Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair

Slides:



Advertisements
Similar presentations
1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
Advertisements

Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Technical Conference Avoided Cost Modeling January 6, 2015.
Optimization for Operation of Power Systems with Performance Guarantee
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
HMTF Understanding PLF August 31, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
HMTF Update TAS Nov 3-4, 2015 Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Work Group - Chair.
TAS – Review Load and Hydro Shapes for use in TEPPC 2026 Common Case Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
Economic Planning Study June 23, In this presentation  Major changes from last meeting  Results: 2010, 2014, 2019  Finish analyst  Next steps.
2021 Adequacy Assessment Data Requirements Resource Adequacy Advisory Committee Technical Committee Meeting March 18, 2016.
Economic Planning Study Presentation Northwest Coal Retirement Reduction Study Results Kevin Harris February 3, 2015.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
GENESYS Redevelopment
Announcements Homework 7 is due now.
EPS Updates ColumbiaGrid Planning Meeting October 13, 2016
Erik Ela, Eamonn Lannoye, Bob Entriken, Aidan Tuohy
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
Heat Rate Calc based on CEMS Data April 12, 2016
DWG Meeting March 7, 2017 (Update to a Meeting held July 26, 2016)
Hydro Modeling Improvement for TAS Approval May 4, 2017
MWG Recommended Hydro Improvement March 7, 2017
ME 312 PPE POWER SYSTEM ANALYSIS
What is POWERBALANCE?.
Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair
Outline Background Study Assumptions Study Results To Do
Recommended Hydro Improvement April 11, 2017
Demand Response in the 7th Power Plan
Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair
ECEN 460 Power System Operation and Control
EE 369 POWER SYSTEM ANALYSIS Lecture 15 Economic Dispatch Tom Overbye and Ross Baldick 1.
MRES Resource Operations in SPP
Teaching The Duck To Fly
Keegan Moyer Interim Manager, Transmission Expansion Planning
Solar Eclipse Overview August 2017
MIT tour of the California ISO Control Center March 31, 2015
EU-IPA12/CS02 Development of the Renewable Energy Sector
Outline Modeling Issue 2017 Modeling Goals
Vetting the GENESYS Model
Additional clarifications on economic and adequacy running hours
MWG Recommended Hydro Improvement March 14, 2017
Out of Region Market Assumptions
30 Minute Reserves EPFSTF January 4,
RE Grid Integration Study with India
Market Design in New England
MWG Recommended Hydro Improvement March 7, 2017
Hydro Modeling Improvement for TAS Approval May 4, 2017
GENESYS Current Functionality
Recommended Hydro Improvement April 11, 2017
Technical Committee Meeting January 27, 2012
2021 Adequacy Assessment Status Report
Study Results Drought Scenario Study
NYS Department of Public Service
PDWG Validation of the 2028 ADS PCM V1.0
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Wholesale Electricity Costs
Ciara O’Dwyer Damian Flynn ESRI/UCD conference 17/09/2019
Presentation transcript:

Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair MWG Identified Area of Model Improvement to TAS Salt Lake City - January 30, 2017 Kevin Harris, ColumbiaGrid TEPPC\Model Work Group - Chair

Overview Hydro Operation Modeling CC as 1x1 Heat rate review Dispatch PLF to Load – Solar –Wind The use of fixed hourly shape Modeling of the Core Columbia River Hydro Dispatch to Multi Regions Modeling CC as 1x1 Heat rate review Non-Dispatchable Supply Maintenance Other Items What do we Model?

Hydro Issues

Hydro Dispatch: Load – Solar - Wind Currently: Hydro is dispatch against load Problem: Load – Solar shapes results in radical shift in daily load pattern which dispatchable Hydro is not responding to Shift CA Hydro to respond to net load (Load – Solar) Hydro supporting afternoon ramp instead of contributing to the problem Recommendation: Solar Coefficient Factor:= 1 (100%) Wind Coefficient Factor:= Northwest:=0; other area?

Hydro Dispatch: Hourly Shape Currently: Many Hydro units in California are modeled with a fixed hourly shape Problem: They are capable of shifting generation to correspond to load - solar Switch these plants from “Hourly Shape” to “Load Following” (PLF only) allows them to respond to the net Load - Solar

Hydro Dispatch: Hourly Shape Example Modeled Hydro gen (WAPA): Judge F Carr, Spring Creek, & Folsom If op flexibility still exist peaking capability by increase. Example: Shifting 8 hrs of peaking into 6 hrs results in a 33% increase in peaking capability Fixed hourly shapes peak mid-day New daily peak On average this change would support 200 MW of the afternoon ramp

Modeling Core Columbia River Currently: The Core Columbia River is modeled as PLF with some HTC Problem: HTC increase in operational flexibility by shifting generation from the morning to the afternoon ramp Recommend switch modeling of Columbia River with PLF only

Hydro Dispatch: Multi Regions Currently: Some Hydro is dispatch to multi regionals Problem: Currently procedure in GridView makes it difficult to calc the appropriate K Factor Minimize the use of this feature or iterate on solving appropriate K Factor

Modeling of Combine Cycle Currently: CC are modeled as whole plants, i.e. 2x1 Redhawk CC modeled as 482 MW Problem: Commitment is preformed by CT Switching modeling to 1x1 configuration allow additional operational flexibility in meeting California duck curve Switching modeling to 1x1 configuration allow additional operational flexibility in meeting California duck curve

Full Load Heat Rate Review Problem: Continue to find units with heat rate issues Example: Carlsbad LMS full load heat rate v1.5: 10.7 MMBtu/MWh V1.7: 6.1 MMBtu/MWh LMS Generic: 8.8 MMBtu/MWh Carlsbad min generation Min rating 20% Gas turbines cannot operate below 50-60 load and be NOx compliant Las Vegas CG 2&3 full load heat rate: 6.65 MMBtu/MWh LM6000 base CC ~ 7.9 GT/CC with 5-6 heat point blocks

Non-Dispatchable Supply

Non-Dispatchable Supply Non-Dispatchable supply is not limited to just wind and solar Other types of Non-Dispatchable supply: Geothermal, Cogeneration, Biomass, Land Fill Gas,.. Currently: These units are modeled as dispatchable supply: heat rate curve, fuel cost, dispatch range (min-max rating) Problem: This result in non-dispatchable supply responding to price signals in the whole sale electric market

Non-Dispatchable v1.5: Geysers Average annual generation (aMW) Modeled: 907 Historic 5 yr avg: 534 Diff in gen: 373 (+70%) Hourly generation profile shows a significant amount dispatchability Note: Modeled capacity is close to nameplate

Non-Dispatchable v1.7: Geysers Average annual generation (aMW) Modeled: 572 Historic 5 yr avg: 534 Diff in gen: 38 aMW (7%) Hourly generation profile does not reflect historic operation

Non-Dispatchable v1.50: Sycamore CG Average annual generation (aMW) Modeled: 277 Historic 5 yr avg: 159 Diff in gen: 118 (+74%) Hourly generation profile shows a significant amount of dump energy

Non-Dispatchable v1.70: Sycamore CG Average annual generation (aMW) Modeled: 73 Historic 5 yr avg: 159 Diff in Gen: -86 (-54%) Hourly generation profile shows a significant amount of dump energy

Non-Dispatchable Economic of non-dispatchable supply is independent of the whole sale electric market Making it dispatchable makes it difficult to control Small changes in fuel cost changes how the units dispatches

Re-evaluate Maintenance With load minus solar and wind changes when maintenance can be preformed Example: Intermountain 1 & 2 ran an avg of 0.9 units between 3/13 to 6/17 (Sched maint in fall) Given little op in spring should maint be shifted to spring? Other Issue Annual CF 39% but min fuel take ~50-70% Should fix cost be taken out of modeled coal cost? Two weeks maintenance per year?

Other Items Pancake wheeling cost Impedes exchange of power on the market Modeling of CAISO CO2 tax with asset controlled supply Explore an hourly method to implement PAR’s operation Problem: Consistently appear as a binding path in WECC analyst If PAR is properly operated the path is not binding

An efficient market vs a power market? What do we Model? An efficient market vs a power market? Do we model An efficient single owner market? A wholesale power market with 38 balance areas? Problem: We pick and choose modeling assumption independent of a clear understanding of what market we are modeling Solution: We need a clear definition of what type of market we model in the Base Case

Cycling of CC Outside of CA CC outside of CA are starting mid-day in response to duck curve Est cost of start outside of CA (SW + NW) $172M/year $471k/day Start are the difference between Max(HE 17-22) – Min(HE 12-16)

What do we Do? Do we apply constraints to minimize mid-day start of CC outside of California? Do we model an efficient market If so, what rules do we enforce and ignore in the base case? When market issues are found what do we do?

Kevin Harris (503) 943-4932 harris@columbiagrid.org

Based on 2026CC modeled loads and solar from 2026CC v1.5 Impact of CA Duct Curve ~25,000 MW of solar modeled in CA Avg daily min shifts from Off-Peak to mid-day Solar only reduces peak demand May-Sep No change to peak demand during fall/winter (Oct-Apr) Based on 2026CC modeled loads and solar from 2026CC v1.5

CAISO Duck Curve Impact on Ramp Rate Modeled CAISO load avg daily ramp rate 4,000 MW ramp in 3 hrs in 11 months 12,000 MW ramp in 7 hrs is 4 months Modeled CAISO Load–Solar avg daily ramp rate 12,000 MW ramp in 3 hrs in 11 months 18,000 MW ramp in 7 hrs in 10 months

Cycling of CC for CA Duct Curve Average daily committed start by hour by month CA: Minor mid-day dip in committed CC SW: Clear mid-day dip with afternoon spike in committed of CC

Suggested Intertie Charts Propose 3 types of charts to review flow on interties Flow duration: Determine peak flow issues Avg monthly flow: Compare modeled flow with historic flow

Suggested Intertie Charts Average hourly flow by month. Intra-day relationships are change with the CA duck curve. Understanding then this occurs and it magnitude results in improved understanding of transmission issues