Summary of SPARC first-phase operations

Slides:



Advertisements
Similar presentations
Strecher, compressor and time structure manipulation
Advertisements

Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
Bill White Drive Laser April 16, Drive Laser Commissioning Experience Reminder of requirements on Drive Laser.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
Simulation studies of the e-beams for Renkai Li and Juhao Wu 5/20/2014 ALD Review.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
30. Nov I.Will, G. Klemz, Max Born Institute: Optical sampling system Optical sampling system for detailed measurement of the longitudinal pulse.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Low Emittance RF Gun Developments for PAL-XFEL
C. Vicario LCLS ICW SLAC Oct. 9-11, THE DRIVE LASER: EXPERIENCE AT SPARC Carlo Vicario for SPARC collaboration.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
February 17-18, 2010 R&D ERL Brian Sheehy R&D ERL Laser and laser light transport Brian Sheehy February 17-18, 2010 Laser and Laser Light Transport.
A. Cianchi LCLS Injector Commissioning Workshop SLAC October 9-11, Photoinjector Photoinjector A. Cianchi for SPARC Collaboration.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
What did we learn from TTF1 FEL? P. Castro (DESY).
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
LASER SYSTEM STATUS G.Gatti, A. Ghigo, C.Vicario, P.Musumeci, M. Petrarca, S. Cialdi, D. Filippetto REVIEW COMMITTEE 16/11/05.
Status of the SPARC laser and “dazzler” experiments
Beam Commissioning Adam Bartnik.
Status of SPARC synchronization system and possible upgrades
Diagnostic & Control Status
RF Synchronization Activity
Sara Thorin, MAX IV Laboratory
Status of the Thomson Source
Slice Parameter Measurements at the SwissFEL Injector Test Facility
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
Timing and synchronization at SPARC
OTR based measurements for ELI-NP Gamma Beam Source
DC Injector and Space Charge Simulation Status
Experimental Overview
Application of a Streak camera at PITZ
F. Villa Laboratori Nazionali di Frascati - LNF On behalf of Sparc_lab
LCLS Gun Commissioning Status & Plans David H
Injector: What is needed to improve the beam quality?
Advanced Research Electron Accelerator Laboratory
Compact linear accelerator FLUTE: status update
LASER SYSTEM STATUS G.Gatti , A. Ghigo , C.Vicario , P.Musumeci ,
High Level Physics Applications for LCLS Commissioning
Modified Beam Parameter Range
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
CLIC Feasibility Demonstration at CTF3
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Transverse coherence and polarization measurement of 131 nm coherent femtosecond pulses from a seeded FEL J. Schwenke, E. Mansten, F. Lindau, N. Cutic,
Simulations for the LCLS Photo-Injector C
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
COMB beam: TSTEP simulations up to THz station
Drive Laser Commissioning Status
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Injector Drive Laser Technical Status
Presentation transcript:

Summary of SPARC first-phase operations Daniele Filippetto on behalf of SPARC team

Outlines Layout (12/06) Laser and cathode Synhcronization Diagnostic and system commissioning Best results Conclusions

RF: Waveguide and gun conditioning successful Conditioning time~2 weeks Eacc~120MV/m Ekin=5.6MeV (e-)

High complexity system!! Laser: High complexity system!! oscillator pumps amplifiers Harmonics generator UV stretcher Pulse shaper Daily optimization is required

Sparc hall: Faraday cup ICT Beam dump Spectrometer Magnets E-meter cross

Operation days: RF and timing systems; RF conditioning Beam operation Flat pulse Beam operation Gauss pulse Installation & characterization LC mask Transfer Line install. New stretcher Normal incidence Diagnostics development Flat top studies

Layout Laser and cathode operations Synhcronization systems Diagnostic overview and system commissioning Best results Conclusions

Longitudinal pulse shaping: two stages Minimum rise time of 3 ps with the dazzler only How to increase the Steepness: simulations

Two stages pulse shaping:results With the DAZZLER and the UV stretcher allow to easily change the pulse length and the time shape During the run it was achieved rise time down to -1.4-1.5 ps 15 ps pulse Gaussian pulse 10 ps pulse 6 ps pulse

Transfer line and imaging: Circular beam at cathode (>98%) Front tilt compensation (< 200 fs) Work for different spot sizes. High energy losses: 65% Sensitive to lens position (±1 mm) Difficult to be measured Poor transverse uniformity A grating parallel to the cathode was employed to diffract the beam at 72°. A lens was used to compensate the chromatism at the image plane. 72° incidence 90° incidence Better uniformity and lower losses A mirror in vacuum is required

New laser diagnostic: FESCA 200 Sub-ps resolution streak camera has been recently installed at LNF The measured resolution is about 200 fs in the IR and 500 In the UV Flat top UV measurements A short IR pulse was used as reference in jitter corrected multiple image-acquisistion IR beam UV pulse

1nC electron bunch with 50 μJ laser energy (~6*10^13 photons @ 266nm) Quantum efficiency optimization: Laser cleaning with 10 μJ and 100 μm spot size diameter. Mean QE increased from 2.3 10^-5 to 10^-4 Improved uniformity over a 4 mm square region 1nC electron bunch with 50 μJ laser energy (~6*10^13 photons @ 266nm)

Layout Laser and cathode operations Synhcronization systems Diagnostic overview and system commissioning Best results Conclusions

Time jitter maximum acceptable values: - SPARC phase I (achieved): Synchronization: Time jitter maximum acceptable values: - SPARC phase I (achieved): ± 2ps between the Laser pulse and the Linac RF (RF gun mainly) - SPARC phase II (on the way): ± 0.5ps between the Laser pulse and the Linac RF (RF gun and RF compressor mainly) - Seeding@SPARC and next-generation experiments (under study): ± 0.1ps control of the bunch longitudinal position Synchronization strategy Laser to RF synchronization: 1-5kHz bandwith piezo-electro-optical feedback (Synchrolock) Standard laser IR oscillator time jitter measurement Innovative UV pulse single shot time arrival measurement RF to RF synchronization: Feedback loops Signal demodulation to monitor the phase of the fields in the RF structures along the machine

RF to RF synchronization Slow feedback (BW<<1Hz): Correction of the temperature drifts in the waveguides Motorized phase shifters 0.25ps RMS time jitter measured in the gun (with fast feedback off) Fast feedback (BW~1MHz): Correction performed inside a single 4µs klystron pulse Electronic phase shifters 230fs open loop time jitter 23fs closed loop time jitter

Laser to RF synchronization

10Hz final amplified pulse measurement (best result is 400fs) Agilent SSA (absolute) measurements SPARC monitor system (relative to RF) 350fs RMS 10Hz final amplified pulse measurement (best result is 400fs) New cavity filter used to reject the noise coming from high power RF structures 79.3MHz oscillator measurement (very good agreement with SSA)

Layout Laser and cathode operations Synhcronization systems Diagnostic overview and system commissioning Best results Conclusions

Diagnostic overview 60 cm: faraday cup to measure the charge at gun exit, and Cromox screen to see and center the beam; 85-200 cm: E-meter (slits cross, Yag and CCD cross); Emittance, beam envelope, beam parameters as function of trnsv. coordinates; 270 cm :aerogel + streak camera; beam length; 300-330 cm :FODO; 370 cm : dipole; 400 cm : spectrometer cross (Yag+ CCD) ; E & ΔE meas. 440 cm : ICT (beam charge) Image of streaked light from Aerogel (UCLA collaboration) T=12 ps } prepare the beam to E & ΔE meas.

Envelope automatic measure The emittance-meter moves and stops in several (15-30) positions. Several images are collected at each point, and an algorithm calculates the RMS parameters and the error bars.

Emittance automatic measure an automated emittance scan has been developed, making use of the centroids and rms calculated from envelope scan. 30 images each slit position 13 slit positions each z position (sampling the beam with σ/2 step width) 30 z positions 11700 images & ~450 motor movements each ε evolution measurement The high measurement resolution allows to precisely reconstruct not only the second moment but the entire transverse trace space distribution (x-x’ or y-y’)

Data analysis It has been the first time of direct emittance evolution measurements and experimental study of dynamical behaviour Problems: Need to know exactly the percent of charge used to calculate di emitt. (haloes estimation) Same cut for emitt. meas. at different positions High sensitivity needed to measure small fluctuations As result of collaboration between experimental & BD groups 3 independent alghoritms were developed for emittance calculations: Alg. based on single image analysis and data extrapolation; Alg. Based on trace space plot filtering; Genetic alg. fitting 8 different ellispes with same centers, maximizing the (Intensity/Area) function; All the procedures have been compared with the simulations, and they showed a Very good agreement

Examples of measurements:

Layout Laser and cathode operations Synhcronization systems Diagnostic overview and system commissioning Best results Conclusions

T= 5.6 MeV, I= 92 A, n = 1.6 m ==> B= 7x1013 A/m2 charge 0.83 nC pulse length (FWHM) 8.9 ps rise time 2.6 ps rms spot size 0.36 mm RF phase (-max) -8°

phase space - simulation and measurements

Flat-top Vs Gaussian pulse shape charge 0.74 nC pulse length (FWHM) 8.7 ps rise time 2.6 ps rms spot size 0.31 mm RF phase (-max) -8°

The double minimum experimental evidence charge 0.5 nC pulse length (FWHM) 5 ps rise time 1.5 ps rms spot size 0.45 mm RF phase (-max) +12° Emittance scan as function of B in a fixed point Isol=198 A

Energy spread evolution along the drift Demonstr. of negligible WF effect due to the bellows Isolation of longitudinal space charge eff. Study of longitudinal dynamics for different charges, RF phases and pulse lengths

Conclusions Commissioning of the system Flat top generation with UV pulses Nominal beam parameters Good agreement with simulations Phase space evolution Energy spread evolution Flat top Vs Gaussian Emittance oscillation