Summary of the project of deep processing of wheat in Kostanay

Slides:



Advertisements
Similar presentations
2014 POWER PLANT DYNAMIC BUSINESS MODEL. COMPANY’S PRODUCT 2 Innovation power plant for processing of rice husk PILOT PROJECT STARTED In stanitsa Khlomskaya.
Advertisements

 Meaning: Establishment of an industry at a particular place.  It refers to the choice of region and the selection of a particular site for setting.
SamoaFiber Bio Fuel Concepts March Introduction Technology exists and is producing low cost alternative fuels from biomass. Technology exists and.
Cement industry of Vietnam Status and Prospective (Paper for CMT’s 9th Asia Cement Markets conference) 19-20th April 2007 Hanoi, Vietnam Presented by Chairman.
STATE STOCK - JOINT COMPANYO’ZBEKYENGILSANOAT 1 TEXTILE INDUSTRY OF UZBEKISTAN: POTENTIAL TO RISE & OPPORTUNITY TO INVEST.
MBA (Trimester) Term V Module Title : Project Finance and Management
AGRO-PROCESSING LOGISTICS CENTER «ТARAZ». The purpose of the presentation Attracting of international management company with experience in the implementation.
Lakeview Energy Jim Galvin CEO Agripreneur Conference Kampala April 21 st /22 nd 2015.
BRICS & UNIDO: Technology and Innovation for SMEs Development
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
Project Planning and Capital Budgeting
Prospective of attraction of direct foreign investments in the sphere of small business and private entrepreneurship to the regions of Uzbekistan
Investment project of Ferghana plant of chemical fiber Olim F. Maksudov Director General.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Investment project of KINAP Open Joint Stock Company Mr. Refat Gafarov Deputy Director General CK.
Chemical Engineering Plant Design
Agriculture statistics in Israel in Israel Jamal Medlege Hana Tubi, MOAG CBS may 2011.
© 2012 Central Asian Tax Research Center Vladimir Tyutyuryukov Central Asian Tax Research Center 3 February 2012 Transfer Pricing Regulations in Customs.
ENERGY EFFICIENCY IN THE INDUSTRIAL SECTOR: PRACTICAL SOLUTIONS.
«Energy Saving Policies in Greece» Dr. Litos Charalampos, Technical Chamber of Greece, Prof. Ioannis Vourdoumpas Chania
The Management of Service centers NCURA REGIONS VI and VII CONFERENCE April 7, 2009.
Investment project of ONIKS Joint Stock Company Mr. Abubakir Uskenbaev Deputy Director General.
National financing tools for local environmental infrastructure Emil Savov Deputy Executive Director National Association of Municipalities in Bulgaria.
Land Promotion Opportunities. In Simple Terms Emcland partner land owners to promote their site through the planning process. We use our expertise and.
5.01 Budget Planning & Control. Budget Planning Financial planning is one tool managers use to improve profitability. Planning the financial operations.
Geothermal Heating System in the City of Bijeljina Bijeljina, City of Bijeljina City of Bijeljina Bosnia and Herzegovina.
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.
Economic Activity and Productivity
Profitability Analysis-II Chapter 8 & 9 ChEN 5253 Terry A. Ring.
TOMMOT INDUSTRIAL PARK TOMMOT INDUSTRIAL PARK PROJECT GOAL – CREATING NEW PRODUCTION CAPACITY BASED ON INTEGRATED PROCESSING OF LOCAL RAW MATERIALS.
SELIGDAR MINING AND CHEMICAL COMPLEX PROJECT GOAL The project goal is creating on the basis of the Seligdar apatite deposit of a contemporary mining.
Ministry of Economic Development of the Russian Federation Andrey Sokolov Department of projects of regional economy development Ministry of Economic Development.
Dr. Mohamed Riyazh Khan DoMS
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period.
Profitability Analysis-II Chapter 8 & 9 in T&S CH EN 5253 Terry A. Ring.
GOVERNMENT OF THE KINGDOM OF LESOTHO Water and Sewerage Company (WASCO) Greater Maseru Water Supply Feasibility Study & Preliminary Design Results of Financial.
 EVOLUTION PROJECT REPORT PROJECT PROFILE PRE INVESTMENT STUDIES TECHNO ECONOMIC FEASIBILITY STUDIES PROJECT REPORT DETAILED PROJECT REPORT.
Presented by Public Presentation March 2016 Smart International Consulting.
2013 Investment project on plywood production in Antropovo municipal district of Kostroma region.
2015 Market Research Report on Global Water and Wastewater Treatment Chemicals Industry Published: Jan 2015 Single User License: US$ 2600 Corporate User.
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
2016. Abdi Ibrahim Global Pharm LLP  Pharmaceutical plant for production of medicines in accordance with the GMP standards of the Republic of Kazakhstan.
Saving with renewable energy Presentation to North East Bioresources and Renewables January 2014.
Construction of plant for production of farm machinery and aggregates
Renewable energy support schemes in the Republic of Moldova
27-28 April 2015 Eng. Mubarak Yusuf Al-Kawari Presented by:
Materials Management Intro, Definition, Functions, Objectives, Stages, Factors responsible, Importance.
Process Economics Factors that affect profitability
Examples Example A: … Price 2 Units Costs 1,5 Total Income
Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region Kostroma, 2014.
KHLIBODAR LLC - grain processor and producer of high quality grits
SUMMARY Of project of deep processing of rice with production capacity 2700 tons / year * *resume has familiarization and approximated character, preserving.
SUMMARY Of project of deep processing of red pepper seeds to give water soluble oil with capsaicin 2700 tons capacity / year * *resume has familiarization.
Lyashkovsky community, Dnepropetrovsk Region
Costing and Project Evaluation
Profitability Analysis-II
OPEX and Profitability Analysis-II
ATTRACTIVE INVESTMENT OPPORTUNITY
PROJECT REPORT PREPARATION
Manufacturing Cost Elements 1. Cost Concepts Cost refers the amount of expenses spent to generate product or services. Cost refers expenditure that may.
The Big Three Corn Wheat Soybeans Feed Grain Export Processing
JSC «TASHGIPROGOR».
Market and non-market output
Photovoltaic Systems Engineering Application to PV Systems
Economic Activity and Productivity
Presentation transcript:

Summary of the project of deep processing of wheat in Kostanay August 2016 Нурханов Нурлан (+7701 511 50 90)

Main issues Our region is a major exporter of high-quality grain which is sold as a raw material The deep wheat processing improves economic efficiency of 5 times Requested finished products: gluten, starches, feed additives Fast return on investment 2

The favorable situation on the market The global market for starch → over 60 million tons / year. Wheat starch market → more than 4 million. Tons / year The enormous demand for dry wheat gluten in Europe. In CIS production is concentrated in the European part. There is no finished productions of gluten and modified starches from the Urals to the Far East yet. No processing in Kazakhstan. Existing enterprises - LLP "Zharkent starch and syrup factory" - 150 t / d corn. The market is developing dynamically. LLP "Verny Capital" confirmed the investment in the sector of processing corn of 100 million dollars. It is planned to restore LLP "Biochim" (biofuel plant is idle 5 years) 3

The choice of equipment supplier a preliminary analysis of the main European and Asian suppliers, in particular, Alfa Laval, GEA Westfalia Separator, Broadbent, various Chinese companies was made for purchase of equipment for the plant The choice fell on the South Korean proposal. Why? Firstly, the technology used in progressive knowhow Secondly -good price (around $ 250-450 / t processed) Third - offered an interesting circuit to further sale of products in the Asian market with full control of the quality of the buyer at the manufacturing stage. 4

Business Scale. Invest costs * Title The amount, estimated cost , $ The amount , estimated cost, $ The amount, estimated cost, $ Raw output 30 000 tonnes / year Raw output 100 000 tonnes / year Raw output 200 000 tonnes / year square 5ha 10ha 15ha Starch and starch products 1,500㎡ 1 050 000 5,000㎡ 3 500 000 8,500㎡ 5 950 000 Storage of raw materials 3,000㎡ 900 000 10,000㎡ 3 000 000 10,000㎡ X 2set 6 000 000  Storage of ready materials 1,000㎡ 600 000 2,000㎡ 1 200 000 4,000㎡ 2 400 000 office and lab 300㎡ 210 000 800㎡ 560 000 700 000  additional rooms equipment 1 LOT 14 000 000 32 000 000 42 000 000 Water treatment and purification 150 tn/day 400 000 250 tn/day 800 000 350 tn/day 1 000 000  ELECTRIC POWER eQUIPMENT 400kw 600kw 1200kw   gas supply system 10 cube. м/h   25 cube .м/h 40 cube.м/h Special equipment, spare parts 300 000 500 000   engineering works total 18 020 000 42 260 000 59 650 000 Working capital 4 000 000 15 000 000 25 000 000 22 020 000 57 260 000 84 650 000 * - The exact amount possible after detailed engineering 5

The participation of the Project Executor Business identification number 160640000469 Title of the company LLP “KazBioTech" Address Kostanai, Baimagambetov Str169 Name and surname of the director Nurkhanov Nurlan tel +7 701 511 50 90 E-mail kazbiotec@gmail.com Gasified production area on a plot of 10 hectares - * Contracts of intention are concluded on the supply of raw materials from farms (Kostanay-largest raw material base, the order of 4-6 million tons of wheat per year). It signed an agreement of intention with the South Korean company to transfer tadvanced technologies of grain processing to Kazakhstan Ready manpower for the start of the project is almost 80%. Sufficient selection of qualified personnel (Kostanay agricultural processing center in the region) Administrative resources are written confirmation of the regional administration in the provision of infrastructural assistance to the project. Expressions of interest and willingness to purchase finished products from the Asian partners * -up To 2021 on the sale of land to non-residents of Kazakhstan moratorium 6

Cost of the project and return (30,000 tons / year) Total costs per ton of $ 281.8 (raw wheat at the rate of $ 200 / t) + $ 92 (additional) $ 38.64 + (control) + $ 35.21 (loan servicing) + 44 $ 82 (depreciation) = ⇒ approx. $ 500 / ton (100,000 tons / year) Total costs per ton of $ 281.8 (raw wheat at the rate of $ 200 / t) + $ 92 (additional) $ 25.15 + (control) + $ 26.21 (loan servicing) + 31 $ 26 (depreciation) = ⇒ approx. $ 460 / ton (200,000 tons / year) Total costs per ton of $ 281.8 (raw wheat at the rate of $ 200 / t) + $ 92 (additional) $ 11.56 + (control) + $ 13.99 (loan servicing) + 19 $ 11 (depreciation) = ⇒ approx. $ 420 / ton Production The sale price, $ / ton Starch F.O.B – 700 feed additives F.O.B – 200 Glutin F.O.B – 1,500   30000ton/year 100000tn/year 200000 tn/year Sum from selling 20 404 200 71 414 000 135 665 000 Cost price 11 243 950 33 491 950 58 634 800 Operating profit 9 160 850 37 922 050 77 030 200 Taxes*(15%) (app) 1 374 128 5 688 308 11 554 530 TOTAL, annual income 7 786 723 32 233 743 65 475 670 Payback (investment / profit) months 34 21 16 7

Implementation Schedule Title Period (months) М+4 М+6 М+8 М+10 М+12 М+14 М+16 М+18 М+20 М+…. Preparation to the project Manufacturing equipment building installation work Transportation Installation and commissioning Work regime The payback period of the total investment will be 16-34 months from the date of commissioning of the plant. The construction period of 12-16 months. Project Indicators calculated excluding reimbursement of 30% of state expenditures in the form of grants or in-kind grant (according to the Republic of Kazakhstan "On investments" Law) 8

Production scheme Scheme of production of wheat starch and by-products <principal scheme> Raw Fresh water chemicals fiber material 45~55℃ Conveyor 10~15℃ (Mill feed) Chilled air waste Water Vibrating sieve Mill feed Process blowing → To waste water tank water cooling water acid From Purifier waste process water gluten milk Fiber materials ◆ Gluten ◆ Комбикорм ◆ Starch Milling separator Magnetic separator De-stoner Measurement Measurement conveyor Wahsing Rotary washer Steeping Steeping Tank #1 De-watering Peeler centrifuge Purifictation Grinding Break Roller 6stage Reduction Smooth Roller 6stage Buffer Tank → To Mill feed supply tank Starch extraction Extraction Tank Pre-heating Heat exchanger Cooling Steam heavy solution Starch separation 3Phase-nozzle decanter Fine sieving Conical strainer #2 De-watering 3P-Decanter Filtering Screen centrifuge De-hydration Drying Hot-air flash dryer Giuten filter Packer De-watering 2-phase decanter Ring dryer Starch filter Starch Tank Storage conveyor Mill Feed supply 9

Thank you for your attention!