Assignment One Estimating materials from the scope of work of an historic building.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Volume: Prisms and Cylinders Lesson 10-7 p.538. Volume The volume of a three-dimensional figure is the amount that fills the figure. The volume is given.
Project Introduction Blueprinting, Architectural Lines, Term Project, Project Layout, and Cost.
Chapter 3 Measuring Excavation and Sitework
35 Estimating Building Costs Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the process.
Volume is the amount of space inside a three-dimensional (3-D) shape
Gable, Gambrel, and Shed Roofs
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
St Helens High School Building Construction
Drafting and Dimensioning the Architectural Floor Plan
Limited Companies LTD and PLC What they are and the differences between them.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
Planning Considerations in planning are: –Function or Usefulness: is it needed? –Kind of Wood: Depends on function and finish used. –Size & Proportion:
Let’s build a backyard swimming pool! Mr. Horstmeyer’s 8 th Grade Current Events Class.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
Chapter Two Measurements.
WebQuest: Building A Home 8 th Grade Math & Art Application Corinne McKenna.
THE COST OF MANUFACTURING How much does manufacturing cost?
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Chapter 13 Estimates for Remodeling Work
Residential Floor Plans
Statistical Revaluation Project Town of Cumberland, RI Effective 12/31/2007.
20 Chapter Stair Construction. 20 Chapter Stair Construction.
Scarcity and the factors of production Economics starts with idea that People cannot have everything they need or want.
Board Footage What is board footage How to Calculate it Example of calculating project costs with board footage.
Aim: How can the metric system be used to measure cubic volume? Do Now: Write the formula for area. What is the area of a square that has the following.
PLANNING CONSTRUCTION. Initiating Construction private sector – residential, industrial, commercial public sector – public works.
Math Review Basics Using Multiplication and Division.
Construction Planning and Estimating Construction Technology I Module 2 part 2.
Residential Infill Project Scale of Houses (a primer) Stakeholder Advisory Committee October 6, 2015.
Click Once to Begin JEOPARDY! Template created by Bill Arcuri. Edited & Enhanced by Stafford County Public Schools TRTs.
Drawing to Scale Tab 3 Notes Introduction to Floor Plans & Blueprints Every home is built from a unique set of plans, traditionally called blueprints.
GARAGE BUILDERS AND WHAT THEY NEED TO KNOW OUTBUILDERS.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Scarcity and the Science of Economics
Design process.
Measurements Warm - up Cover Me Power point Triangles Guided Practice
CHAPTER 2 Basic House Designs
Architectural Styles Project
Unit 6.05 and 6.06-Learning about blueprints
Principles of Architecture & Construction
Site Grading Site Grading Civil Engineering and Architecture
Construction Documents
Estimating Project Costs
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
Analyze your set of squares and describe the side lengths you found.
Remodeling and Renovating
Interior Design Designing Functional Interiors & Floor Plans
Chapter 2 Measurement.
The Cost Approach.
Factors to Keep in Mind While Installing Fences
Basement Finishing - Creative Ideas & Cost
Price strategy: Pricing Methods
Housing Styles.
10 The Cost Approach—Part I: Reproduction/Replacement Cost
House Construction Budget Plan
CTC 475 Review Inflation Inflation rate f is the rate of change in the value of currency (inflation/deflation) Inflation-free rate i represents a gain.
Week 5 Drafting and Dimensioning the Architectural Floor Plan.
Understanding Blueprints
Fundamentals of Housing
Chapter 22 Building Sections. Chapter 22 Building Sections.
MSB High Value Tool Detailed Example August
Presentation transcript:

Principles of Architecture & Construction How much is this house?

Cost Estimating Before a house is built, there is usually an estimate created for the cost of the home This is helpful in many ways, to the client who is purchasing the home and the builder who needs to plan the construction There is no exact method, that is why it is called “estimating” We will look at a few methods used in the industry

Square Foot Method This is a method of cost estimating by finding the area of a home This is usually found by multiplying the length of the house by the width Garages, porches, basements, etc. , are figured separately You would use the current square foot cost, but half of that cost for the garage and such areas Note that wall thickness is included in this method

Square Foot Example Let’s say a house is 24’ x 60’ and has a garage of 20’ x 20’ The area of living would be 1,440 sq. ft. and the garage space would be 400 sq. ft. Let’s assume a cost per square foot of $50 Then, area of living is 1,440 x 50 = $72,000 Garage, 400 x 25 = $10,000 So the estimated cost would be $82,000 Note: price does not include the land value

Cubic Foot Method This is a method of cost estimating by finding the area of a home, then multiplying by the height to find the estimated volume of home This method will find the area, but then multiply by the height The height is from the basement floor to the ceiling, including attic area Attic area is figured using half the rise Rise is measured from the ceiling to the ridge of the roof

Cubic Foot Example Again, 24’ x 60’ house, with 20’ x 20’ garage 1,440 sq. ft. living area with height of 8’ 1,440 x 8 = 11, 520 cu. ft. without attic Attic rise is 4 ft., then 1,440 x 2 = 2,800 cu. ft. 11,520 + 2,800 = 14,440 cu. ft. Assume cost per cubic foot is $5, then 14,440 x 5 = $72,200 Garage is 400 x 8 = 3,200 cu. ft., attic is 400 x 1 ½ (rise is 3 ft.) = 600 cu. ft. 3,200 + 600 = 3,800 x 2 ½ = $9,500 $72,200 + $9,500 = $81,700

More Accurate Methods The above methods are good for a rough estimate There are ways of getting a more accurate estimate These methods take additional time and may not be worth the effort in some cases Each case must be evaluated to determine what type of estimate is required

Construction Drawings Architectural drawings that layout exactly how the house should be built, also known as “CD’s” Much information can be found on the construction drawings If these are studied you can determine just about everything you would need for the home to be built These will usually include specifications for the materials and finishes

Specifications Are an explicit set of requirements to be satisfied by a material, product, or service. Also known as “specs” Usually the architect has a certain vision for a home and along with the CD’s, the specs will help to satisfy this vision Specs are written in a certain format and usually have alternative materials listed in case the first choice cannot be obtained

Materials Are things needed for doing or making something After materials are determined from the CDs and specs, they can be listed out using a certain form The cost of certain materials can vary depending on time of year, economy, location, supply, etc. This can become the most involved part of this process and the most difficult With experience you can learn the types of things to be wary of in estimating

Labor Is productive work, especially physical work done for wages Labor costs can vary depending on time of year, economy, and the type of work needed Sometimes, the home may call for a very specific type of labor; this can significantly raise the cost Truly skilled labor can be hard to find and can be expensive This is a very important factor to be considered in an accurate estimate

Permits A legal document giving official permission to do something These are usually issued by the city or county where the home is being built There are various types of permits for various types of work Permits vary greatly from city to city and county to county Most permits are fairly affordable (under $400) but depending on the type of work needed can rise in cost This is an issue that has to be researched for the area where the home is to be built

Insurance This is a promise of reimbursement in the case of loss; paid to people or companies so concerned about hazards that they have made prepayments to an entity Some builders require a certain level of insurance coverage. This can raise the cost Again, depending on the type of work, location, needs of the home, these can all raise this cost of construction

Final Costs After all these factors are considered and added up, then you can develop a more accurate estimate for the home You can see that there is a lot more work involved for this type of process There are people who are experts in this area Either method used, these are good tools to know and become familiar with in this field

Work Time! Time to apply your new found knowledge and figure out the cost of a house using one of the above mentioned methods