Ion simulations in the GTS at 300 kV
Simulation of Emittance
LLGUN2 Biased Anode Commissioning
Secondary Electron Emission and Photoemission Tests
Presentation transcript:

SLSP 5246-4 activated well on April 7th Used LLGUN2 modestly for remaining SAD and Physics start-up OK through April 24th

Field Emission begins? on April 24th (QE has fallen significantly already)…

Opportunistically hi-pot HV chamber on 4/27. Reach ~120kV each time … finally, viewer flashes (light, not electrons?) Anode current reduced from ~60pA to ~30pA Wafer preserved in PREP =>

Beam orbit drifting for last few days (over April-May weekend…) Tunnel investigation on May 1 Lasers check out OK Hall B laser spot fixed (result of bad beam tweeking…) QE now very bad (max ~0.07%) Found anode isolation bad (30k Ohm instead of 50 Ohm) Limp along with spot moves, but QE falls rapidly….

FE emission begins 4/24, orbit drift with hi-potting 4/27, but stabilizing ….

Gun2 wafer activated May 6th very well (1 Gun2 wafer activated May 6th very well (1.2%), OK for program, but continues to drop… Connected picoammeter to anode for investigation (anode connection good) Anode current >20pA always (except when HV off) Calibration of HVPS/anode suggests ~120nA FE per 1pA of anode current Anode current: <50pA beam ON, but up to 150pA when beam OFF

May 11th : Vacuum burps even when HVPS has been off… vary IP voltage May 11th : Vacuum burps even when HVPS has been off… vary IP voltage? Ground cage?