A WORLD PRESENCE IN THE FIELD OF WATER LE RESERVOIR MASSAL FAYAT GROUP A WORLD PRESENCE IN THE FIELD OF WATER
ACTIVITIES Boiler making : range of product LE RESERVOIR MASSAL FAYAT GROUP ACTIVITIES Boiler making : range of product Tanks for compressed air Expansion tanks Galvanized tanks with or without bladder Tanks for the pressure maintenance Anti water-hammer tanks with bladder for potable water Anti water-hammer tanks with bladder and self aerating tanks for waste and rain water
LE RESERVOIR MASSAL COMPRESSED AIR FAYAT GROUP
LE RESERVOIR MASSAL GALVANISED TANK FAYAT GROUP
LE RESERVOIR MASSAL VAPOR TANK FAYAT GROUP
ANTI WATER-HAMMER TANK LE RESERVOIR MASSAL ANTI WATER-HAMMER TANK FAYAT GROUP
LE RESERVOIR MASSAL MANUFACTURE ISO 9001 V2000 FAYAT GROUP MANUFACTURE ISO 9001 V2000 Manufacture in conformity with the European Directive 97/23/CE Thickness calculation according to CODAP 2000 Capacity from 0 to 100000 L Pressure from 0 to 100 bar
MATERIALS Steel ALL MATERIALS used for the MANUFACTURE of the ENCLOSURES UNDER PRESSURE ARE IN CONFORMITY WITH EUROPEAN DIRECTIVE D.E.S.P. 97/23/CE Material used for the vessel: P265GH
ROLLING OF A SHELL IN Ø3000 AND 35 mm LE RESERVOIR MASSAL FAYAT GROUP A TANK ASSEMBLY ROLLING OF A SHELL IN Ø3000 AND 35 mm
70 M3 TANK DURING THE MANUFACTURING LE RESERVOIR MASSAL FAYAT GROUP ASSEMBLY OF A TANK 70 M3 TANK DURING THE MANUFACTURING
LE RESERVOIR MASSAL HYDRAULIC TEST FAYAT GROUP
LE RESERVOIR MASSAL MATERIALS BLADDERS FOR THE TANKS UNTIL 500 L : FAYAT GROUP MATERIALS BLADDERS FOR THE TANKS UNTIL 500 L : Bladder in EPDM FOR THE 750 L TANKS AND MORE : Bladder in polyurethane
REALISATION OF A BLADDER IN POLYURETHANE LE RESERVOIR MASSAL FAYAT GROUP REALISATION OF A BLADDER IN POLYURETHANE
REALISATION OF A BLADDER IN POLYURETHANE LE RESERVOIR MASSAL REALISATION OF A BLADDER IN POLYURETHANE FAYAT GROUP
ANTI-CORROSION PROTECTION LE RESERVOIR MASSAL FAYAT GROUP ANTI-CORROSION PROTECTION - Hot galvanisation in option up to 4500 litres ( 1250) - Painting after sandblasting for all capacity Internal : Epoxy External : Epoxy Finishing lacquer
LE RESERVOIR MASSAL FAYAT GROUP
LE RESERVOIR MASSAL EQUIPEMENTS Visual level Magnetic level FAYAT GROUP EQUIPEMENTS Visual level Magnetic level Weight controller « Mas-Control »
LE RESERVOIR MASSAL FAYAT GROUP VISUAL LEVEL
LE RESERVOIR MASSAL MAGNETIC LEVEL FAYAT GROUP
LE RESERVOIR MASSAL WEIGHT CONTROLLER FAYAT GROUP
ACTIVITIES INGINEERING LE RESERVOIR MASSAL FAYAT GROUP ACTIVITIES INGINEERING UPSTREAM : Definition of the material with the bulding site master At the invitation bids : Definition of the material with the society answered at the tender
LE RESERVOIR MASSAL THE ANALYSIS Hydraulic calculations softwares FAYAT GROUP THE ANALYSIS Hydraulic calculations softwares All of our hydraulic studies are free: Calculation of regulation Calculation of pressure maintenance Calculation of accumulation Anti water-hammer calculation
Anti water-hammer calculation LE RESERVOIR MASSAL Anti water-hammer calculation FAYAT GROUP Elements necessary to realize calculation: Maximum flow Hydraulic profile Inside diameter of the pipeline Nature of the pipeline Nature of the water
CALCULATION OF REGULATION LE RESERVOIR MASSAL FAYAT GROUP CALCULATION OF REGULATION Elements necessary to realize calculation: Pressure at the pump start Flow at the pump start Pressure at the pump stop Flow at the pump stop Number of acceptable time starting (according to the number of pumps, these data have to be communicated for each pump)
LE RESERVOIR MASSAL FAYAT GROUP CALCULATION WITHOUT PROTECTION ALLIEVI Formula : H = (celerity x speed) / 9,81 Max. Pression + H Geometric height Min. Pression - H
LE RESERVOIR MASSAL ARRIVAL AT THE PUMP CHECK VALVE FAYAT GROUP ARRIVAL AT THE PUMP CHECK VALVE ATMOSPHERIC PRESSURE ARRIVAL Normal functioning Pump Stop DEPRESSION PROPAGATION OF THE WAVE PROPAGATION OF THE WAVE
LE RESERVOIR MASSAL ATMOSPHERIC PRESSURE ARRIVAL SURPRESSION FAYAT GROUP ATMOSPHERIC PRESSURE ARRIVAL SURPRESSION PROPAGATION OF THE WAVE PROPAGATION OF THE WAVE
Amortisation of the water-hammer LE RESERVOIR MASSAL FAYAT GROUP Amortisation of the water-hammer PRESSURE IN FONCTIONING PRESSURE FALL PHASE PRESSURE GOING UP PHASE
LE RESERVOIR MASSAL SOME REALISATIONS San Lorenzo Station (Salvador) FAYAT GROUP SOME REALISATIONS San Lorenzo Station (Salvador) 2 x 25 m3 in 25 bar
Pumping station in Abu Dhabi (UAE) LE RESERVOIR MASSAL REALISATION FAYAT GROUP Pumping station in Abu Dhabi (UAE)
Pumping station in Freyming (France) LE RESERVOIR MASSAL REALISATION FAYAT GROUP Pumping station in Freyming (France) 1 x 6000 L ; 2 x 500 L ; 1 x 2000 L
LE RESERVOIR MASSAL REALISATION 80 m3 tanks in 10 bar (Egypt) FAYAT GROUP 80 m3 tanks in 10 bar (Egypt)
42 m3 tanks in 10 bar (Argentina) LE RESERVOIR MASSAL REALISATION FAYAT GROUP 42 m3 tanks in 10 bar (Argentina)
LE RESERVOIR MASSAL REALISATION Capelle station (France) 2 x 5000 L FAYAT GROUP Capelle station (France) 2 x 5000 L 1 x 1000 L
LE RESERVOIR MASSAL CONCLUSION FAYAT GROUP LE RESERVOIR MASSAL is especially a partner Free studies from the begining of the project Rapidity of response to a consultant The best studied price Service submitted to a self-control at each station After sale service realized on line