National Shipbuilding Procurement Strategy Status Update

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Canadian Sport Policy Renewal April CSP Renewal Process To ensure orderly transition from the current Canadian Sport Policy to its successor.
National Fighter Procurement Secretariat Secrétariat national dapprovisionnement en chasseurs Seven-Point Plan National Fighter Procurement Secretariat.
Evaluation at NRCan: Information for Program Managers Strategic Evaluation Division Science & Policy Integration July 2012.
A 2030 framework for climate and energy policies Marten Westrup
NIMS ICS All-Hazard Position Specific Training – A Way Forward A Special Presentation for the All Hazards IMT Conference Houston, Texas November 4.
1 of 21 Information Strategy Developing an Information Strategy © FAO 2005 IMARK Investing in Information for Development Information Strategy Developing.
Solid Waste Management Coordinating Board Solid Waste Management Coordinating Board Regional/County Solid Waste Master Plan Update June 22, 2011.
1 Environmental Assessment of Trade Negotiations Government of Canada Approach WTO Public Forum September 25, 2006.
Dispute Settlement in the WTO
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
The Implementation Structure DG AGRI, October 2005
1 Consultant Contract Program Collaboration Project ACEC-Mn/DOT Annual Conference March 2, 2010.
Qualifications Update: Engineering Science Qualifications Update: Engineering Science.
Project Appraisal Module 5 Session 6.
Benefits of Construction Management
Gaining Senior Leadership Support for Continuity of Operations
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Unclassified Performance Management Process For Unclassified Administrative and Professional (Non-Teaching) Employees Summer 2011.
IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
Presentation of the proposed Annex 19 – Safety Management
Draft Change Management Strategy Framework and Toolkit An Overview TAU Workshop: Vulindlela Academy (DBSA) 12 April 2012 Presenter: Dr Patrick Sokhela.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
National Shipbuilding Procurement Strategy Secretariat Secrétariat de la stratégie nationale dapprovisionnement en matière de construction navale NATIONAL.
NATIONAL SHIPBUILDING PROCUREMENT STRATEGY STRATÉGIE NATIONALE DAPPROVISIONNEMENT EN MATIÈRE DE CONSTRUCTION NAVALE NATIONAL SHIPBUILDING PROCUREMENT STRATEGY.
Effective Contract Management Planning
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
- 1- Just enough. Just in time. Just for you March 24, 2011 Building a solid foundation: A new approach to ERP acquisition March 24, 2011 Mike Reyna Project.
1 Division of Aging and Adult Services (DAAS) Knowledge Management and Transfer Project 7/30/12.
Governance Framework for Integrated Service Delivery Improving Government Service Delivery through Single-Window Service Initiatives Sponsored by the PSSDC.
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
National Fighter Procurement Secretariat Secrétariat national dapprovisionnement en chasseurs National Fighter Procurement Secretariat Overview October.
1 MICHIGAN MUNICIPAL SERVICES AUTHORITY COLLABORATE INNOVATE SERVE Michigan Local Government Benchmarking Consortium Conference: Benchmarking for Success.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
WORLD BANK Overview of Procurement Opportunities Peter R. Easley, Esq.
PARTICIPATION AND ADOPTION OF THE COMMON CORE STANDARDS INITIATIVE 1 Transforming Education in Kentucky Felicia Cumings Smith Associate Commissioner Michael.
SAI Performance Measurement Framework
Roadmap for Sourcing Decision Review Board (DRB)
How to commence the IT Modernization Process?
Strategic Financial Management 9 February 2012
Office of Small and Medium Enterprises (OSME) Bureau des petites et moyennes entreprises (BPME) To Kickstart Innovation Canadian Innovation Commercialization.
NIMS Resource Management IS-703.A – August 2010 Visual 2.1 Unit 2: Resource Management Overview.
16+ Learning Choices data hub State of Play scotXed - 7 April 2011 Simon Marshall – Information Manager.
NDIA SoS SE Committee Topics of Interest May 25, 2009.
1 A risk-based approach to auditing procurement in English councils Mark Wardman Senior Manager Audit Commission 19 May 2014.
Colombia´s Offsets Program September 2007 Yaneth Giha Director of Planning & Budgeting.
Commissioning Development Programme Building choice of high quality support for commissioners Commissioning Support Services Tests for Business Intelligence,
National Shipbuilding Procurement Strategy Secretariat Secrétariat de la stratégie nationale d’approvisionnement en matière de construction navale 1 National.
Viewpoint Consulting – Committed to your success.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
By Saurabh Sardesai October 2014.
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Supporting and investing in Camden’s voluntary and community sector (VCS) Proposed investment and support programme.
Construction Category Management Planning Version 1.1 (May 2015)
1 Directorate of Industry Relations, Analysis and Policy (DIRAP) Paul Herring, Director “CASE FOR CANADIAN DEFENCE INDUSTRIAL POLICY” 27 February 2012.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
President , Irving Shipbuilding Inc.
Presentation to Queens University Shipbuilding Conference 4 November 2009.
National Shipbuilding Procurement Strategy Secretariat Secrétariat de la stratégie nationale d’approvisionnement en matière de construction navale 1 National.
AMC Governance and Institutional Support. Objectives Build on existing capacity Ensure appropriate independence and credibility through transparency,
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
Natalie Stirling-Sanders Procurement Sustainability Manager September 8 th, 2015 – SPE Lunch Mexico Local Content.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
IT Vendor Management March, 2015 Peter Baskette Pratike Patel.
The Role of Departments in the Implementation of the Government Agenda Concepts and Realities FMI Professional Development Day - June 7, 2016.
NSPS to Wider Industrial Policy
Øyvind E. Haga Director, Innovation Norway Canada
Presentation transcript:

National Shipbuilding Procurement Strategy Status Update October 2012

The Environment Over the next 30 years, Canada will need to renew the Royal Canadian Navy and Coast Guard fleets to ensure operations can continue in all of Canada’s waters, including the Arctic. Canadian Shipbuilding Policy states that the Government will procure, repair and refit vessels in Canada subject to operational requirements and the continued existence of a competitive domestic marketplace. Canada’s previous approach to building ships was project-by-project with no long term strategy resulting in a “boom” and “bust” cycle. 2

What is NSPS? The Strategy was developed and is being implemented to: Developing the Strategy Selecting the Shipyards Establishing the Relationship Preparing the Yards & Finalizing the Designs Constructing the Ships The Strategy was developed and is being implemented to: Recognize the strategic importance of a strong domestic shipbuilding industry Support the industry’s sustainable development through a long-term approach to federal procurement Ensure that Canada’s needs for large vessels can be met in a timely and affordable manner Seek long-term benefits over short-term fixes

Developing the Strategy Canada launched broad consultations with industry during summer 2009 to inform the strategy development Industry expressed a high level of support for the development of a long-term strategy Most respondents supported establishing a strategic relationship with two shipyards to build all large ships Culminated in June 3, 2010 announcement

Elements of NSPS Select 2 Canadian shipyards to build Canada’s large vessels, one to build Combat Vessels and the other Non-Combat Vessels Compete smaller vessels procurements amongst Canadian shipyards other than the 2 selected yards and their affiliates Repair, maintenance and refit – Business as usual; competitive procurements Cabinet approved the National Shipbuilding Procurement Strategy and the NSPS was announced by Ministers on June 3 2010 Two shipyards will be competitively selected to build 28 large vessels, valued at $33B: one to build combat vessels and the other to build non-combat vessels. Combat Vessel Work Package: Arctic/Offshore Patrol Ship (AOPS), Canadian Surface Combatant (CSC) Non-Combat Vessel Work Package: Offshore Oceanographic Science Vessel (OOSV), Offshore Fisheries Science Vessel (OFSV), Polar Icebreaker, Joint Support Ship (JSS) 116 smaller vessels, valued at $2B, will be set aside for competitive bidding by other shipyards not affiliated with the shipyards selected to build large vessels. Ship repair and refit work, valued at $500-600M per year, will be competed as per existing procurement practices What’s new about NSPS? The size, duration and potential impact of the long-term agreements and subsequent contracts make the Strategy a new and unique undertaking First time Canada has entered into a long-term relationship with shipyards First time DND and CCG requirements have been combined First time Canada has combined fleet requirements into packages being offered to shipyards 5

Selecting the Shipyard NSPS Industry Day for Canadian shipyards interested in building large ships August 2010 Issue of the Solicitation of Interest and Qualification to all Canadian shipyards September 2010 Issue of the Request for Proposals to qualified bidders Issued Feb 7, 2011, Closed July 21, 2011 Evaluation of Proposals received from the bidders Selection announced October 19, 2011 6 6 6

Successful Attributes Engagement Leadership / Governance / Decision-Making Use of Independent Third Parties 7 7 7

Engagement Extensive consultation with bidders took place on the concept, the requirements and the evaluation process and criteria The procurement process was driven by transparency and collaboration Pro-active communication throughout the procurement process 8 8

Governance No Political Involvement Deputy Ministers’ Governance Committee made key decisions in an open and transparent manner Unique dispute avoidance and issue resolution processes Used the governance structure to resolve issues No lobbyists No legal disputes or challenges of the process or the results 9 9

Use of 3rd Parties Internationally recognized experts were engaged to: Monitor Fairness Assess Capability and Performance Benchmarking Provide Expert Advice Assess Financial Proposals Third parties: Attended governance meetings to answer DM & ADM questions directly Provided written attestations that processes, actions and decisions were fair, reasonable and prudent 10

Other Attributes Simplified Solicitation of Interest & Qualification Value Proposition Umbrella Agreements Keeping the results secret until the shipyards were informed Communications 11

The New Approach to Procurement Listen to those with a stake in the process - clients and suppliers in equal measure Suppliers often have valuable ideas about how to efficiently supply the government with what it needs Adopt a governance or decision-making process that allows for real business choices to be made by both clients and procurement staff with direct input from suppliers Make sure there is a robust issue resolution process to address any concerns and manage risks in a timely manner Seek advice and input from those who are knowledgeable or expert but do not have a stake in the process

Establishing the Relationships Long-term nature of the strategic relationships demanded a strong foundation Canada and the two selected shipyards signed Umbrella Agreements in February 2012 The Umbrella Agreements are long-term strategic sourcing agreements that contain the framework for business and relationship management The UA is a long-term strategic sourcing agreement that contains the framework for business and relationship management, such as: Value Proposition commitments and obligations to be fulfilled, and consequences of shortfalls Productivity improvement monitored through periodic benchmarking Conditions precedent to the award of ensuing contracts Pre-agreed commercial terms for the ensuing contracts Negotiation rules and processes to jointly mitigate risks and reduce costs under an open-book environment Expeditious issues resolution process

Preparing the Yards & Finalizing the Designs In order to build the ships efficiently the yards need to modernize their infrastructure An independent 3rd party expert has defined the required Target State and will assess the shipyard’s progress in attaining it Infrastructure upgrades are being done at no cost to Canada Initial ships in both Combat and Non-Combat packages have designs that must be finalized for production of the vessels Shipyards need to review and finalize designs Consultations with shipyards have lead to the decision to proceed on a “Design then Build” approach No design work done yet for Canadian Surface Combatants

A Phased Approach to Shipbuilding Contracts Contracting with shipyards to build ships will generally take place in three phases: Ancillary contracts – understand the requirement and the initial design Production / Construction Engineering contracts – mature the design so it is ready to be built Construction contracts to build the ships The establishment of the timelines for the phases is part of the negotiations with the shipyards The phased approach provides less risk and will improve the efficiency of the shipbuilding process Procurement strategy for the design, development and integration of the Canadian Surface Combatant will be determined following industry engagement

Benefits of “Design then Build” Collaborative/Iterative understanding of requirements Furthering ship Design to Production Level Drawings before Construction Contract Design/Cost Tradeoffs before Construction Contract Simulation & Modeling to attain cost fidelity before Construction Contract Risk mitigation & appropriate risk sharing

Ship Construction Contracts These contracts will be: Negotiated in accordance with the rules established in the Umbrella Agreements Subject to separate Government approval Used by the shipyard to deliver the value proposition commitments and capability improvement commitments of the Umbrella Agreements Current plans show construction of first Non-Combat ship (Offshore Fisheries Science Vessels) beginning in 2013 and the first Combat ship (Arctic/Offshore Patrol Vessels) beginning in 2015

Opportunities for Broader Marine Industry Combat Systems Auxiliaries Outfit and Furnishing Hull Propulsion and Electrical Warship construction provides work to a broad spectrum of the marine industry, much of it high tech Shipyards need to bring along partners / suppliers to increase the Canadian participation in projects Equipment represents a significant portion of the ship construction cost, thus suppliers will play an important role Components sourced offshore will be matched dollar for dollar by IRBs 18

Current Status Summary Shipyards have: Hired senior staff including engineers, managers and production specialists Progressed with their plans to improve their physical facilities Canada has: Been actively maturing its ship requirements Reviewing its processes to ensure momentum is maintained Been in continuous communications with the shipyards on the way ahead Hosted supplier engagement events across the country to introduce companies to the shipyards The Broader Marine Industry is Participating in supplier engagement events Preparing for supplier and sub-contracting opportunities

Continuing Industry Engagement Canada continues to recognize the value of early engagement with industry before decisions are made Upcoming industry engagements this fall will include: Canadian Surface Combatants Strategy for warship design, development and integration In Service Support for AOPS & JSS Small Ship requirement – DND Large Tugs

Conclusion We are 1 year into a 30 year program Much has been accomplished The shipbuilding process is complex Need to get designs and production details right BEFORE cutting steel Need to work with shipyards to ensure they are ready to build ships efficiently and to avoid boom and bust We’re on track to replace Canada’s large ships