ERCOT 2009 Five-Year Transmission Plan Update

Slides:



Advertisements
Similar presentations
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Regional Planning Group Project
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
2015 RTP Update January, 2015.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
NW Transmission System Bottlenecks and Impacts of 2005 Summer Operation BPA Transmission Business Line Mike Viles January 2006.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
PRR835 – Reactive Power Capability Requirement
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
March 11, 2011 RPG Meeting Lower Rio Grande Valley (LRGV) Import.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
ERCOT PUBLIC 4/22/ RTP Inputs and Assumptions April 22, 2014.
March 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
ERCOT Independent Review
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Panhandle Renewable Energy Zone (PREZ) Study
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
CREZ Related Generation Interconnection Studies July 2008 Jeff Billo RPG meeting
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
Nodal Planning Go Live Austin, TX February 3, 2011
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Houston Import Study Update
Freeport Area Master Plan Project -
CSC DETERMINATION PROCESS
Transmission Planning in ERCOT- Overview
Barrilla Junction Area Transmission Improvements Project
ERCOT 2011 Five-Year Transmission Plan Update
Southern Cross Directives Planning Items
Warren Lasher Manager, Long-Term Planning and Policy
Review of Abnormal MCPEs
Modifications to Planning Charter
ECEN 460 Power System Operation and Control
Presentation transcript:

ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo RPG Meeting November 13, 2009

2009 Five-Year Transmission Plan: Where we’re at   2014 2013 2012 2011 2010 Conditioned Case N-X Analysis G-1 + N-X Analysis TO/ MP Input Reliability Project Backout Reliability AC Case Economic Analysis AC Case with All Upgrades = Complete = In Process = Not Started November 13, 2009 RPG Meeting

2009 Five-Year Transmission Plan Update Significant project changes since last update Changed back to addition of second Collin 345/138-kV autotransformer instead of Mustang 345-kV station and autotransformer project Upgrade required by 2013 summer peak Mustang project was dependent on Krum West-Anna 345-kV CREZ project which may not be completed by 2013 summer peak Could not economically justify lower Panhandle project to redirect McAdoo and Whirlwind wind generation to the CREZ ERCOT cost estimate ~ $66M Final Annual PC Savings = $4.4M Capital cost/ Annual PC Savings = 15 > 6 Whirlwind Spur Matador ~ Cottonwood (Pan A-D) McAdoo Miscellaneous project changes since last update based on comments from Transmission Owners See recent 5YTP POI website postings November 13, 2009 RPG Meeting

West/ North Curtailment 2009 5YTP Wind Curtailment Wind curtailment in latest economic case for each year Sum of Wind Generated GWh/ Sum of Wind Profile GWh Note: wind curtailment figures were based on a model with generic wind profiles and are not necessarily a prediction of what the actual wind curtailment will be in future years 2010 2011 2012 2013 2014 West/ North Curtailment 18.4% 17.1% 18.7% 0.66% 0.60% South Curtailment 0.02% 0.16% 0.07% 0.00% Total Curtailment 17.3% 15.8% 0.61% 0.55% November 13, 2009 RPG Meeting

Initial reliability analysis done in UPLAN which is DC 2009 5YTP AC Cases Why create an AC case? Initial reliability analysis done in UPLAN which is DC Overloads may exist when VAR flow is added Voltage analysis required UPLAN cannot run some contingencies (ie. multi-section line with load throwover) Other studies use 5YTP cases for analysis Reliability cases Start with 5YTP conditioned cases for each year Add all reliability projects Run Powerworld SCOPF to create a security constrained dispatch Add additional projects for unresolvable constraints November 13, 2009 RPG Meeting

ERCOT will use the 5YTP as demonstration of this assessment 2009 5YTP AC Cases 5YTP Voltage Analysis NERC TPL Standards require the Planning Authority (ERCOT) and Transmission Planner to (summarization): Annually perform a near term (years one through five) assessment of the transmission system that… Includes reactive power resources to ensure that adequate reactive resources are available to meet system performance and… Address any planned upgrades needed to meet the performance requirements of Category B of Table I ERCOT will use the 5YTP as demonstration of this assessment November 13, 2009 RPG Meeting

Complete feedback from TOs/ Market Participants Documentation 2009 5YTP Next Steps Finalize AC cases Complete feedback from TOs/ Market Participants Documentation Analyze 2009 5YTP successes and areas for improvement Incorporate into 2010 5YTP Please send comments to j bill o@er cot.co m (remove spaces) November 13, 2009 RPG Meeting

Questions? November 13, 2009 RPG Meeting