TIARA Kick-off meeting WP 3

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

TIARA-PP Final meeting 25 – 27 November 2013 Work package 3 Accelerator R&D infrastructures Anders Unnervik 1.
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP QUALITY MANAGEMENT PLAN Valencia, November 2006.
TIARA: Status WP4 C. Omet, GSI 1.Update on WP members 2.Tasks 3.Meetings 4.Schedule 5.Status 14/06/2012TIARA Mid Term Meeting1.
Report from WP4: Applications of Accelerators AccApplic  Accelerator Applications  Aims of WP4  Workshops so far  Future workshops  Status  Plans.
WP3: Infrastructure Web- Based Database Peter McIntosh (STFC, Daresbury Laboratory) TIARA Mid-Term Review Meeting, Madrid, th June
The Preparatory Phase Proposal a first draft to be discussed.
European design study on Neutrinofacilities - Euronu within FP7.
F. Azaiez (IPN-Orsay) The European Collaboration for Stable Ion Beams – ECOS Pushing the limits with high intensity stable beams A typical bottom up initiative.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Astroparticle Physics for Europe ASPERA -2 WP3: Knowledge and technology transfer 1. Kick-off meeting 7 July 2009, Rob van der Meer (FOM) WP 3 Knowledge.
TIARA kickoff R. Aleksan February TIARA 1.WP2 objectives 2.Deliverables 3.Who does what 4.Organization matters 5.Conclusion
1 TIARA WP5 Status Philip Burrows John Adams Institute for Accelerator Science Oxford University 1 Philip Burrows TIARA Meeting, CIEMAT 14/6/12.
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
TIARA Mid-term meeting June 2012 WP3: Accelerator R&D Infrastructures Anders Unnervik 1.
TIARA WP5 Philip Burrows John Adams Institute for Accelerator Science Oxford University Philip Burrows TIARA Kickoff Meeting, CERN, 23-24/2/11 1.
Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 I3 EURONS: a status report to NuPECC March 2005.
Aims of the Workshop  EuCARD2  WP4: Applications of Accelerators  Past workshops  Future workshops  Plans  Aims of this workshop EuCARD-2 is co-funded.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
JINR-CERN 5-years Partnership Program N.Russakovich 103-rd session of theJINR Scientific Council meeting JINR, Dubna, 21 February 2008.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
‘Toward TIARA’ Final Plan for the collaborative R&D Program WP4 Presented by Paolo Pierini 26/11/2013.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
Philip Burrows TIARA Preparation Board, CERN, 2/11/091 TIARA WP5 Philip Burrows John Adams Institute for Accelerator Science Oxford University.
Philip Burrows TIARA Preparation Board, CERN, 14/10/091 TIARA WP5 preparation status Philip Burrows John Adams Institute for Accelerator Science Oxford.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
Summary of modifications for WP3 TIARA preparation meeting; May 2010 Removed Sub-tasks:  Remove ‘Identification of Accelerator Research Areas’ (WP3.1.1.
Co-ordination & Harmonisation of Advanced e-INfrastructures WP4 : Modelling the cooperation of European e-Infrastructures with non-European ones Ludek.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
Annual Review Meeting for Cohesion Policy Funds Specific Thematic Focus 2 - Review the status and state of play of smart specialization strategy.
AMICI WP1 – Management, coordination and dissemination
Training, Communications and Outreach
TIARA TIARA website: General Information
John Adams Institute for Accelerator Science
CLIC work program and milestones
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Education & Training NA
Oct 22 Group Leaders Planning meeting
SA1 Execution Plan Status and Issues
Introduction the IT and DM Topic
TIARA Executive Office
Uppsala Commitment to ESS and FREIA Planning
KM3NeT 2.0 Kick-off meeting, Athens,
for the EURISOL Steering Committee
Role of FoE in LEAPS / PSSP
TIARA: Structuring further Accelerator R&D in Europe
Accelerator Research and Innovation for European Science and Society
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
WP 4 CERN Nov 2, 2009.
This project is co-funded by the European Union
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
ARIES WP2 Task 2.3 Coordination, support and enhancement of training activities for accelerators in Europe Meeting:2 Rutambhara Yogi (ESS)
‘Accelerator and Magnet Infrastructure for Cooperation and Innovation’
TIARA WP5 Survey Results
WP4.1: Industry Survey – Accelerator Technologies
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Olivier Napoly, coordinator CEA/Irfu
AMICI Work Package 3 „Cooperation“
AMICI WP1 – Management, coordination and dissemination
ASTRONET Coordinating strategic planning for European Astronomy
AMICI WP1 – Management, coordination and dissemination
Work Package 3 „Cooperation“
AMICI WP5 INDUSTRIALIZATION
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Umbrella ID Federated Identity for PaN facilities
IKC in operations and potentials for co-creation
Presentation transcript:

TIARA Kick-off meeting WP 3 23-24 February 2011 Anders Unnervik

Partner institutes WP3 CEA: Antoine Daël CERN:                Anders Unnervik (WP Coordinator) CNRS:                Landry Laurent (Repl. by Loïc Bordais in May 2011) CIEMAT:            Angel Ibarra DESY:                 Hans Weise GSI:                    Hans Mueller (replaced Carsten Muehle) INFN:                 Franco Cervelli PSI:                     Hans Braun (Deputy WP Coordinator) STFC:                  Peter Mcintosh Uppsala Univ.: Roger Ruber IFJ PAN:              Slawomir Wronka                Anders Unnervik

Objectives Anders Unnervik WP3 Objective   WP3 Objective The overall goal of this Work Package is to integrate and optimize the European infrastructures for accelerator R&D. The main objectives are to provide a survey of the existing accelerator R&D infrastructures and facilities, to identify synergies between existing infrastructures and to provide a costing model for their operation for comparison, to identify discrepancies between the existing infrastructures and future needs for accelerator R&D and to ensure that the needs of a broad user community of accelerator R&D infrastructures are adequately taken into account in the construction and operation of the TIARA distributed infrastructure. WP3.1 will generate a web-based database of existing, currently developed and planned accelerator infrastructures . WP3.2 will evaluate the needs of the user community, in close interaction with WP4. It will compare the outcome of WP3.1 with the current and future needs for Accelerator R&D Anders Unnervik

Objectives Anders Unnervik WP3.3 will analyse the different possible options for sharing R&D infrastructures and developing joint R&D Infrastructures with the industry. It will analyse access modes for industry to existing infrastructures in Europe and other regions WP3.4 will define a technology roadmap for the development of future accelerator components in industry WP3.5 will propose appropriate structures that can ensure the sustainability of the process described in WP3.2 and propose a common costing method for the operation, upgrade and construction of individual large infrastructures. WP3.6 will address all issues related to access of the accelerator R&D infrastructures. It will define the general access policy and modalities for accessing R&D infrastructures of TIARA. WP3.7 will investigate possible models for linking between them different levels of infrastructures and establish technical criteria and evaluation procedures for joining the TIARA distributed infrastructure and propose their implementation in TIARA Anders Unnervik

Milestone/ deliverable Planning, 24 months Milestone/ deliverable Description Date Milestone MS 8 Nomination of WPC for each ARA Jan 2011 Milestone MS 13 * Formation of study group for identification of Key issues Deliverable D 4.1* Report on key ARA and key R&D issues May 2011 Milestone MS 9 Interim Infrastructure Survey report August 2011 Deliverable D 3.1 Infrastructure Survey Report December 2011 Deliverable D 3.2 Infrastructure Web-based Database April 2012 Milestone MS 10 Presentation of the IWD to the TIARA collaborators May 2012 Milestone MS 11 Interim Infrastructure Need and Resource comparison August 2012 Milestone MS 12 Presentation of structure proposals for joining TIARA September 2012 Deliverable D 3.3 Infrastructure Need and resource comparison December 2012 Deliverable D 3.4 Infrastructure Access report * Action item from WP 4, work in close interaction with WP 3 Anders Unnervik

Progress so far  -Combined WP3/WP4 meeting held on 25 January 2011, to discuss the scope of work, including the drafting of a list of key R&D issues   - WP3 kick-off , Discussed the organization of the Infrastructure Survey (who does what,  templates, questionnaires, list of infrastructures, etc..), taking into account the sub-tasks in WP3.1: Survey of existing and planned accelerator R&D infrastructures user communities capacities operation costs, comparison of costing models establish liaison with industry Anders Unnervik

Progress so far The following approach agreed: Establish list of European accelerator infrastructures (institutes, universities, projects, collaborations, companies, etc..). Anders Unnervik

Non-exhaustive list!! Anders Unnervik Institutes Universities Projects Collaborations Industries CERN HELSINKI BERLIN PRO MICE IBA GSI VALENCIA MEDAUSTRON ILC SIEMENS DESY MADRID CLIC RI SACLAY BILBAO CTF 3 DANFYSIK INFN EINDHOVEN SLHC TTC OXFORD INSTR PSI DUNDEE FAIR EUCARD THALES ESRF ZWIERK XFEL   COCKROFT WARSAW PETRA DARESBURY KRAKOW FLASH UPGRADE RUTHERFORD FRANKFURT SPIRAL 2 DIAMOND DARMSTADT IFMIF SOLEIL DORTMUND MYRRAH BESSY/HZB MAINZ SWISSFEL KIT BONN SPARKS JUELICH HAMBURG FERMI CIEMAT ORSAY GANTRY 2 CELLS GANIL PROTON HC UPGR MAXLAB LEGNARO EURISOL ELETTRA LAUSANNE SLS KVI UPPSALA ESRF UPGRADE AARHUS LUND HIE ISOLDE FZD UCL ISIS UPGRADE JOHN ADAMS STRATHCLYDE EMMA FOM JYVÄSKYLÄ MAX 4 BELGIUM? ALICE ELBE ZFEL ALPHA X FELIX FRASCATI SUPER B Non-exhaustive list!! Anders Unnervik

Progress so far and planned actions  The following approach agreed: Establish list of European accelerator infrastructures (institutes, universities, projects, collaborations, companies, etc..). Prepare a complete set of questions and templates for the survey, enabling consolidation of coherent information. Anders Unnervik

Questions/information of interest Short introduction Already existing or planned? Unique features? Present situation/future changes/expected lifetime? Accelerator infrastructure/component test infrastructure? Exploitation level? Max capacity? Shared facility/infrastructure? Main user community. Open for external users? Contact details If available: Operation costs/budget? Investment cost? Costing model? Number of FTEs? Anders Unnervik

Progress so far and planned actions  The following approach agreed: Establish list of European accelerator infrastructures (institutes, universities, projects, collaborations, companies, etc..). Prepare a complete set of questions and templates for the survey, enabling consolidation of coherent information. Divide the list of infrastructures in geographical areas. Representatives of the institutes in the WP3 to take responsibility for their respective area. Survey to start in mid-March Anders Unnervik

Anders Unnervik