A People’s Plan for Baltimore Transit

Slides:



Advertisements
Similar presentations
TBITE 05/15/ Heather Sobush, Senior Planner Christopher Cochran, Senior Planner
Advertisements

Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
Cellular Mass Transit (CMT) CMT4Austin.org. SOLUTION: Cellular Mass Transit Circulator Routes would converge on each Transit Center.
Beverly A. Scott, Ph.D. MBTA General Manager MassDOT Rail & Transit Administrator Richard A. Davey MassDOT Secretary and CEO GREEN LINE OVERVIEW May 2014.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Transit – Our transit services will provide modern, innovative, and viable travel options. Because transit facilities and services are an essential element.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
Write down one word that comes into your thought when you read the following word: 15 Feb 2008 R. Shanthini Transport.
Envision Central Texas Presentation Cellular Mass Transit (CMT) by Richard Shultz Concerned Citizen March 24, 2008.
Bus Rapid Transit Infrastructure Design Roadway and Junctions Bus stops Shreya Gadepalli Senior Program Director Institute for transportation and.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
“People should have transportation options.” TRANSPORTATION MOVING PEOPLE AND COMMERCE WHERE THEY WANT AND NEED TO GO.
Investing in the Extension to Lessen the Congestion And other benefits to extending the Dulles Toll Road.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.
City of Alexandria, Virginia Crystal City Potomac Yard Transitway Montgomery County Rapid Transit Steering Committee April 30,
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Prepared for the Milford Board of Selectman May 9, 2016.
2017 e -FARE SYSTEM PRESENTATION
Driving in City Traffic
Rules of the Road Chapter 4 Traffic Laws.
What’s the Combined Authority all about
A Presentation to: River to Sea TPO Board October 26, 2016.
2017 e -FARE SYSTEM PRESENTATION
APTA Sustainability and Public Transportation Workshop Benjamin Smith
Sustainable Curitiba.
Mattapan High Speed Line
Regional Roads Committee
Delivering transport and growth
Bus Rapid Transit (BRT) System: Nablus Case study
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Transportation Summit
Public transit in Indiana – the path forward November 2012
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
Problem Analysis How to Identify the Focal Problem
D Line Station Plan Overview
Cambourne to Cambridge Better Bus Journeys East of M11 Workshop Summary 13 November 2018.
Lecture 7 Thursday, September 23 Transportation.
D Line Station Plan Overview
NVCOG Regional Transportation
Land Use Planning - Goals
D Line Station Plan Overview
D Line Station Plan Overview
Focus40 Overview A long-range plan for how the MBTA can meet the needs of the region in 2040: A 20-year plan as required by MBTA enabling legislation A.
D Line and Station Plan overview
D Line Station Plan Overview
Bus Rapid Transit Study
LRT, GRT, PRT Comparison Peter Muller, PE Ingmar Andreasson, Ph. D.
Traffic Safety.
Mass Transit Usage According to IBISWorld, the public transportation industry increased 14.3%, from $63 billion during 2013 to $72 billion for 2017,
Signs, Signals, and Road Markings
City of Alexandria Virginia Transportation and Environmental Services
D Line Project Overview
I-85 Corridor Light Rail Transit Feasibility Study
M14A/D Select Bus Service
Red Line/HealthLine Extension Major
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Central Avenue Rapid Transit
Transportation Without Fossil Fuels: Can We Do It?
GoDublin! LAVTA’s TNC Partnership: From Here to Mass Transit
lesson 14.3 MANAGING SPACE IN CITY TRAFFIC
Presentation transcript:

A People’s Plan for Baltimore Transit

Crises Confronting Baltimore Transit Transit investment hasn’t focused on promoting affordable housing, driving job creation, or reducing violence Our city is paralyzed by slow bus service and lack of service expansion to those who need it The people of Baltimore never had a say in BaltimoreLink Our deteriorating, unsafe rail system desperately needs repair Divestments like Hogan’s Red Line cut must be rolled back

Why is transit in Baltimore unreliable? Traffic Congestion Boarding Delay #1. Paying the Driver #2. Dealing with Steps Intersection Delay Speed restrictions due to poor infrastructure maintenance Fleet too small Long routes Weak operational control

Why is transit in Baltimore unreliable? 2. Boarding Delay #1. Paying the Driver Passengers boarding Rt. 91 at Lexington Market, >2 minute delay #2. Dealing with Steps

Why is transit in Baltimore unsafe? Persistent rodent infestations in stations expose passengers and workers to transmittable diseases Flooding of critical safety and operational equipment in stations Faulty wiring and exposed conduits in work and public areas that can lead to electrocution Inoperable fire management systems

Our People are Physically Isolated by Unreliable, Unsafe Transit The six-line system we were promised became a one line, north-south system The Red Line, our desperately needed east-west connection, was cancelled by Gov. Hogan Our bus service and light rail are slow, infrequent, and fail to connect Baltimoreans to each other & to jobs Our Metro Subway is in dangerous disrepair BaltimoreLink is a PR plan, not an investment

Why is BaltimoreLink Not Enough? Important Severed Connections Route 19 cut Route 15 cut Route 7 Cut Blue lines are CityLink routes, green lines are LocalLink routes, and grey lines are the current bus routes Routes 11 and 27 Cut Route 20 and 30 Cut BRT Planning International, 2016

How Can We Do Better Right Now? Invest in maintenance and public sector manpower needed to bring existing rail systems to a state of good repair Invest $300 million in a true Bus Rapid Transit system, a people’s alternative to BaltimoreLink

What would true BRT in Baltimore Look Like? Dedicated right-of-way Dedicated lanes in the middle of the road avoid conflicts with turning vehicles, deliveries, bicycles Off-board fare collection Passengers buy a ticket at a vending machine. No delay paying the driver All-door boarding Passengers can enter through all doors at once and step on at-level with the bus floor Intersection treatments Transit signal priority and left turn restrictions to cars

Dedicated Right of Way What would true BRT in Baltimore Look Like? Dedicated lanes in the middle of the road avoid conflicts with turning vehicles, deliveries, bicycles Cleveland HealthLine BRT BRT Planning International, 2016

infrastructure be built? Where could BRT infrastructure be built? BRT Planning International, 2016

infrastructure be built? Where should BRT infrastructure be built? Where neighborhoods are decaying Where violence needs reducing Abandoned properties (red) And Homicides in 2013 (green) BRT Planning International, 2016

Has BRT Actually Worked Anywhere? Cleveland’s HealthLine BRT: 9.2 miles Build cost: $65 million Investment generated: $6 billion For $1 invested, $114 generated Highest ROI of any transit project in the nation 13,000 new jobs; 4,000 new residential units 7.9 million square feet in development

But Would BRT Work in Baltimore? True BRT in Baltimore: 14.35 miles Build Cost: $287 million Ridership: ~154,000 daily riders vs Cleveland’s 15,000 Baltimore BRT would perform well under FTA cost effectiveness analysis. Average old bus boarding time: 4 seconds per passenger; 110 for PWD Average new BRT boarding time: 0.3 seconds

Conclusion With true BRT infrastructure, we can improve bus frequency and eliminate the delays that leave bus riders stranded every day With dedicated funding for maintenance in our existing rail system, we can save lives and improve service quality for subway riders With investment in our existing rail system and a true BRT system, we can help: connect Baltimoreans to job centers, expand areas where affordable housing is viable, reduce unemployment & unaffordability that contribute to violence With a plan drafted by transit workers and their allies, we can replace and improve BaltimoreLink in a way that actually serves the people of Baltimore