RPC with strip readout Last results from test of timing glass

Slides:



Advertisements
Similar presentations
1 Beam Test Results of USTC LMRPC modules (50cm) Yongjie Sun presnted by Hongfang Chen.
Advertisements

Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
Progress report NeuLAND Outline Short reminder about NeuLAND Timing RPC concept Open questions - Impedance matching RPC prototype at GSI Next steps Collaboration.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
HCAL with Resistive Plate Chambers José Repond Argonne National Laboratory Presented at the Chicago Linear Collider Workshop January 7-9, 2002.
Preparation of MTD production Yongjie Sun Center of Particle Physics and Technology University of Science and Technology of China.
New MRPC prototypes developed in Tsinghua Unversity Huangshan Chen (Tsinghua Unversity)
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
November 5, 2004V.Ammosov ITEP-Moscow, Russian CBM meeting 1 IHEP possible participation in CBM TOF system Vladimir Ammosov Institute for High Energy Physics.
15 th CBM collaboration meeting, GSI, Darmstadt, Germany, April 12-16, 2010Wang Yi, Tsinghua University R&D status of low resistive glass and high rate.
Cross-talk in strip RPCs D. Gonzalez-Diaz, A. Berezutskiy and M. Ciobanu with the collaboration of N. Majumdar, S. Mukhopadhyay, S. Bhattacharya (thanks.
1 Cross section of a double-stack MRPC. 2 Clean room for MRPC strip production.
V. Ammosov 13th CBM meeting,GSI,March 10 1 Beam test of pad tRPCs with ultra-thin glass Status of IHEP+INR activity for high rate RPCs.
RPC R&D status in Bucharest (JRA12-I3HP) Mihai Petrovici - CBM-Meeting, GSI, March 1,2006 Short history SMSMGRPC – Glaverbel Glass Prototype –Construction.
Third workshop on hadron physics in ChinaWang Yi, Tsinghua University A conceptional design of SOLID-TOF Outline: Development of low resistive glass and.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Design of a readout system for RPCs Olu Amoda2 The LODEN Group The group is an association of Fermilab scientists who teamed up to build a cosmic ray.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
Diego Gonzalez Diaz University of Santiago de Compostela ITEP IHEP (Protvino), ITEP (Moscow), INR (Moscow), LIP(Coimbra), USC(Santiago de Compostela)
FINESSE 1. Delicacy and refinement of performance, execution or workmanship 2. Tact, subtlety, or skill in handling a situation.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
Mariana Petris, CBM Collaboration Meeting, October 13-18, 2008, Dubna Mariana Petris, NIPNE - Bucharest C B M In-Beam Test Results of the Pestov Glass.
Report on beam test results of high-rate MRPCs Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China.
长读出条 MRPC 性能研究 孙勇杰 Key Laboratory of Technology of Particle Detection and Electronics, USTC-IHEP, CAS Center of Particle Physics and Technology, USTC.
July 8, 2003V.Ammosov GSI, CBM meeting1 RPC TOF system for HARP experiment (Applicability for CBM) Vladimir Ammosov Institute for High Energy Physics Protvino.
MRPC Beam GSI Yongjie Sun University of Science and Technology of China.
Performance of Prototype MRPC Detector for STAR Frank Geurts (Rice Univ.) for the STAR TOF collaboration.
Ingo DeppnerRPC 2012 Workshop, INFN, Feb A Mutistrip MRPC prototype for the CBM Time-of Flight wall Outline: Motivation / CBM-ToF Requirements.
ITEP participation to the CBM TOF project ITEP ALICE - TOF group CBM – Russia meeting at ITEP, Nov 5 th, 2004.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
WP 13 Task Develop a complete system of large size RPC (single- gap/multi-gap) with timing capability better than few hundreds ps. This includes.
Ingo DeppnerSTAR Regional Meeting at USTC Hefei Ingo Deppner Physikalisches Institut der Uni. Heidelberg CBM TOF prototypes STAR Regional.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 1 Status and plans of R&D for DHCAL in Russia Vladimir Ammosov Institute for High Energy Physics.
CALIFA - USC R&D activities: Designing and prototyping CALIFA a next generation calorimeter for R3B/FAIR Huelva July 07.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
A high rate fast precision tracking trigger with RPCs
The ALICE-TOF system 1. Quick overview of the TOF system that we are building 2. The Multigap Resistive Plate Chamber -what is it? 3. Difference in.
Activities and Results from PNPI GATCHINA
A systematic study of cross-talk limitations in RPC timing
Hit-Rate Dependence and Gas Mixture of Prototype MRPC for LEPS2
Status of BESIII and upgrade of BESIII
Performance studies of a single HV stack MRPC prototype for CBM
Department of Engineering Physics, Tsinghua University, Beijing, China
Beam detectors performance during the Au+Au runs in HADES
Results achieved so far to improve the RPC rate capability
Performance of timing-RPC prototypes with relativistic heavy ions
Start Detector for pion experiments
SHiP straw tracker prototype tests
CMS muon detectors and muon system performance
Multigap Resistive Plate Chambers (MRPC)
News on second coordinate readout
Hellenic Open University
Conceptual design of TOF and beam test results
Han Jifeng BESIII MUON GROUP IHEP, CAS
MRPC -High Time Resolution Detector R&D at USTC CHINA Chen, Hongfang 2001/Oct. Oct.2001, Beijing MRPC,USTC.
Performance of a Multigap RPC prototype for the LHCb Muon System
Impedance & Bandwidth Measurements of '2-strip anode test plate'
Impedance & Bandwidth Measurements of '2-strip anode test plate'
Impedance & Bandwidth Measurements of '2-strip anode test plate'
Update on SoLID-TOF Wang Yi Outline: Conceptual design of SoLID-TOF
High time resolution TOF for SoLID
Forward TOF Anton A. Izotov, PNPI.
High time resolution TOF for SoLID
Study of timing properties of single gap high-resistive bakelite RPC
BESIII端盖TOF升级 MRPC性能测试
Presentation transcript:

RPC with strip readout Last results from test of timing glass IHEP+JINR 2nd PANDA Russia Workshop, 27 April 2010

A little bit of history about JINR+IHEP efforts

The PANDA Workshop, ITEP MOSCOW, April 17-18 2008 / The PANDA Workshop, ITEP MOSCOW, April 17-18 2008

Strips with double ended readout. Strip length ~30 cm 11-14 identical MRPCs. Strips with double ended readout. Strip length ~30 cm If strip width is 3 cm, one module contains 64 strips. Total active area ~ 6.4 m2. Signal is amplified and digitized at RPC. The PANDA Workshop, ITEP MOSCOW, April 17-18 2008

The PANDA Workshop, ITEP MOSCOW, April 17-18 2008 4 gap glass RPC inside The PANDA Workshop, ITEP MOSCOW, April 17-18 2008

Thickness of six-gap RPC made of 0.6 mm glass plates material X0(mm)‏ thickness (mm)‏ X/X0 (%)‏ glass 127 8x0.6 3.83 aluminium 89 2x1 2.22 copper 14.4 0.1 0.69 mylar 287 0.6 0.21 kapton 286 0.25 ~0.10 SUM ~ 7 % 6 6 6

6 gap RPC prototype tested with beam at IHEP

RPC resolution and efficiency vs. applied voltage HV=9kV, time resolution ~45ps, efficiency above 98% Time-charge correction RPC+”RPC FEE1” developed for FOPI RPC Jülich, XXX PANDA meeting, 2009 8 8 8

Main results from test done in2008 Very first steps have been done. Time resolution of ~50 ps can be obtained with 6-gap glass MRPC having strips with width of 25mm. Neither efficiency nor resolution depends on position along strip. With double end readout a spatial resolution along a strip is not worse than 1 cm. If a coordinate along strip is known (say, from a tracker) a one-end strip readout is enough to provide with good timing resolution. Number of readout channels in this case can be reduced by 2. Jülich, XXX PANDA meeting, 2009 9 9 9

TIME-OVER-THRESHOLD METHOD. BEAM TEST OF 6 GAP RPC. TIME-OVER-THRESHOLD METHOD. 2009: RPC+NINO(ALICE)+HPTDC(100psec/count, Dubna) 2010: RPC+TRB-HADES (improved TOT + 100psec HPTDC) 2nd PANDA Russia Workshop, 27 April 2010

2009: ENDS OF A STRIP ARE NOT LOADED WITH RESISTORS time width Multiple reflections width 2nd PANDA Russia Workshop, 27 April 2010

2009: RESISTOR AT END OF A STRIP MATCHES THE IMPEDANCE OF THE TRANSMISSION LINE. time width Two ends of the same strip width 2nd PANDA Russia Workshop, 27 April 2010

Time-width correction for the slewing time 2009: RESISTOR AT END OF STRIP IS TAKEN IN CORRESPONDANCE WITH THE IMPEDANCE OF STRIP LINE. Time-width correction for the slewing time width Final result: after subtraction of trigger jitter the resolution is σ ≈ 120 psec 2nd PANDA Russia Workshop, 27 April 2010

2010: RPC+TRB_HADES Resolution vs HV very preliminary Efficiency vs HV 2nd PANDA Russia Workshop, 27 April 2010

WE DO NOT UNDERSTAND HOW HPTDCs WORK !!! Tests of HPTDC with a pulser: time jitter of measured signal dependently to delay between signal and “common stop” HPTDC from Dubna HPTDC from HADES 2nd PANDA Russia Workshop, 27 April 2010