SPS Crab Cavity Test Stand: Safety review summary

Slides:



Advertisements
Similar presentations
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Advertisements

Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TE-CRG Activities D. Delikaris, TE-CRG.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Logo area Compliance with CERN Safety Rules – Role of CERN Health, Safety & Environment protection (HSE) Unit C. Arregui, S. Marsh (HSE-SEE) International.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. HL-LHC.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
LIU / HL-LHC Cost and Schedule Review
Crab Cavity Technical Coordination meeting:
East Area Renovation Project Team meeting # 2 – EDMS News
Crab cavities Cryogenics progress for the SPS
Plans towards CC in the LHC a US – centric perspective
HL-LHC IT STRING and Series test of SC link
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Strategy for conformity of non-standard cryogenic equipment
CRG - TM Special OdH Introduction
Equipment simplified model SMR UR safety
BA6 – crab cavity activities in EYETS
Safety Documentation EHN1
CRG-TM: LS1 projects review
Safety in Construction and Upgrade Phases
HEL – Safety aspects Christelle Gaignant
SPS cryogenic proximity equipment and SM18 validation
BE-ICS activities for LIU Project
Quality Assurance applied to Accelerator Safety
Hollow e- lens, Cryogenic aspects
Accelerator and Experiment Interface Session: LS2, LS3
SPS CC: Final plan for interlocking of crab cavities in SPS
Cryogenic Risk Assessment in LHC
Overview & baseline of LS2 and roadmap for CRG
ESS RF Development at Uppsala University
EP Experiments safety validation process Safety Permits
UK RFD Pre-Series cryomodule
Thomas Otto, TE Department, CERN
HL-LHC Safety Assessment Process
TS2 PSS Architecture, Concepts of Operations and Interfaces
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Access Control for CERN Experimental Areas
Safety in the East Area Renovation Project
Presentation transcript:

SPS Crab Cavity Test Stand: Safety review summary International Review of the Crab Cavity Performance for HiLumi – 3rd-5th April 2017 Christelle Gaignant HL-LHC Deputy Project Safety Officer

Hazards and Risks: Identification process Areas of focus Safety review Content Hazards and Risks: Identification process Areas of focus Safety review Motivations Scope Conclusions and recommendations Follow-up Lessons learnt Christelle Gaignant

Hazards and Risks: Identification Process A team of experts and stakeholders gathered all along the year 2016 Composed of: WP representatives, CERN equipment groups, Safety Officers, HSE unit Representing ~15 participants Meeting monthly over 1 year Objectives List hazards Identify areas to focus on Propose risk control measures Christelle Gaignant

Areas of focus: Cryogenic and mechanical aspects 2 cryogens (LHe, LN2) with different behaviors in different locations The cryomodule (CM) is a pressure vessel The table is a moving object supporting the CM, cryo connections and RF power cables Accidental cryogen release underground and related ODH risk identified New source of risk in the SPS! Christelle Gaignant

Areas of focus: Radiations from the cavities EIS: Element Important for Safety Ensure protection of personnel against beam hazards (EIS-beam) and hazards due to the operation of accelerators (EIS-machine) Ex.: beam stoppers, RF equipment, … More information on EDMS 1211886 New objects and Few data available Concurrent RF powering and access underground excluded New EIS-machine in the SPS! Christelle Gaignant

Safety review: Motivations SPS is an operating machine for physics, not a test facility. SPS deliver beam to different users: the North Area (˜10 beam lines), AWAKE, HiRadMat, the LHC. The crab-cavities test stand generate (new) hazards. It is paramount to get reassurance that imported risks are reduced to an acceptable level and that the Test Stand is compatible with SPS operations and access. Christelle Gaignant

Safety review: Organisation 9-10 November 2016 CERN https://indico.cern.ch/event/573824/timetable/#20161109 Safety review supported by the A&T Sector Management Chaired by the SPS CSAP chairperson, composed of 7 reviewers > 30 invited CSAP: Complex Safety Advisory Panel Each CSAP shall advise the Complex Manager and the relevant Complex executive committee on the safe operation of the Complex concerned with the aim that implementation measures and operational procedures are consistent at Complex level.… More information on EDMS 1403719 Christelle Gaignant

Safety review: scope (wrt time) Scope: Commissioning, operations and maintenance of the crab-cavity SPS test stand Until LS2, i.e. 1srt cryomodule with DQW cavities Outside of scope: Installation (standard CERN procedures for works during stops) Fabrication (under departmental responsibility) Schedule extracted from R. Calaga’s talk Christelle Gaignant

Safety review: scope (wrt locations) SPS Surface building (BA6) Shaft Underground areas: alcove, access tunnel, LSS6 Courtesy: Giovanna Vandoni Christelle Gaignant

Safety review: scope (wrt systems) SPS Test Stand SPS Machine RF and powering Cryomodule Cryogenic distribution Table Access Safety System ODH detectors and flashing lights Evacuation Procedures, Information and Training Christelle Gaignant

Safety review: conclusions The review accepted the risk control measures proposed by the WP (design, interlocks, procedures, …) No show-stoppers, the WP can go forward All recommendations are on EDMS 1706929. The reviewers “were also positively impressed by amount of work and thinking that went into safety aspects of the crab cavity project.” Christelle Gaignant

Safety review: main conclusions (1/3) Provide a noise assessment SPS Surface building (BA6) For LSS6 see next slides Provide a more complete analysis of the LN2 hazard Underground areas: alcove Christelle Gaignant

Safety review: main conclusions (2/3) Underground areas: LSS6 Interlock RF powering with SPS access safety system - Pressure test derogation acknowledged - The system as a whole (CM + service box) must be tested in SM18 (pressure tests at 300K, and first cool down) before going to the tunnel. The schedule is very tight but it should not influence on the safety clearance. Christelle Gaignant

Safety review: main conclusions (3/3) Underground areas: LSS6 - Produce a risk assessment for the cryo-module - Provide a quantitative analysis of the He MCI. - Optimize ODH detectors and flashing lights layout based on a He spill map - Foresee cryo lock-out for interventions, and no exceptional transport when the CC are cold. Christelle Gaignant

Safety review: follow-up Cryomodule Pressure tests and first cool down in SM18 => included into the current planning Produce a risk assessment for the cryo-module => On-going Cryogenics Provide a noise assessment => On-going Provide a more complete analysis of the LN2 hazard => On-going Provide a quantitative analysis of the He MCI => On-going Optimize ODH detectors and flashing lights layout based on a He spill map => Layout defined and checked on the field during EYETS Foresee cryo lock-out for interventions, and no exceptional transport when the CC are cold. => Operational procedures/instructions to be released before SPS restarts with CM, in spring 2018 RF powering Interlock RF powering with SPS access safety system => ECR end of 2017 Progress report at SPS CSAP before summer 2017 Christelle Gaignant

Lessons learnt along the process The Safety review helped to: Ensure that major issues had been identified Confirmed the minimum safety requirements to be met Highlighted what was not sufficiently covered Devoting time in safety assessment and reflection is worthy and fruitful Safety by design is a useful investment for efficient and cost-effective operations of our systems. Christelle Gaignant

Thank you for your attention Acknowledgements: Rama Calaga, Giovanna Vandoni, Karel Cornelis, Thomas Otto, Florence Pirotte, Malika Meddahi, José Gascon, Tomasz Ladzinski, Timo Hakulinen, Krzysztof Brodzinski, Simon Marsh, Helmut Vincke, James Ridewood, Laurent Tavian, Antonio Perin, Gunnar Lindell Christelle Gaignant

Spare slides Christelle Gaignant

Pressure vessel SPS CRYOMODULE - A PROPOSAL FOR COMPLIANCE WITH CERN SAFETY REQUIREMENT – EDMS 1494776 Summary „These cryomodules have to comply with HSE unit Safety Requirements which have been defined in document EDMS #1375354. Based on these requirements, the present document makes a proposal to: Achieve compliance with the Pressure Equipment Directive (PED) Essential Safety Requirements (ESR); Use as construction standards PED harmonized standards.“ Safety Request Form - Safety compliance of Prototype Crab Cavities Cryomodules for SPS – EDMS 1541969 „other conventional requirements for cryogenic pressure equipment, such as the hydrostatic proof test at 1.43 times the maximum allowable pressure, will be replaced by alternative methods to ensure the structural integrity of the equipment, as the traditional proof test would harm the operability of the crab cavities. The alternative methods proposed still align with the requirements of the PED and therefore, are valid.“ Christelle Gaignant

Documentation on EDMS (1/2) https://edms.cern.ch/project/CERN-0000169596 Christelle Gaignant

Documentation on EDMS (2/2) https://edms.cern.ch/project/CERN-0000096385 Christelle Gaignant