LOCKOUT TAGOUT View established Site Lockout Tagout procedures and track LOTO execution Create or upload LOTO procedures in local language using a standardized.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Lock Out Tag Out UNIVERSITY of N ORTHERN C OLORADO.
Elements of a Lockout / Tagout Program BWC Division of Safety & Hygiene.
LOCKOUT TAGOUT REMOVING AMBIGUITY FROM CONTROL OF HAZARDOUS ENERGY PROGRAMS CONTROL OF HAZARDOUS ENERGY PROGRAMS.
Hazardous Energy Control Brady Corp. OR-OSHA
Lockout/Tagout (LOTO):
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
A successful Training Management program includes the following best practices: Assigning appropriate training based on location, job title, operation,
Isolation of Hazardous Energy Understanding the Requirement of Lockout Tagout 29 CFR
Lockout-Tagout (Control of Hazardous Energy) This training program is designed to inform management of the requirements of the Lockout-Tagout Program for.
Controlling Hazardous Energy
Control of Hazardous Energy – Lockout/Tagout 29 CFR
Lockout/Tagout Training for Authorized Employees Murray State University.
Evolution Industries Jan A Lockout/Tagout (LOTO) program ensures that energized equipment or machines are not started or used while they are being.
Lockout Tagout Tryout (LOTO). The purpose of the Lockout Tagout Program is to protect you. Rain for Rent incidents include employees being sprayed with.
Lockout/tagout Authorized employees
NWACC Business & Industry Workforce Development Institute J- 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FOR GENERAL INDUSTRY.
Lockout/ Tagout Refresher Training. Hazardous energy sources v Evaluate machines, equipment, and processes v Develop energy control plan 1a.
Trindel Insurance Fund
LOCKOUT TAGOUT (LOTO) Awareness Training Program 1 Updated 6/29/04 by SN.
Control of Hazardous Energy Lockout/Tagout 29 CFR
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Lockout/tagout (LOTO) is a technique used to prevent energy from being released during the servicing of equipment. This is accomplished by placing locks.
Lockout/Tag Out Guidelines Procedures to protect employees and co-workers.
An effective Operations Metric program includes the following best practices: Customizing metric report for site’s tracking supervisor or other identified.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
LOCKOOUT/TAGOUT b THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Lockout/tagout (LOTO) is a technique used to prevent energy from being released during the servicing of equipment. This is accomplished by placing locks.
Lock-out tag-out Procedure OSHA and site requirements.
How to Effectively & Efficiently Control
1 Lockout/Tagout “The Control of Hazardous Energy” LOTO Lockout Tagout.
Lockout Tagout Procedures Why? MoManufacturingWINs Precision Machining Technology ME 100 – Measurement, Materials & Safety.
LOCKOUT/TAGOUT AUTHORIZED EMPLOYEES. Hazardous Energy Sources + Evaluate machines, equipment, and processes + Develop energy control plan 1a.
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
29 CFR  In this course, we will cover the following:  The need for energy control procedures  Methods of lockout / tagout  Employer’s responsibilities.
Compliance Management System. Intelex System Overview Focus Modules: –Permits Management –Monitoring & Measurement –Training Management –Document Control.
LOCKOOUT/TAGOUT THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Lockout Tagout Program
Lock Out Tag Out (LOTO).
Lock Out / Tag Out The Control of Hazardous Energy
Energy is a good servant but a cruel master.
ACTION TRACKING SYSTEM
The Control of Hazardous Energy (Lockout-Tagout)
Site Task Safety Prioritization “Safety Matrix application” Guidance Document The H&S Framework requires each site to 1) create and document an inventory.
Lock Out & Tag Out.
Sources of Energy ELECTRICAL MECHANICAL PNEUMATIC FLUID AND GASES
Lockout/tagout Refresher training
Action Tracker (CF actions) Initial Injury Reports
Energy Control (Lockout/Tagout)
Energy Control Procedures Lockout/Tagout 29 CFR
CONTROL OF HAZARDOUS ENERGIES (LOCKOUT / TAGOUT)
Better to Lockout/Tagout Than to Luck Out!
Control of Hazardous Energy Lockout/Tagout 29 CFR
INDUSTRIAL HYGIENE Conduct Industrial Hygiene Risk Assessments and log, communicate and analyze IH Monitoring results Catalog & assess site projects &
Lock out / Tag out Regulations (Standards - 29 CFR)
Training Calendar (TC) Click to start the tutorial…
SAFETY OBSERVATIONS Record observations of safe or at-risk behaviors or conditions using customized data-entry forms and track feedback Standardize risk.
The Control of Hazardous Energy (Lockout-Tagout)
SAFETY RISK ASSESSMENT (JSA)
Energy Control Procedures Lockout/Tagout 29 CFR
LOTO(V) Procedures MESH Process Safety, 8.7 Energy Control
Control of Hazardous Energy
LOTO AWARENESS NOTES: 1. This symbol ▼ indicates you need to click the mouse before reading the next line or slide. 2. Statements in Italics are meant.
LOTO AWARENESS Refresher NOTES:
Lock Out Tag Out.
Lockout/tagout Refresher Training
OVERVIEW: BUILDING ENERGY PERFORMANCE- ENERGY MONITORING INFORMATION SYSTEM Integrated online platform for ECBC COMPLIANCE and BUILDING ENERGY MONITORING.
Control of Hazardous Energy
Presentation transcript:

LOCKOUT TAGOUT View established Site Lockout Tagout procedures and track LOTO execution Create or upload LOTO procedures in local language using a standardized format that meets EHS requirements (e.g. Energy Sources, Magnitudes, etc.) Establish an equipment inventory (single/multiple energy sources) of equipment requiring LOTO procedures Quickly identify locked-out equipment and track usage of LOTO procedures via a LOTO execution Log Standardize the re-approval process for annual LOTO procedure reviews What Can Lockout Tagout Do For Your Program? Easily create LOTO procedures for each piece of equipment Provide quick access to approved LOTO procedures for all users Provide real-time visibility to in-progress LOTOs with the LOTO Log Add/Update equipment & processes in batch via self-service upload template Scan equipment barcodes to quickly access corresponding LOTO procedures Explore multi-lingual options enabling users to work in local language Look up employees who are authorized to perform LOTOs using the LOTO - Training Tracker Integration Assign inspection checklists via integration with the Power Inspection Tool to ensure completion of routine equipment inspections Generate printable LOTO tag Labels that can be affixed to a standard LOTO tag

Lockout Tagout (LOTO) Create or upload LOTO procedures, include photos & attachments, and facilitate quick access to procedures via equipment barcoding View a dashboard of LOTO Procedures pending Approval or Re-Approval Track locked-out equipment using the LOTO Log feature