MICE CM28 Engineering Session Summary (On behalf of Wing)

Slides:



Advertisements
Similar presentations
1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.
Global Magnet Systems including Field Mapping and Infrastructure Vacuum System MICE Project Board 8 th March 2012 M Courthold – RAL R Preece – RAL P Hanlet.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Engineering Summary Agenda: Clarification of cooling channel tolerances – Tim Open issues with absorber integration – Andy/Wing.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
CM31 - Vacuum System Update Mike Courthold Matt Hills 1.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
CM28 - Vacuum System Update Matt Hills Mike Courthold 1.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
1 MICE CM27 Engineering integration Andy Nichols, STFC 9 th July, 2010.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Status of the MICE Construction Project
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Spectrometer Solenoid Fabrication Status and Schedule
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Presentation transcript:

MICE CM28 Engineering Session Summary (On behalf of Wing) Explanation of agenda chaos…. Engineering integration – Jason/Andy Progress with the EMR - Franck RF Infrastructure and engineering - Tim Vacuum discussion – Mike C Andy Nichols, STFC 7th October 2010

Schedule changes Two talks from DL engineers scheduled, electrical engineering and solenoid control open questions They couldn’t come, talks arrived too late, but are/will be uploaded Latter topic is important – Andy will try to follow up… Also fitted in a discussion about insulating vacuum strategy – Mike Courthold

Engineering integration List of inputs clearly defined: System 3D models from MICE at large 2D drawings Design data Inspection and metrology data Outputs: Top-level CAD assembly 2D interface and envelope drawings (the most important thing) Geometry information Drawing and technical data repository – long overdue! Change request and control mechanism – methodology has been proposed to MICE Technical Board Much still to do, but a good start – several engineering cultures to be brought together 3

Progress with EMR 8 EMR planes are complete, out of 48, 10 additional planes by end November, 2010 Storage of completed planes difficult, but trolley made which protects fibres Need to make sure we clarify the orientation of the 64pixel square phototube connector May need to revisit magnetic shielding calculations in light of RAL magnetic modelling error – Franck & Mike C will liaise – not clear that EMR is affected though Final EMR assembly scheduled for Mid-2011 Make sure we have importation papers understood in good time Outer box is designed, patch panel well-defined Magnetic shielding is now integral – Blondel plate

EMR Integration It’s now big and heavy…. 2.5 tonnes Will have to adapt KL trolley for clearance And make new independent frame for EMR, mounted to floor, with adjustments in X&Y But there’s a solution Useful discussions this week INFN staff will also visit Uni Geneva This is one ingredient in re-defining the 2011-2012 plan

RF Infrastructure in MICE Hall Made a good start, meeting has been scheduled to discuss mounting of first amplifier in MICE Hall CAD modelling has started, but is limited by availability of advice from RF-type staff Amplifiers are mounted behind shield wall of course Maybe possible to rotate on vertical axis by 45deg, avoids penetrating the wall Phase-shifter will be first major component to fit Need to be aware of maintenance/replacement access to amplifiers and hardware

RF Infrastructure

Vacuum discussion How to preserve insulating vacuum of all subsystems at the right level in all conditions? Some open questions: Type of pump? Continuosly pumped or valved off? What happens in quench? Uniform (minimum) size of pumping ports? Finding a gauge that works in magnetic field? Consensus is that we take a kind of ‘worst case’ in that all systems can be pumped continuously Basic layout drawing of spectrometer solenoid vacuum requirements in simple terms is done – very welcome, need to do for each system Need a drawing of manifolding, valve & pump layout in MICE Hall – Matt/Tim will start this