Test beams future plans - Discussion session-

Slides:



Advertisements
Similar presentations
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Advertisements

3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
1 The Path to the Ph.D. in IS: Part 4, The Dissertation.
CERN: important events Restart of the LHC: –First beam on 20 November at 0.45 TeV –First collisions on 23 November, followed by slowly ramping up the beam.
7/16/03LC TB Summary1 LC TB Goals and Organization Detector groups have made significant progress Individual detector groups have been working on TB efforts.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
Horst Breuker AIDA March, WP6 TA to Testbeams and Irradiation at CERN AIDA units : 600 in Testbeams; 200 in Irradiation Facility; 1 unit = 1 day;
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
Powered by Parent Questionnaire - Funzone Service 2015 Wednesday, March 11, 2015.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Scanning the irradiated ECAL modules with 137 Cs source Yu. Guz 2011/12/161.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Summary of LCTW09 Roman Pöschl LAL Orsay LCWS 2010 Beijing/China March 2010.
News, plans, wrap-up -- CLIC workshop, Febr. 5 th Lucie Linssen, CLICdp, wrap-up, February 5th Lucie Linssen.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
Report from the Steering Board Board met twice 1 representative/country + management 17 people attended (2 of which remotely) Funding remains critical.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
1. 2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances Outline: Definitions General situation Request of Calorimeter group.
What is Year 11 Mentoring all about? YR 11 Students NEED YOU.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE Collaboration Meeting May 2011 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting CERN May 2011.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
AAVS Middleware Security Group Bob Cowles CERN – September 14, 2005.
CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Casablanca/Maroc Sept
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
Vocabulary Workshop Answers Free vocabulary answers are provided for in response to the famous vocabulary book Sadlier-Oxford Vocabulary Books. It will.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay - Data Collected with the Ecal - Ecal in July running - Collected Data and Glimpse on Quality.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
CALICE Collaboration Meeting March 2012 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Shinshu March 2012.
or getting rid of the give-away particles in a test-beam environment
Revision Report 6 of the Strategic Plan
Final CALICE OsC meeting: Status and summary of project
Historic Aerospace Sites Program
Dr Simon Gardner & Dr Jonathan Brand
Bending crystals for magnetic and electric dipole moment measurements
Multi User Pilot Jobs update
Introductory remarks Felix Sefkow Collaboration Meeting
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Spokane Tribe Education Department
LC Test Beam Activities
CALICE News The 2007 beam tests have started!
Status of Ecal(s) for ILD
(My personal) CALICE Report
Report from the Technical Board
Granular calorimeters Infrastructure
Upgrade Strategy for the Experimental Vacuum Systems
nuSTORM and the Physics Beyond Colliders workshop
Maths Department Exam Information 2018
Envelope Concept report, PCS UG
Installation and Run Plan
Post CALICE thoughts Paul Dauncey 28 Apr 2004 Paul Dauncey.
Technical Board – DCAL Software
Math Kangaroo at SDMC.
Safety memo PPE - What I must remember
A, B, C’s of School Success
Math Kangaroo at SDMC.
Profound and lasting positive change must be our goal
UK MoUs and Tier-1/A experiment shares
Upcoming CALICE meetings
Presentation transcript:

Test beams future plans - Discussion session- Roman Pöschl LAL Orsay CALICE Collaboration Meeting CERN May 2011

Situation at FNAL 2011 - 2013 - Usually high availability of beam lines CALICE DHCAL and later GEMs will benefit from this - Basically no user between August 2011 and February 2012 Main boundary conditions at FNAL ~March 2012 shutdown of beam test line During 2013 re-start of test beams CALICE (European, Asian groups) should be brought into position to choose FNAL as test beam site (Funding and logistical issue) !!!! Comments on DESY - Generally high availabilty of beam time and flexible scheduling => Ideal place for testing of small units CALICE Ecal(s) will make use of it

Obsolete “CERN crisis” 2011 - Tight schedule 2011 from the beginning ~today - Tight schedule 2011 from the beginning - TAX problem in north area => no beam until earliest ~10/6/11

Dealing with crisis in 2011 - Already small beam time (w.r.t.) CALICE request will be reduced further Make sure that CALICE will not fall over the edge Main concern is currently situation in beam line H8 CALICE attitude towards upcoming SPS schedule 1) Accept proportional reduction of beam time 2) If constraints by e.g. ATLAS IBL don't allow this Make sure that there is no drawback that CALICE accepted early Running in original schedule => Ask for careful revision of non-LHC related test beams and test beam for LHC projects with smaller priority Our “homework” - Check possibilities to go to PS!!!!

Towards 2012 - Unavoidably we won't be able to complete the program at CERN envisaged for 2011 - Beam time at CERN SPS in 2012!!!! CALICE request would target at early 2012 running Running of SDHCAL and W-Hcal as major devices If possible within a common beam line Priority but no mandatory condition for accepting beam time

Beyond 2012 Ideas but no plans for > 2012 - Major objectives: Hcal tests with W absorbers Combined test beam SiW Ecal/Hcal - Current hypothesis: For major test beams only FNAL is available (modulo discovery at CERN) Most projects European and Asian based