Martin Greimel, member of the Platform Team

Slides:



Advertisements
Similar presentations
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) SP meeting Becici, 11 November 2010.
Advertisements

The White Paper – a policy paper to contribute to the integration process of the WBC in the ERA Dr. Erika Rost, Dr. Andreas Kahle Federal Ministry of Education.
Keji Adunmo APRE – Agency for the Promotion of European Research Brussels, 29 Sept Funded by the European Commission's Directorate-General for Research.
Group 4: Tools and instruments for cooperation 1a. What are the most suitable instruments to jointly address common challenges? (e.g. joint funding, joint.
A European Strategy for Marine and Maritime Research
Analysis of research and innovation projects in the region Ivan FILUS, BIC Bratislava Joint PA7 SG and Danube-INCO.NET GA workshop Vienna,
Seventh framework programme CAPACITIES specific programme Activities of international cooperation Coordination Support Action - Grant agreement no.:
CREST OMC Working Group Internationalisation of R&D Brussels, 3rd April nd Phase of the CREST OMC Working Group “Internationalisation of S&T“ Final.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Antonia P. Recchia Ministry of Cultural Heritage and Activity Objectives of ERA-NET for coordination of European Research on Cultural Heritage 8 th EC.
SEE-ERA.NET Initiatives Pilot Joint Call for Research Proposals IGLO Open Session, Southeast European Era-Net Florian Gruber, Dissemination and.
Ingenious-science.eu ECB National Needs Analysis Workshop – Israel Charmaine Kerr ECB Project Coordination.
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme Regions of Knowledge Objectives and Activities.
BONUS FOR THE BALTIC SEA SCIENCE - NETWORK OF FUNDING AGENCIES On behalf of BONUS consortium: Andris Andrushaitis BONUS ERA-NET National Assistant Coordinator.
MULTILATERAL COOPERATION KEY PERFORMANCE AREAS SA engagement with the UN Implementation of major summits and international conventions relevant to S&T.
EUROPEAN REGIONAL DEVELOPMENT FUND RECOMMEND Final Event, 11 September 2014, Varna EU Interregional Cooperation State of play and perspectives Jason Martinez.
INCONTACT Regional Dialogue Platform(Southeast Asia) Report on the Outputs of the 2-nd Meeting 19 June, 2012, Bonn, Germany Yuriy Zaytsev National Research.
WP8 – Innovation Support Kelly Vavasi General Secretariat for Research and Technology (GSRT) 1 st Innovation Dialogue Forum Becici, 8-9 November 2010.
Danube-INCO.NET and EUREKA Elke Dall (ZSI), Ulrike Kunze (DLR), Ralf König (FFG) December 11, 2014 Joint EUREKA Danube-INCO.NET Workshop, Vienna.
1 Joint Research Centre (JRC) Annual Meeting of the EGTC Platform The EGTC-ready to use - Beyond cohesion policy Ulla Engelmann Interinstitutional and.
The Seventh Framework Programme for Research and Technological Development (FP7) supporting innovation Epp Tohver-Bulavs 07. November 2007, Tallinn.
Roland Brandenburg, FFG Implementing Joint Calls Brussels, September 2015 Introduction to the ERA-LEARN 2020 platform & manual for call implementation.
9th Meeting of the Steering Committee 1 / 26 Lisbon, 10 November 2009 Climate Impact Research (and Response) Coordination for a Larger Europe CIRCLE (2)
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
COOPERATION IN RESEARCH AND INNOVATION BETWEEN THE SOUTHERN MEDITERRANEAN AND THE EUROPEAN UNION.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
Olga Zyrina, IPPT-PAN, Poland. NCP for HORIZON 2020 & Euratom-Fission Coordinator of NCP & EURAXESS Networks in Poland Cooperation with the Enterprise.
Mindfuel at the heart of transport research Era-net inTransport How theCzech organisations may participate Mindfuel at the heart of transport research.
EGIDA PROJECT Coordinating Earth and environmental cross-disciplinary projects to promote GEOSS 24 Apr 2012 Vienna, Austria Stefano Nativi.
Netherlands Organisation for Scientific Research
JPI Connecting Climate Knowledge for Europe (JPI Climate)
Brussels, 12 October 2016 NCP_WIDE.NET
International Cooperation Science Communication
ERA-LEARN 2020: a support platform for the P2P community
Support Sustainable Research through a
International Cooperation Activities Capacities Programme
PLANNED ACTIONS – UPCOMING DUTIES
Chair, FACCE-JPI Governing Board
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
Strengthening the foundations of ERA
FP7 – Basic Info NINA BEGOVIĆ, NCP - SSH, SiS, Research Infrastructures University of Sarajevo.
Public-Public Partnership: The international dimension
International Co-operation Concrete opportunities
The BMBF Danube Region call - a pillar of the German research cooperation with Central Eastern and South Eastern European Countries Dr Matthias Hack Federal.
German-Uzbek STI Cooperation
Danube-INCO.NET Advancing Research and Innovation in the Danube Region
MAES Working Group Meeting Brussels
Project Results New Projects
14th meeting of Working Group F on Floods
Steinar Bergseth (Coordinator ERA-MBT)
Civil Protection Financial Instrument – Prevention Projects
The ERA.Net instrument Aims and benefits
CRUE – The Way Forward Vicki Jackson
AMICI WP1 – Management, coordination and dissemination
SOCIAL DIALOGUE WITHIN EUPAN
HERITAGE PLUS – Management Group Meeting
ASTRONET Coordinating strategic planning for European Astronomy
REPORTING ON DELIVERY OF EU BIODIVERSITY ACTION PLAN
Water Science-Policy Interface (CIS-SPI) Progress report
Welcome Mid-Term ERA-NET SusAn Projects Seminar
WP 1 Management and Coordination
Mika Kallio Project Coordinator, MMM (FI)
International Cooperation in Forest Research and Innovation
Our vision Knowledge creates a sustainable world
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
EaP PLUS Project highlights Supporting policy and researchers
XVII PA7 Steering Group Meeting
WP7 – Related activities
Presentation transcript:

Martin Greimel, member of the Platform Team Workshop for the Participation of Non-EU Black Sea and EaP Countries in Thematic Cofund ERANETs & JPIs The Platform of bio-economy ERA-NET Actions Martin Greimel, member of the Platform Team WS on Danube Funding Coordination Network, 31 May, Berlin

ERA-Networks were proposed as part of the ERA Concept (Lisbon strategy, 2009)

ERA-NETs provide coordination and collaboration among national and regional programmes through a step-wise approach

ERA-NET COFUND Evolvement Horizon 2020: ERA-NET Cofund Co-funding of a single joint call for trans-national proposals, in addition other joint activities including other joint calls without Union co-funding (33% rate), plus standard coordination costs (EUR 11,962.50) FP7: ERA-NET and ERA-NET Plus ERA-NET: as under FP6 ERA-NET Plus: co-funding of a single joint call for trans-national proposals, 33% reimbursement rate for the costs of funding the projects FP6: ERA-NET Funding of costs related to the coordination of national research programmes, 100% reimbursement rate for coordination and management costs

ERA-NETS in the FP7 theme Food, Agriculture and Fisheries, and Biotechnology .. Knowledge-Based Bio-Economy (KBBE)

Networking the P2P’s for impact PLATFORM of Bioeconomy ERA-NET Actions H2020 – GA No 652635 Platform of Bioeconomy ERA-NET Actions Networking the P2P’s for impact

Presentation_WP5_project_2015.03.18 Platform of Bioeconomy ERA-NET Actions PLATFORM PLATFORM2 Call topic: FP7-KBBE-2011-5 Grant Agreement No 288422 1 January 2012 – 31 December 2014 EC grant € 499,424.00 Consortium Call topic: H2020-ISIB-10-2014 Grant Agreement No 652635 1 March 2015 – 28 February 2018 EC grant € 499,593.75 Consortium 1. WUR, Netherlands 2. Ministry EL&I, Netherlands 3. FNR, Germany 4. INRA, France 5. FRB, France 6. Defra, UK 7. BBSRC, UK 8. JUELICH, Germany 9. BMWFJ, Austria 10. DASTI, Denmark 11. AU-ICROFS, Denmark 12. NICe, Norway 13. Tekes, Finland 1. WUR, Netherlands 2. Ministry EZ, Netherlands 3. JUELICH, Germany 4. FNR, Germany 5. BMLFUW, Austria 6. MIZS, Slovenia 7. AU-ICROFS, Denmark 8. IFD, Denmark 9. Mipaaf, Italy FP7 PLATFORM H2020 PLATFORM

PLATFORM is... for coordinators and participants of P2P partnerships in the bioeconomy area ... Platform of Bioeconomy ERA-NET Actions mutual learning forum joint dissemination forum strategic forum

Platform of Bioeconomy ERA-NET Actions

Platform of Bioeconomy ERA-NET Actions FP7 PLATFORM deliverables include a set of recommendations on topics such as Performance of joint calls and other impact indicators of bioeconomy ERA-NETs Managing calls efficiently and effectively in bioeconomy ERA-NETs Increasing collaborations between bioeconomy ERA-NETs for future benefits Increasing collaboration and cooperation between ERA-NETs and JPIs Getting ahead: recommendations for ERA-NETs and industry in the bioeconomy Benefiting the bioeconomy through global cooperation Fostering partnerships and national embedding for ERA-NET actions with impact

From Book to PLATFORM DB Platform of Bioeconomy ERA-NET Actions From Book to PLATFORM DB Giving information and insight BioHorizon 2nd Bioeconomy Stakeholder Workshop, 11th April 2016, Utrecht 12

PLATFORM Events Platform of Bioeconomy ERA-NET Actions Annual Events: 2015: ERA-NETs for impact and global cooperation 2016: The bigger picture: ERA-NETs for Inclusiveness and Innovation Workshop exploring views on ERA-NET; 2016, Schiphol MasterClasses: ERA-NET planning and management; June 2015, Brussels MasterClass Inclusiveness in ERA-NETs; May 2016, Vienna 2017: *Anual Event: Rome, September *Workshop Impact Assessment of Bioeconomy P2Ps *MasterClass ERA-NET cofund organisation (May)

PLATFORM Events Platform of Bioeconomy ERA-NET Actions PLATFORM World Cafe Workshop March 27th, TheGROUNDS, Schiphol Airport, Netherlands Aim: identifying challenges of existing instruments and designing and discussing improved schemes Methodology: Group work with the Lego Serious Play Outcomes: feed into Annual Event, policy brief and Questions

Master Class on Inclusiveness Date: 10/11th May 2016 Venue: Vienna, BMLFUW Participants: 15 to 20 decision makers in funding institutions, and information brokers such as NCPs, from Low Performing Countries (LPC). Invitation based on results of the T2.2 inventory and survey. Aim: Providing information on widening participation. Providing training and guidance on how to get actively involved in bioeconomy related collaboration actions.

Cooperating institutions/actions: Concept: Presentation of results from T2.2 Fostering inclusiveness (survey, analysis, support activities for engagement of LPCs) Information from other EU activities with corresponding aims: ERA-LEARN 2020, COST, MIRRIS, NCP Biohorizon, INCO Best practise examples Cooperating institutions/actions: ERA-LEARN 2020, COST, EC http://era-platform.eu/project/platform-h2020/activities/master-class-inclusiveness Task leads: Organisation Master Class : Martin Greimel, Federal Ministry of Agriculture, Forestry, Environment and Water Management, Austria Survey, analysis and support activities: Kim Turk, Ministry of Education, Science and Sport, Slovenia BioHorizon 2nd Bioeconomy Stakeholder Workshop, 11th April 2016, Utrecht 17

Reasons for not participating in ERA-NETs LACK OF NATIONAL FUNDING ADMINISTRATIVE BURDENS MISSING STRATEGIES REGARDING PPP INVOLVEMENT LACK OF A SYSTEMATIC APPROACH / UNCLEAR NATIONAL PRIORITIES / CRITERIA FOR ERA-NET PARTICIPATION LACK OF COORDINATION AMONG NATIONAL FUNDING AGENCIES INSUFFICIENT EXPERIENCE WITH ERA-NETS 652635 – PLATFORM2 – Annual Event, 6-7 October 2016, Ljubljana, Slovenia

Many more suggestion in the Report of Inclusiveness Surveys Take home messages Invite organizations to join the consortium early, not as last minute additions Formally invite new countries by targeting high level officials Proactively give new members responsibilities in WPs/Tasks Increase the number of experts from new countries involved in the ERA-NET (Strategic Advisory Board, Scientific Evaluation Board) Invite funding agencies from not-participating Countries as potential partners to observe ERA-NET activities Include inclusiveness mechanisms in Joint Transnational Calls (adjust cofund rate for new countries, quota system, use a wildcard system) Many more suggestion in the Report of Inclusiveness Surveys 652635 – PLATFORM2 – Annual Event, 6-7 October 2016, Ljubljana, Slovenia

Era-Net Sumforest Tackling the Challenges in the Implementation of Sustainable and Multifunctional Forestry through enhanced Research Coordination for Policy Decisions Project funded from the European Union’s Seventh Framework Programme under grant agreement no 606803

WP6: International Cooperation Objectives Active networking and communication with Russia and the Eastern partnership countries Definition of joint EU-Russia research priorities Implementation of a Joint EU-Russia Call for research project (WP5) Integrate the outcomes of FORESTERRA: ERA-NET on North and South Mediterranean Forest issues Tasks 6.1: Russia and Eastern partnership countries 6.2: Link to FORESTERRA

What is done Deliverable Joint EU-Russia research priorities defined Milestone number Milestone name Lead beneficiary Delivery date from Annex I MS12 First workshops with Eastern Partnership countries organised 2 12 MS13 Joint EU-Russia research priorities defined 24 Schedule of relevant Milestones Workshop in Kazan in November 2014 – done Workshop in Minsk in May 2015 – done Deliverable D6.1 Report on existing research capacities in the Russia-Eastern Partnership countries: Summary of all existing research capacities, infrastructure and programmes in the respective countries [month 12] – done D6.3 Report on EU-Russian-Eastern partnership common research priorities: Synthesis of all common research needs [month 26] – done

Further activities within Sumforest Russia and Belarus joint the Sumforest Call Belarus partner in 1 project (90.000€) Russia: ?? 2017: 2-step training for young researchers and funding managers on funding management 1st step: summer school 2nd step: Network event at the final conference Focus on younger generation Focus on research management mechanisms

Thank you for your attention! Further reading H2020 PLATFORM www.era-platform.eu H2020 ERA-LEARN: www.era-learn.eu Austrian ERA Portal: https://era.gov.at EC ERA site: http://ec.europa.eu/research/era/era-net_en.html Thank you for your attention! Martin Greimel Figuurtje met trechter is De verloren boodschapper van Jeroen Bosch Figure of the lost messenger, from Hieronymus Bosch tryiptych ‘The Temptation of St. Anthony