GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino.

Slides:



Advertisements
Similar presentations
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.
Advertisements

4 th March 2014GS-AIS2 IMPACT Jurgen De Jonghe Eloy Reguero Fuentes IMWG March 2014.
TDC2TCC2 Réunion de chantier In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting/
EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Everything you always wanted to know about… …CERN’s new mobile operator Peter JURCSO BE-CO-IN.
Public Outreach Application IMWG Meeting, Jan Janke, Ladislav Fialka (GS-AIS-GDI)
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.

 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland SMS CERN General Infrastructure.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
1 Presentation prepared by: Fernando B. S. Pedrosa Eloy R. Fuentes Gerald Dumont Alexandre Dorsival IMPACT EN RSSOs meeting 14/Oct/2014 EDMS id:
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Agenda Introduction et présentations Personnel + Superviseurs Organisation et Activités dans la section Piquets services / Working Hours AOB –Holiday planning.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
Radiation Protection computing tools Gérald Dumont HSE/RP.
Safety at CERN in the INB Context, J. Poole, July 2007 Safety in the INB Context and its Impact on Access John Poole AB-SU.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Survey on “Chargés de Consignation” Status Update
LHC intervention scheduling with the Work Acceptance Tool
YETS & LS2 Works EN-EL / Power distribution
Framework Schedule from EYETS 2016 to LS2
TS2 preparatory meeting
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
# 56- FIRE PREVENTION (Decision Needed)
Special LS1 day on 12 June 2012, EDMS:
LHC-TS3 Coordination meeting #3
Keeping LHC cold during LS periods Preliminary proposal
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
IMPACT Facility Administrators Session
CRG activities for EYETS 2016
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
Survey on “Chargés de Consignation” Follow-up
Short LHC-TS week 38 Confirmed by LMC on 16th August
Cryogenic Risk Assessment in LHC
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS & LS2 Works EN-EL / Power distribution
Tuesday 11th September LHCb dipole presently fault off
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
RF Contacts in LHC Beam Instrumentation
Present and Future test facilities for High-intensity Targetry CERN
EN Safety Talks Motivation and Concept
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
IMPACT YETS 2017–2018 & LS2 preparation
Radiation Working Group RADWG
Presentation transcript:

GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino

Activities created after 08 Jan 2012 Total: 1632 activities Previous totals: X-mas break: 817 activities TS3: 848 activities TS2: 950 activities TS1: 994 activities

Activities per facility / week since the 08th Jan 2012 This week

Approvals

Activities with participants > 100 #ActivityParticipantsTitleFacility LHCb access to UX85A - OperationLHCb PS STANDARD : Visites et Inspections - SécuritéPS TT2 STANDARD : Visites et Inspections - SécuritéPS PS STANDARD : Visites et Inspections - OPPS PSB STANDARD : Visites et Inspections - OPPS Booster BTVSS Point 2LHC BTVSE Point 6LHC BTVM Point 4LHC BTVST Point 8LHC BTVSI Point 8LHC BTVST Point 2LHC BTVSI Point 2LHC BTVSS Point 8LHC BTVM Point 3LHC LHCb access to UX85A - Operation - LS1LHCb TT2 STANDARD : maintenances générales instrumentationPS RF commutation switch at BPMSW.1L5LHC Head-Tail & WCM MaintenanceLHC PSB STANDARD : maintenances générales syst. de l'instrumentationPS Booster PS STANDARD : maintenances générales instrumentationPS Inspection, tournée de vérification, correctifs en UW25LHC Piquet TE-VSC P4LHC UX85 - Travaux câblage new UPSLHCb RP ALIMS-LHC SPSLHC RP ALIMS-LHC SPSLHC IMPACT STANDARD: maintenance générale syst refr. et ventilationSPS RP ALIMS LDMAD-Target RP ALIMS-LHC SPSLHC RP ALIMS LDMPS QU (CRYO UNDERGROUND) Maintenance CRYOPLANTS en CAVERNES - TS#4 2012LHC QU (CRYO UNDERGROUND) Maintenance CRYOPLANTS en CAVERNES - TS#3 2012LHC QU (CRYO UNDERGROUND) Préparation LS1 - CRYO TUNNEL - TS#4 2012LHC QU (CRYO UNDERGROUND) Préparation LS1 - CRYO TUNNEL - TS#3 2012LHC

2.3 New features Public APIs (read / write / approve) New facility Computer facilities Participant notifications – – SMS: 901 New RP fields (job code, specific job code, equipment code)

2.4 New features Visits View / browse mode Bulk approval Activity scheduler refactoring New pdf report Activity Responsible New field Individual dose alarm per intervention [uSv] Operational dosimetry: Impact -> Mirion Demo as Peter :

Integration IMPACT / DOSISERV View data exposed to DOSISERV Gather dose data from DOSISERV (v.2.5) IMPACT: IMPACT: 98765