Surveying and Mapping City of Hollywood
HISTORY OF THE FIRM Calvin, Giordano & Associates, Inc. We are a well-established multi-disciplinary firm that has been located in South Florida for 80 years. Since 1937, the company has grown from a small, two-person surveying firm to over 350 employees, providing 25+ municipal services. Municipal/Agency Experience (not limited to): Town of Bay Harbor Islands, FL City of Dania Beach, FL City of Pembroke Pines, FL Town of Medley, FL City of Delray Beach, FL City of Tamarac, FL Town of Surfside, FL City of Fort Lauderdale, FL City of West Palm Beach, FL Village of Key Biscayne City of Greenacres, FL City of Weston, FL City of Homestead, FL City of Hallandale Beach, FL Monroe County, FL City of Miami Gardens, FL City of Hollywood, FL South Broward Drainage District, FL City of Sunny Isles Beach, FL City of Lauderdale Lakes, FL Town of Davie, FL City of Key West, FL City of Lauderhill, FL Town of Lake Park, FL City of Marathon, FL City of Miramar, FL Town of Mangonia Park, FL City of Boca Raton City of North Lauderdale, FL Town of Palm Beach City of Cooper City, FL City of Oakland Park, FL City of Coral Springs, FL City of Pahokee, FL
KNOWLEDGE OF SITES AND LOCAL CONDITIONS CGA Firm Experience – 80 years within City of Hollywood CGA Professional Surveyors Experience – 96 combined years of experience; all practicing in South Florida Florida Standards of Practice Requirements for Surveying (5J: 17.050-17.053) Florida Plat Law – State: Chapter 172, Platting 177.011-177.151; Broward County Article 7, Platting Requirements, City of Hollywood: Article III: Platting Requirements Sec. 30-69 to 30 Article IV: Improvements Sec. 30-105 to 30-121 Article V: Plat Submissions Sec. 30-141 to 30-147
Core team members and experience STEVE WATTS, PSM, Project Manager, Primary Client Contact DIRECTOR OF SURVEY PROJECT EXPERIENCE Mr. Watts has over 29 years of experience as a Professional Surveyor and Mapper registered in the State of Florida. Having spent his entire surveying career working in Broward County, he is extremely knowledgeable of the rules, requirements and has the experience in providing surveying and mapping services to South Florida municipalities. He specializes in public work and engineering design type surveys, land acquisition, easements, title research, and computer mapping. 33 Years of Industry Experience 29 Years Licensed Professional Surveyor Education: BSLS, Purdue University, 1984, Lambda Sigma: Land Surveying Honorary FLORIDA PSM NO. 4588
Core team members and experience Michael Mossey, PSM Assistant Director of survey PROJECT EXPERIENCE Mr. Mossey has 39 years of experience in land surveying and mapping in South Florida. He has performed construction, right of way, control, ALTA, and boundary and topographic (both acreage and coastal) surveys. He is knowledgeable in the use of a wide range of state-of-the-art surveying equipment and associated computer technologies. He has extensive experience in field crew supervision, quality control and client relations. 39 Years of Industry Experience 21 Years Licensed Professional Surveyor Education: Maryville College, Maryville, Tennessee FLORIDA PSM No 5660
Core team members and experience RONNIE FURNISs, PSM SURVEY AND CAD ENGINEER PROJECT EXPERIENCE Mr. Furniss has 37 years of experience in all phases of land surveying including boundary, hydrographic, route, topographic, and as-built surveys, preparing sketch and descriptions, legal descriptions, record plats, and boundary descriptions for annexations for municipalities, all with CGA. He began his career as a rodman and worked in the field for the first 20years of his employment. He has been instrumental in advancing the firm’s electronic data collection processing and procedures. 37 Years of Industry Experience 19 Years Licensed Professional Surveyor Education: FDOT- EFB Training Autocad Certification Courses: CAiCE Visual, Coordinate Geometry, and CAiCE Visual DTM FLORIDA PSM No. 6272
Core team members and experience David Rohal, PSM Surveyor PROJECT EXPERIENCE Mr. Rohal has 41 years of experience in surveying in South and Central Florida, beginning in 1975 with the Miami-Dade County Parks Department. He then relocated to Broward County and began working with private Engineering-Survey firms both in the field and office. He has been a Field Crew Supervisor, Project Surveyor and Platting Department Manager. 41 Years of Industry Experience 31 Years Licensed Professional Surveyor Education: Associates Of Arts Degree, University Of Florida Civil Engineering Courses, Florida International University AUTOCAD, Broward College FLORIDA PSM No. 4315
PRIOR EXPERIENCE ON SIMILAR PROJECTS Current Municipal Clients with Surveying and Mapping Services: City of Weston City of Pembroke Pines City of North Lauderdale Town of Surfside City of Fort Lauderdale City of Hallandale CRA
OVERALL APPROACH AND METHOLODY Initial survey request from City Due Diligence Scope of Services, Schedule and Fee Estimate Notice-to-Proceed (NTP) Survey Crews on-site with 48 hrs. of NTP 90% of Projects – Schedule of 2-3 weeks Quality Control / Quality Assurance (QA/QC) Final Product Deliverable
SIMILAR PROJECT EXPERIENCE City of Pembroke Pines Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services Shawn Denton, Director of Public Services City of Weston Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services Darrell Thomas, Assistant City Manager
SIMILAR PROJECT EXPERIENCE City of North Lauderdale Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services George Krawczyk, Public Works Director Town of Surfside Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions and General Surveying Services Rosendo (Ross) Prieto, Building Official
SCHEDULE FOR PROJECTS Day 1: Due Diligence: Plat information, BCPA Property Card, Recorded Deed(s), Survey Control Day 2: Follow-up with City staff regarding scope of services, intent of project, future considerations. Day 3: Submit formal scope of service, fee estimate and project schedule. Issuance of Notice-to-Proceed Days 4-5: Survey Crew on -site within 48 hrs. of NTP Days 6-8: On-site Survey Data Collection Days 6-10: Process field data, calculate boundary, cad drafting, preliminary survey for review Days 11-13: QA\QC of survey, PSM on-site review Day 14: Finalize Survey based on review comments Day 15: Submit survey and cad file to City
EXAMPLE
EXAMPLE
EXAMPLE
QUESTIONS?