We started last December: 32 channels prototype “Julich like” to:

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
FractalComs Exploring the limits of Fractal Electrodynamics for the future telecommunication technologies INFORMATION SOCIETY TECHNOLOGIES (IST) PROGRAMME.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
PNPI, R&D MUCH related activity ● Segmentation ● Simulation of the neutral background influence ● R&D of the detectors for MUCH ● Preparation to the beam.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
1 Jim Thomas - LBL A proposal to close the Grid Leak “it will never die” Yuri Fysiak, Jim Thomas & Gene VanBuren Eric Anderssen, Howard Wieman & Jon Wirth.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
CLAS12 Drift Chamber Prototyping
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
Concept Design for LBNF Far detector (LAr single phase)
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Date of download: 6/29/2016 Copyright © ASME. All rights reserved. From: Printing Three-Dimensional Electrical Traces in Additive Manufactured Parts for.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
FWD Meeting, Torino, June 16th, News from Cracow on the forward tracking J. Smyrski Institute of Physics UJ Tests of CARIOCA and LUMICAL preamplifiers.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
ATLAS Internal ID Service Integration
Status of the forward tracker design
Test beam straw prototype production status
News from Cracow on the forward tracking
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
S.Movchan Straw prototype beam test into the NA48 infrastructure
new straw end plug: D=10.6 mm straws support frame Levan option
ANKE/ PAX on Spin Physics
The interplay of GEM and STT
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Quality Control in Straw Production
Status of straw production straw module assembling
SHiP straw tracker prototype tests
T1 status (a selection from EDR presentations)
GRPC activity for EuDHCAL in IHEP-Protvino
Overview of the Frascati Production Facilities
Some proposals on HV circuits realization for segmented straw detector
HCAL Modules -First Ideas
Vereinfachung der CBM TRD Elektronik
Limited Streamer Tube Project Summary
Benefits & Advantages of Pogo Pins
Presentation transcript:

We started last December: 32 channels prototype “Julich like” to: Ferrara We started last December: 32 channels prototype “Julich like” to: Study assembly procedure Check for possible “automatic” operations of the final forward tracking detectors Test of single and multiple straws with Carioca 10 75 cm long straws 150-170 cm long straws Following our few months experience on both the mechanical and electrical aspects we are convinced that: We have a backup “safe solution” for the F.T.D. We should try to optimize Jülich – 7-11 september 2009

Jülich – 7-11 september 2009 Federico Evangelisti Un alternative proposal for STRAW CHAMBER MODULE Ferrara We have studied and build a mokup preliminary prototype of a straw module for the tracking stations. Module: 2x16 straws Jülich – 7-11 september 2009 Federico Evangelisti

Jülich – 7-11 september 2009 Federico Evangelisti Ferrara The GOAL of the new design is to avoid the critical components: springs, crimping HV pins and end plugs. Simultaneously simplify the construction by automatic machine. The straw module consists of two "heads”. Main head Secondary head Jülich – 7-11 september 2009 Federico Evangelisti

Jülich – 7-11 september 2009 Federico Evangelisti Ferrara printed board for straws positioning and grounding MAIN HEAD straws wire printing boards for positioning/fixing wires and RC elements cover (made of conductive material or metalized PVC) glue HV connector welding signal connectors gas IN connector Jülich – 7-11 september 2009 Federico Evangelisti

Jülich – 7-11 september 2009 Federico Evangelisti Ferrara SECONDARY HEAD printed boards for positioning/fixing wires glue straws welding wire printed board for straws positioning and grounding cover (made of conductive material or metalized PVC) Gas OUT connector Jülich – 7-11 september 2009 Federico Evangelisti

Jülich – 7-11 september 2009 Federico Evangelisti Ferrara MAIN HEAD printED board for straws positioning and grounding straws cover O-ring straws bushings/end plugs (made of conductive material or metalized PVC) wires and RC circuit printing boards The opposite head is of the same kind without: RC circuit on the printing board for fixing wires, HV connector and signal connectors. Jülich – 7-11 september 2009 Federico Evangelisti

WALL ASSEMBLY SIMULATION ( Kracow proposal ) Ferrara WALL ASSEMBLY SIMULATION ( Kracow proposal ) (from J.Smyrski presentation GSI 8.12.08) Jülich – 7-11 september 2009 Federico Evangelisti

FIRST MOCK-UP MADE IN FERRARA Jülich – 7-11 september 2009 Federico Evangelisti

Jülich – 7-11 september 2009 Federico Evangelisti Ferrara FIRST MOCK-UP MADE IN FERRARA to test the system: general mechanics and gas tightness printing board for positioning and grounding straws gas OUT straws alluminium cover gas IN Jülich – 7-11 september 2009 Federico Evangelisti

FIRST MOCK-UP MADE IN FERRARA printing board for positioning and grounding straws straws printing boards for positioning/fixing wires and RC elements gas OUT alluminium cover gas IN Jülich – 7-11 september 2009 Federico Evangelisti

FIRST MOCK-UP MADE IN FERRARA – HEAD COMPONENTS alluminium cover O-ring Printed boards for positioning/fixing wires and RC elements straw bushings printed board for positioning and grounding straws Jülich – 7-11 september 2009 Federico Evangelisti

Jülich – 7-11 september 2009 Federico Evangelisti Ferrara UNDER INVESTIGATION ASSEMBLY PROCEDURES; AUTOMATION PROCEDURE FOR THE PRODUCTION OF THE MODULES WIRE STRETCHING/OVERPRESSURE WHAT WE CAN DO NEXT GAS TIGHTNESS; SIGNAL CONNECTORS MAKE THE” JULICH LIKE”32 CH PROTTYPE WORKING Jülich – 7-11 september 2009 Federico Evangelisti

Jülich – 7-11 september 2009 Federico Evangelisti Ferrara CONCLUSIONS Jülich – 7-11 september 2009 Federico Evangelisti

Jülich – 7-11 september 2009 Federico Evangelisti Ferrara BACKUP SLIDES Module: 2x16 straws 166,5 mm depends on the kind of chamber 35 mm 65 mm Jülich – 7-11 september 2009 Federico Evangelisti