HERD Prototype Beam Test

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

The latest n-XYTER Test Results Krzysztof Kasiński (AGH Kraków) CBM Collaboration Meeting Acknowledgements: Paweł Gryboś, Robert.
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
Selection and performance of PMT candidates for TREND ground array Hou Yueyun 1, Feng Zhaoyang 1, Liu Cheng 1 , Liu Maoyuan 1 1, IHEP 2, Tibet University.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
1 Performance of multi-anode PMT employing an ultra bi-alkali photo-cathode and rugged dynodes Takahiro Toizumi Tokyo Institute of Technology S. Inagwa.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
Optimizing DHCAL single particle energy resolution Lei Xia Argonne National Laboratory 1 LCWS 2013, Tokyo, Japan November , 2013.
DHCAL - Resolution (S)DHCAL Meeting January 15, 2014 Lyon, France Burak Bilki, José Repond and Lei Xia Argonne National Laboratory.
FLC Group Test-beam Studies of the Laser-Wire Detector 13 September 2006 Maximilian Micheler Supervisor: Freddy Poirier.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
1 PoGO spring-8 BeamTest preparation Tsunefumi Mizuno and others June 2, 2003 at teleconference.
ECAL PID1 Particle identification in ECAL Yuri Kharlov, Alexander Artamonov IHEP, Protvino CBM collaboration meeting
The GEM activities at Tsinghua University Zhigang Xiao 1, Yan Huang 1, Rensheng Wang 1, Haiyan Gao 1,2 1 Department of Physics, Tsinghua University 2 Dept.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
Lecture 3-Building a Detector (cont’d) George K. Parks Space Sciences Laboratory UC Berkeley, Berkeley, CA.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
TIMING COUNTER: status report Giorgio CECCHET, PSI July 11th, 2003.
Reconstructing energy from HERD beam test data Zheng QUAN IHEP 3 rd HERD work shop Xi’an, 20 Jan
Calibration of uniformity between LYSO crystals Zhigang Wang Institute of High Energy Physics, CAS The Third International Workshop on the High.
A Prototype Diamond Detector for the Compton Polarimeter in Jefferson lab, Hall C Medium Energy Physics Group Amrendra.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Testbeam analysis Lesya Shchutska. 2 beam telescope ECAL trigger  Prototype: short bars (3×7.35×114 mm 3 ), W absorber, 21 layer, 18 X 0  Readout: Signal.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
TOP Electronics Status & Beam Test Experience Kurtis Nishimura January 16, 2012 University of Hawaii Belle II TRG/DAQ Workshop Belle II TRG/DAQ - January.
Page Detector and Electronics R&D for picosecond resolution, single photon detection and imaging J.S. MilnesPhotek Ltd T.M. ConneelyUniversity.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Introduction of my work AYAKO HIEI (AYA) Hiroshima Univ 2008/5/30 me.
 13 Readout Electronics A First Look 28-Jan-2004.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
The dynamic range extension system for the LHAASO-WCDA experiment
Rainer Stamen, Norman Gee
Prospect of SiPM application to TOF in PANDA
CEPC ScECAL Optimization for the 3th CEPC Physics Software Meeting
The Electromagnetic Calorimetry of the PANDA Detector at FAIR
gamma ray polarisation measurement
The High Dynamics Readout of PMT for BGO Calorimeter
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Marcin Chrząszcz Cracow University of Technology Itamar Levy
HERD Prototype Beam Test
Increasing the Spatial Resolution of the Tile Calorimeter
The Monitoring System of the ARGO-YBJ Data Acquisition
DAMPE Status (T9) Steadily taking data since last Thursday
F.Guber, A.Ivashkin INR, Moscow
A First Look J. Pilcher 12-Mar-2004
ScECAL+AHCAL+TCMT Combined Beam FNAL
Conceptual design of TOF and beam test results
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Vishnu V. Zutshi For the NICADD team.
Correction of saturation effect of ICCD
Design optimization of Fiber readout system
Department of Physics and Astronomy,
BESIII EMC electronics
On behalf of CEPC calorimeter working group
Time resolution in TileCal
Development of hybrid photomultiplier for Hyper-Kamiokande
Collaboration between Hall C and Hall D
Progress, ideas & plan (1)
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Readout electronics system for Laser TPC prototype
Orsay Talks Christophe : General questions and future developments.
Presentation transcript:

HERD Prototype Beam Test PMT Trigger System and Data Tianwei Bao(鲍天威) baotw@ihep.ac.cn Institute of High Energy Physics, CAS 2016.01.20

PMT Trigger System Characteristics Functions: Self-trigger generation and PS-trigger distribution Supplementary energy measurement Beam status monitor:real-time histogram and count rate Timestamp synchronization with ICCD by PPS

PMT Trigger System Characteristics Performance: Dynamic Range:69dB 4 individual channels Trigger delay:6ns DAQ :80MSPS×12bit Dead time:500ns

PMT Trigger System-Coupling of Fiber and PMT

Setup for the Beam Test Instrument Configuration:4 individual channels C24 cell->Trigger Fiber->PMT Anode C24 cell->Trigger Fiber->PMT Dynode 249 cells->Trigger Fiber->PMT Anode 249 cells->Trigger Fiber->PMT Dynode High Trigger Low

PMT Trigger System-PMT Driver and Pre-amplifier

PMT Trigger System-Hardware and Firmware

PMT Trigger System-DAQ and Monitor Software

Energy Measurement 100 GeV e-, 249 cells, PMT and ICCD histogram comparison Histogram comparison Synchronization by the trigger serial number

Energy Measurement e-, 249 cells: PMT DYNODE vs ICCD 50GeV e- 100GeV e- Matched by the same trigger serial number Linearity could be derived from the low energy part 150GeV e-

Energy Measurement e-, 249 cells: PMT ANODE vs ICCD 50GeV e- 100GeV e- Saturation observed PMT high voltage was not set properly in the beam test 150GeV e-

Energy Measurement e- C24 cell, PMT DYNODE vs ICCD Deviation is large 100GeV e- 200GeV e- Deviation is large Detection for 1 cell is not sensitive enough 150GeV e-

Energy Measurement 249 cells, preliminary calibration 249 cells Calibration by ICCD data Resolution : 5% @ 90GeV

Energy Measurement the C24 cell, preliminary calibration Deviation is very large Calibration by ICCD data

Energy Measurement Total 250 cells, preliminary calibration Merge calibrated PMT data from the 249 cells and the C24 cell Resolution is dependent on the deviation of C24

Self-Trigger Generation Delay between PS trigger and PMT self-trigger, 100 GeV e-

Summary Proved functions: Work in the future: Trigger generation and distribution Basic energy measurement Beam status monitoring Synchronization with ICCD by PPS Work in the future: Fixing the saturation issue Optimize the electronics to enlarge the dynamic range Noise reduction to detect the pion deposition

Thank you! Tianwei Bao(鲍天威) baotw@ihep.ac.cn Institute of High Energy Physics, CAS 2016.01.20

Energy Measurement 50 GeV electrons vs 50 GeV positrons 50GeV e-

Energy Measurement Total 250 cells preliminary calibration Merge calibrated data from the 249 cells and the C24 cell Resolution is not reliable for the deviation of C24