The First HCAL Readout Schedule! (7/22/99 UMD meeting)

Slides:



Advertisements
Similar presentations
FC7 AMC FMC carrier for CMS
Advertisements

CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Preliminary Design Review: Hub Implementation Dan Edmunds, Wade Fisher, Yuri Ermoline, Philippe Laurens Michigan State University 01-Oct-2014.
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
T. Gorski, et al., U. Wisconsin, November 08, 2011 Calorimeter Trigger Upgrade - 1 Upgrade Cal. Trigger R&D M. Bachtis, A. Belknap, M. Cepeda, S. Dasu,
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
E. Hazen - Detector Electronics1 Detector Electronics New Developments.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
26 Sept 2013E. Hazen - TWEPP / AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University Representing the work of J. Rohlf, S.X. Wu, A. Heister,
Creotech Instruments Jacek Kosiec On behalf of.
Counting Room Electronics for the PANDA MVD
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
The Data Handling Hybrid
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
HCAL DAQ Path Upgrades Current DCC Status New DCC Hardware Software
IAPP - FTK workshop – Pisa march, 2013
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
Test Boards Design for LTDB
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University
Pulsar 2b AMchip05-based Pattern Recognition Mezzanine
E. Hazen - Back-End Report
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
ALICE Trigger Upgrade CTP and LTU PRR
HCAL Data Concentrator Production Status
Task T - CMS at LHC Global Calorimeter Trigger
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
AMC13XG (XG = Ten Gigabit)
ECAL OD Electronic Workshop 7-8/04/2005
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
MicroTCA A look at different options...
DAQ Interface for uTCA E. Hazen - Boston University
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
FED Design and EMU-to-DAQ Test
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
Presentation transcript:

The First HCAL Readout Schedule! (7/22/99 UMD meeting) 26 Sept 2013 E. Hazen - TWEPP 2013

Oct 1999 26 Sept 2013 E. Hazen - TWEPP 2013

Oct 2000 26 Sept 2013 E. Hazen - TWEPP 2013

2006: RPC trigger links (oSLB) 26 Sept 2013 E. Hazen - TWEPP 2013

2007: SiPM Radiation Testing oSLB production, software 26 Sept 2013 E. Hazen - TWEPP 2013

2008: DCC1 working, spares critical 26 Sept 2013 E. Hazen - TWEPP 2013

2009: Onward to MicroTCA! 26 Sept 2013 E. Hazen - TWEPP 2013

CMS uTCA Crate (note MTCA.0 not MCTA.4) 26 Sept 2013 E. Hazen - TWEPP 2013

26 Sept 2013 E. Hazen - TWEPP 2013

The AMC13XG 26 Sept 2013 E. Hazen - TWEPP 2013

History / Versions DTC (2010, 3 built) Based on NAT-MCH Prototype all functions AMC13 (2011, 17 built) Based on new T1 New port assignments AMC13XG (2013, 15 built) Redesigned T1 (only) 10Gb/s links XC3S200A / XC6V130T XC6SLX25T / XC6VLX130T (or 240T) XC6SLX25T / XC7K325T 26 Sept 2013 E. Hazen - TWEPP 2013

AMC13XG (XG = Ten Gigabit) Quad SFP+ Optical cage AVR32 uC MMC T3 connector (JTAG, I2C) Spartan-6 FPGA Kintex-7 FPGA With heatsink DDR3 SDRAM Tongue 2 PCB Clocks T3 connector board removed to show internal detail Tongue 1 PCB GbE, Fabric A 26 Sept 2013 E. Hazen - TWEPP 2013

AMC13XG Front Panel 3x SFP+ 10Gb/s capable Functions listed LED2 (MMC Green LED) LED1 (MMC Red LED) Serial # SFP0 (DAQ Loop-back test) 3x SFP+ 10Gb/s capable Functions listed for initial HCAL firmware USB (MMC console) SFP1 (DAQ Output) JTAG (MMC AVR-32) SFP2 (Spare) SFP3 (TTC/TTS) JTAG (AMC13 FPGAs) 26 Sept 2013 E. Hazen - TWEPP 2013

Out of time! Summary: CMS adopting MTCA.0 widely “final” AMC13XG design complete built in qty 15 Larger scale production starting late 2013 Keeping an eye on MTCA.4, trying not to be explicitly incompatible 26 Sept 2013 E. Hazen - TWEPP 2013

Reserve Slides 26 Sept 2013 E. Hazen - TWEPP 2013

AMC13XG Block Diagram Kintex 7 FP Input CLK F/O 40.xx CLK To AMCs CDS TTC in TTS out Kintex 7 SFP IO IO DAQ 10 Gb/s SFP+ GTX GTX GTX GTX Fabric A 12 ports 5.0 Gb/s (10 Gb possible) GTX GTX DAQ 10 Gb/s SFP+ GTX GTX GTX GTX GTX Spare 10 G b/s SFP+ 512 Mbyte DDR3 GTX 1600MT/s (6.4 GB/s) Spartan 6 GTP IO Fabric B 80 Mb/s (TTC) May upgrade to ~ 320 Mb/s GbE GTP MCH1 MMC uC IPMI Front Panel via T3 JTAG LEDs Flash 26 Sept 2013 E. Hazen - TWEPP 2013

AMC13 Clock Paths 26 Sept 2013 E. Hazen - TWEPP 2013

AMC13 DAQ Path 26 Sept 2013 E. Hazen - TWEPP 2013

AMC to AMC13 backplane link AMC (i.e. HCAL uHTR) 12 point-to-point links AMC13 BU provided firmware 80 Mb/s TTC Protocol Fabric B TTC Receiver LHC clock L1A IO IO BC0 etc Level 1 Trigger MUX TP[0:7] BC0 5 Gb/s 8b/10b Fabric A MGT MGT CLK Level 2 DAQ 16 Data Framing Buffer Status 26 Sept 2013 E. Hazen - TWEPP 2013

Link to CDAQ 5.0 Gb/s optical link with “S-Link like” protocol Firmware developed by CDAQ (both ends) Error check coding, retransmission on error Error monitoring Full diagnostic and test capability from receive end AMC13 FEROL Data from FED -DATA (64 bit) -WEN -UCTRL -CLOCK -Backpressure -link down 4 blocks (4Kbytes each) -Receive block -Ack. block -Order blocks Logic Main SFP itf Block is sent until it is acknowledged Send commands (one at the time) Internal Receive CMD + ACk 26 Sept 2013 E. Hazen - TWEPP 2013

T1 PCB Stackup Nelco 4000SI-13 Material 1 GTL Impedance control (10G, SDRAM) Prepreg 2.7 2 GP1 GND Core 5.0 3 GP2 Split power Prepreg 5.4 4 G1 Impedance control (SDRAM) Core 5.0 Overall: 1.6mm Signal: 18μm Power: 36μm 5 GP3 Split power Prepreg 2.7 6 GP4 GND Core 5.0 7 GP5 Split power Prepreg 5.4 8 G2 Impedance control (SDRAM) Core 5.0 9 GP6 GND Prepreg 5.4 10 G3 Impedance control (10G, SDRAM) Core 5.0 11 GP7 GND Prepreg 2.7 12 GBL Impedance control (10G, SDRAM) 26 Sept 2013 E. Hazen - TWEPP 2013

Top Layer 1 (signal) HS to T2 1.8V 2.0V UTCA connector DDR3 power DDR3 Kintex-7 LS to T2 1.0V 1.2V 1.0V aux 3.3V Payload 26 Sept 2013 E. Hazen - TWEPP 2013

T2 PCB Stackup Standard FR-4 Material 1 GTL Impedance control (TTC) 5 mil dielectric 2 GP1 GND 3 mil dielectric 3 GP2 Split power 9 mil dielectric 4 G1 Inner signal Overall: 1.6mm Signal: 18μm Power: 36μm 9 mil dielectric 5 GP3 Split power 9 mil dielectric 6 G2 Inner Signal 9 mil dielectric 7 GP4 GND 5 mil dielectric 8 GBL Impedance control (TTC) 26 Sept 2013 E. Hazen - TWEPP 2013

T2 PCB Layout UTCA connector Spartan 6 FPGA Fabric B (TTC) AVR 32 (MMC) Clock fanout ICs Connector to T3 Connector from T1 26 Sept 2013 E. Hazen - TWEPP 2013

Eye Patterns on Serial Links 26 Sept 2013 E. Hazen - TWEPP 2013

Backplane Test in VT892 Crate Double-length (loop-back) test MCH2 connector AMC1 connector AMC13XG (Kintex-7 FPGA) Jumper Board GTX ~5 cm PCB (Nelco) 20 cm (est) backplane PCB Total length: 50 cm (3.3ns) NOTE: Preliminary! still tweaking parameters 5.0 Gb/s 10.0 Gb/s -0.5 Time (UI) +0.5 -0.5 Time (UI) +0.5 26 Sept 2013 E. Hazen - TWEPP 2013

10GB Fiber Loop-Back Test MCH2 connector AMC13XG (Kintex-7 FPGA) SFP Transceiver Avago AFBR-703SDZ GTX 30M Fiber ~3 cm PCB (Nelco) NOTE: Preliminary! still tweaking parameters 10.0 Gb/s 26 Sept 2013 E. Hazen - TWEPP 2013

Temperature Sensitivity of AMC13 Clock network 26 Sept 2013 E. Hazen - TWEPP 2013

TTC Clock Delay Testing 904 (E. Laird) and at BU Goal: Measure phase shift between TTC input and clock on uTCA backplane 9 July 2013 E. Hazen - HCAL Upgrade

Repeated Power Cycles B. 904 (E. Laird et al) Note: vertical scale inverted BU (D. Zou et al) 300 ps 700 s Measure TTC to custom AMC rx card 6 power cycles of whole uTCA crate Converges in O(200s) Slow drift seen but very low level, nearly unmeasurable with this setup Hypothesis: temperature effect Measure TTT to 3.5GHz diff probe on AMC card clock inputs w/ 100Ω 6 power cycles of whole uTCA crate Vary from 10 min to 8h off time 9 July 2013 E. Hazen - HCAL Upgrade

Delay vs position in AMC clock chain 2814 has no delay/phase spec! 150ps 300ps 0ps 150ps Measured phase shift vs warm-up All +/- at least 20ps These MLVDS drivers have spec'd Tempco of 10 ps/°C 9 July 2013 E. Hazen - HCAL Upgrade

Delay vs Temp @ BU Change crate temp by blocking cooling. Temp measured in air near AMC13XG Δ delay at input to MLVDS drivers Total plot range corresponds ~ to normal warm-up Delay (ps) Slope: 25.8 ps/°C Temperature (°C) 9 July 2013 E. Hazen - HCAL Upgrade

Phase shift: Conclusions Phase shift with temperature is not unexpected, and is much less than the old TTCrx The phase is stable after 200s or so warmup It is fine for HCAL ~ half of the shift is in the clock/data separator IC which is the heart of the design Improving it would require starting over on the clock path design A modest improvement could be gained by switching from uTCA-standard MLVDS to LVDS And, Mr Wu told us so from the start! 9 July 2013 E. Hazen - HCAL Upgrade

AMC13 Board Stack Base configuration has only tongues 1, 2 Base board - With optics and HS links (Fabric A) Clocks board - distributes LHC clock and controls Mezzanine connector for T3 with I2C T3 has JTAG and LEDs 26 Sept 2013 E. Hazen - TWEPP 2013