SCADA Selection and Usage at CERN

Slides:



Advertisements
Similar presentations
ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
Advertisements

DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
Business Development Suit Presented by Thomas Mathews.
Status Enterprise System Overview. What is Status Enterprise? Status is an HMI/SCADA system with live and historical data, trending, alarming, web and.
AXIS Camera Station Flexible surveillance software for your Axis network video products Sales Presentation Welcome to this short presentation of the.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
TAC Vista Security. Target  TAC Vista & Security Integration  Key customer groups –Existing TAC Vista users Provide features and hardware for security.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
1 Past Present Future A Honeywell Company Products and Services.
AxxonSoft Company Profile Products overview References.
Professional Informatics & Quality Assurance Software Lifecycle Manager „Tools that are more a help than a hindrance”
14 Nov. 2000EPICS Workshop - Oak Ridge1 DESY SCADA Experience Matthias Clausen DESY/ MKS-2.
130 October 2009 PIC - WIC - LHC_CIRCUIT UNICOS PVSS.
Automated Production Report Generation with OPC DataHub Your Host Today: Colin Winchester, Director of Support Presenter: Win Worrall, Application Engineer.
OPC and EPICS M. Clausen EPICS workshop Trieste’99 1 OPC Introduction and EPICS Perspectives Matthias Clausen.
CERN - IT Department CH-1211 Genève 23 Switzerland t The High Performance Archiver for the LHC Experiments Manuel Gonzalez Berges CERN, Geneva.
Automatically Capturing Data from SCADA to the Maintenance System
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
SCADA Systems - What is the scope of this talk? What are SCADA systems? What are their structure and main features? How open are they? How are they evolving?
Windows Control Center
SCADA. 3-Oct-15 Contents.. Introduction Hardware Architecture Software Architecture Functionality Conclusion References.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
1 Monitor System Reliability alarm on demand, sag/surge, and etc. Perform Advanced Power Quality Analysis provide real-time trending. Centralized.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
© Siemens AG All rights reserved. openlab III Board of Sponsors 3-4 May 2011 at CERN Joint Report Siemens - CERN.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
FAIR Accelerator Controls Strategy
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
1 JCOP-UNICOS. 2 Purpose of this meeting Requested by IT/CO To present you the UNICOS requirements on the hierarchy classifications Not to discuss the.
The CERN Computer Centre Supervision Project Helge Meinhard / CERN-IT HEPiX Catania 2002/04/18
PVSS: Windows  Linux. 13th May Outline Current software architecture PVSS on Linux Demo What has to be redone for Linux console Vacuum, GCS, cryogenics.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
JCOP - 17 October 2001NA60_GAZ - E. Mazel J. Rochez1 A Project for the GAS control System At NA60.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
Overview of Basic 3D Experience (Enovia V6) Concepts
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Open source IP Address Management Software Review
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
Products and Services.
REDCap General Overview
PVSS an industrial tool for slow control
Automation Technologies SCADA SENSORS HMI
SCADA & Monitoring Developments for Vacuum
FCT and CERN Portuguese Trainee Programme Report
IT-CO Activities Controls Review.
SCADA Application Service updates in TS1
Supervision Miniworkshop JCOP Workshop 2015
An assessment framework for Intrusion Prevention System (IPS)
PVSS Evolution in Relation to Databases
ATLAS MDT HV – LV Detector Control System (DCS)
Introduction This seminar is intended to give people an overall view of the capabilities of the Scientific Programme Management System (SPMS), to explain.
The Client/Server Database Environment
CMS Operational Experience
JCOP Review Closeout March 13, 2003 Chip Watson, Robin Lauckner,
by Prasad Mane (05IT6012) School of Information Technology
Cover page.
s2Innovation – From Science to Innovation
The Obermeier Software SNMP OPC Server 3.0
Overview of Basic 3D Experience (Enovia V6) Concepts
Tools for the Automation of large distributed control systems
MTENDER DIGITAL PROCUREMENT - MOLDOVA
Presentation transcript:

SCADA Selection and Usage at CERN PVSS Users’ Meeting 5th & 6th April 2005

Overview Why did we look at SCADA? What was the evaluation process? What were the selection criteria? What are the important features of PVSS for CERN? What is the current status and usage of PVSS at CERN?

Why look at SCADA Systems? History: Experiment Control Systems were developed in-house Often many independent developments – integration issues Significant in-house resources and long-term maintenance issues Motivation: New generation of experiments (LHC) Reducing resources at CERN CERN directive to outsource wherever possible in order to concentrate on core activities Desire for common solutions wherever possible (especially between the four LHC experiments – JCOP) Limited, but, positive experience with SCADA systems at CERN Goals: Understand what is available Understand the future evolutionary trends Evaluate whether technically suitable Evaluate whether financially affordable

Selection of PVSS II Evaluation for LHC experiments started in 1997 and finished in 1999 (>10 man-years effort) Survey of market First evaluation based on technical documentation and discussions More detailed hands-on evaluation LHC Experiment Acceptance of SCADA (?) JCOP Workshop I June 1998 first presentation of SCADA technology JCOP Workshop II September 1999 presentation of results of evaluation PVSS II was selected after this extensive evaluation of multiple SCADA products and a full CERN tender (2000) CERN-specific criteria (see next slide) Contract negotiated with ETM and signed in November 2000 Unlimited licenses for the LHC experiments both at CERN and external institutes world wide Advantageous financial conditions In June 2002 extended to CERN-wide agreement Excellent collaboration with ETM

SCADA Selection for the LHC Experiments (I) 168 Criteria in a number of categories Concentrated only on non-standard features Architecture Event driven Device oriented Openness Access to all internal data via an API Database access Hardware access OPC CERN Selected PLC CERN Selected Field Buses Scalability Static 1M I/O Large no. of alarms and archive data Large no. of stations Dynamic Ability to increasingly add to the system No limitations No. of stations Naming ... Long term relationship - LHC lifetime > 10 years

SCADA Selection for the LHC Experiments (II) Flexibility Customisation Easy integration of user functionality CERN supported OSs WNT, W2000 Linux RedHat Inter-operability Functionality Scripting Array handling Advanced HMI (dynamic) Sophisticated alarm handling Administration of the SCADA Development Multi-user teams Distributed teams Configuration capabilities Large number of devices Not SCADA specialists Compatibility with other systems Operational concept Integrated Stand-alone Þ partitioning Central and remote Non-professional operators Multiple simultaneous distributed operators

Important Features of PVSS Openness Linux and Windows API / Driver development kit OPC, DDE, ActiveX ADO I/F (ODBC and OLE DB compliant DBs) Oracle archiving ASCII manager ASCII graphics format (XML) Inclusion of compiled function or launch an application from a script Web and Information Server Architecture Device structuring Event driven Internal data stored in DPs PVSS ‘tools’ are standard PVSS panels with associated scripts Flexibility Everything modifiable on-line Control of PVSS tools via DPs Powerful scripting (~Ansi C) Dynamic arrays and sets Scalability Unlimited number of variables Scattered PVSS systems Distributed PVSS systems (up to 255) Configuration Possibility to use PVSS to configure itself Perceived possibility of partnership with company

Evolution of PVSS Regular meetings with ETM Outcome: Improved distributed systems Improved performance and robustness New AES DP Groups Recipes Mass configuration Support for Linux Red Hat Oracle archiving (ModBus and S7 drivers) User’s Manual Many other improvements in trending, OPC, scripting,… Others planned, e.g. secure messaging, alarm reduction, DNS, ….

Usage of PVSS at CERN For LHC Experiments’ Control Systems ~2000 licenses generated by CERN (many are renewals) ~100 institutes in 26 countries JCOP Framework being developed – see later presentation Other CERN Users: LHC Cryogenics Systems (UNICOS Framework) – see later presentation: Surface Tunnel Experiment magnets LHC and SPS Vacuum Systems LHC Quench Protection System (QPS) – based on UNICOS LHC Power Converter Interlock System (PIC) – based on UNICOS LHC Experiment Detector Safety System (DSS) – based on data driven approach allowing a unique system to be used for 4 different applications LHC Experiment Gas Control Systems (GCS) – based on model driven approach allowing 22 similar but different systems to be developed in an automated fashion (also using UNICOS Framework) Fixed Target Experiments – based on JCOP Framework NA60, HARP, COMPASS

DSS – Giulio Morpurgo

GCS – Stefan Haider/Geraldine Thomas

SPS and LHC Transfer Lines - Vacuum Control System Synoptic of the SPS Complex Pressure profile in LHC TI8 Vacuum layout of LHC TI8 Vacuum sectorisation of LHC TI8 Isabelle Laugier AT-VAC/IN Section

CMS – Robert Gomez-Reino Garrido

Conclusions PVSS selected for the LHC experiments after an extensive evaluation (> 10 man-years) PVSS is now the recommended SCADA product CERN-wide PVSS is used extensively within the LHC experiments and increasingly in other domains CERN is keen to continue the long-term partnership with ETM and believes this has been beneficial for both partners CERN is interested in potential collaboration with other PVSS Users – PVSS Users’ Group