Impairment in groundwater systems/Hays water transfer

Slides:



Advertisements
Similar presentations
Alaska Department of Natural Resources, DML&W Water Resources Section Putting It All Together Alaska Coastal Management Program Annual Conference April.
Advertisements

Idaho Conjunctive Management Rules & Ground Water District Formation
PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS Zach C. Miller Davis Graham & Stubbs LLP Denver, Colorado December 14,
Active Water Resource Management in the Lower Rio Grande TOOLS FOR A NEW ERA IN WATER MANAGEMENT presented by Peggy Barroll, Hydrologist New Mexico Office.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Salt Lake Valley Groundwater Management Plan State of Utah Department of Natural Resources Division of Water Rights.
The Revised Federal EEO Complaint Process Prepared by the IHS Equal Employment Opportunity and Civil Rights Office May 16, 2000.
Kansas Transition from Ground Water Development to Enhanced Ground Water Management Define the Resource Beneficial Use Protect and Control Thomas L. Huntzinger,
Water Rights: Use and Economics By Travis Hoesli.
IDWR PUBLIC INFORMATION MEETING June 25, 2013 Hailey, ID Several edits made 6/26/2013 from corrections provided at 6/25 meeting.
2006 Idaho Climate and Water Resource Forecast Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
Active Water Resource Management in the Lower Rio Grande
Conjunctive Management in Idaho A State Perspective Rexburg, Idaho December 9, 2014Mat Weaver, IDWR.
Procurement Lobbying Legislation New York State Bar Association December 9, 2005 (revised January 4, 2006)
Area of Notice Bannock Creek Drainage All surface and ground water rights in drainage Approximately 80 – 90 notices sent.
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
Sector Planning Process Alachua County Commission July 8 th,
Brooten Area Water Use June 19, Brooten – Initial Conflict Study Area.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Taking Care of Your Water Rights: Permits, Extensions & Certificates Oregon Association of Water Utilities August 2013 Lisa Jaramillo Water Right Services.
In 1972 the Kansas Legislature established the Groundwater Management Act that led to the establishment of a total of five (5) local Groundwater Management.
IDWR PUBLIC HEARING February 28, 2012 Mountain Home, ID.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
CONSIDERATION OF STREAMLINED PROCESS FOR STIPULATED WASTE TIRE HAULER AND WASTE TIRE FACILTY ADMINISTRATIVE PENALTY CASES CIWMB Board Meeting Agenda Item.
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Ken Ortego – Vilar and Elliott.
1 Farm Service Agency FY2010 Annual Civil Rights Training “FSA No Fear Act Training Required Every Two Years” and“Understanding/Navigating FSA EEO Complaint/ADR/Mediation.
Public Water Supplier Considerations Rural Water Association of Utah April 25, 2013 April 25, 2013 Utah Division of Water Rights Kirk Forbush, P.E. Regional.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Allocation of Conserved Water Program Presented By Dwight French 3.
Declaring Beneficial Use in Water Use Groups R
What You Need to Know about Groundwater Conservation Districts In Texas Tyler December 3,2002 Guy Fipps Professor and Extension Irrigation Engineer Dept.
IDWR PUBLIC INFORMATION MEETING March 19 & 27, 2013 Mountain Home & Idaho City, ID.
STATE OF OREGON WATER EFFICIENCY STANDARDS PNWS-AWWA Conference Eugene, Oregon May 2014 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
Nebraska Water Law Conference Wyoming Ground Water Laws.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Policy for Maintaining Instream Flows in Northern California Coastal Streams Monitoring and Reporting Provisions for Water Rights Victoria Whitney Deputy.
Water Right Issues of the State Engineer Utah Water Users Workshop March 17, 2015 Kent L. Jones, P.E. State Engineer.
Overview of Proposed Alaska National Wildlife Refuges Regulatory Changes U.S. Fish and Wildlife Service.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Central Iron County Water Conservancy District Water Rights Issues Jerry Olds State Engineer October 5, 2006.
AMENDMENTS TO THE PROGRAM COMPLIANCE REVIEW GUIDE July 2006 IFTA Annual Business Meeting.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
S.B Municipality Fees. S.B – Environment Budget Reconciliation Bill Enacted during the 2011 regular legislative session and becomes effective.
Municipal Water Rights…… Water Law & Policy Seminars March 12, 2012 Kent L. Jones, P.E. State Engineer.
Ground-Water Management Plan Beryl Enterprise Area August 6, 2007 Sign up sheet.
Interstate Groundwater Agreements Utah Water Law Conference March 10, 2008.
Mark Rude Executive Director Southwest Kansas Groundwater Management District No. 3.
Fall  Alternative Enforcement : The City of Mankato has established an Administrative Enforcement and Hearing Program as an enforcement option.
Utah Division of Water Rights June 21, 2004 From Application to Certification Clark Adams--April 2016 The Application Process.
Implementation Under HB 25 – Quantity Impairment Water Law and Policy Seminars Kent L. Jones, P.E. March 14, 2016 State Engineer.
Sebago Elementary School Withdrawal Committee
Urban Water Institute- August 2015
SGMA* Planning Update #4 *Sustainable Groundwater Management Act
GUKEYEH GUK’EH GU’SANI Kaska Dena Good Governance Act
December 2016.
Large scale development groundwater balance
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
Procurement Lobbying Legislation New York State Bar Association
Test Slant Well Project Permit Amendment (Coastal Commission Agenda Item Tu 15a) Date: Oct. 6, 2015 Presented by CAW at the Oct. 6, 2015, California Coastal.
“Whiskey is for drinking, water is for fighting over.”
Sustainable Groundwater Management Act
Groundwater Management Area 12: Consideration of the Impact on
Richard J. Wenstrom, P.E. Edwards County Director Water PACK
Gila River Indian Community & System Conservation
Shasta Valley Groundwater Basin
2018 Kern County Water Summit
EEO MODULE 3: DISCRIMINATION COMPLAINT PROCESSING
Brooke McGregor, Program Liaison, Watermaster Section
Presentation transcript:

Impairment in groundwater systems/Hays water transfer GMD 3 annual meeting March 8, 2017 David Barfield, Chief Engineer Division of Water Resources Kansas Department of Agriculture

Kansas Water Appropriations Act’s fundamental charge to the Chief Engineer K.S.A. 82a-706: The Chief Engineer shall enforce and administer the laws of this state pertaining to the beneficial use of water and shall control, conserve, regulate, allot and aid in the distribution of the water resources of the state for the benefits and beneficial uses of all its inhabitants in accordance with the rights of priority of appropriation. K.S.A. 82a-706b – “It shall be unlawful for any person to prevent, by diversion or otherwise, any waters of this state from moving to a person having a prior right to use the same…”

Impairment process 1) Complaint 2) DWR Investigation 3) DWR Report of Findings 4) If impairment is found and action desired, complainant must file a request to secure water 5) Action by the Chief Engineer as long as required

Initial High Plains aquifer impairment action Stevens County (Gooch – Mills) 2008 – first water administration in the Ogallala. 2009, 2010 – DWR developed alternative water administration methods, eventually establishing trigger elevations in the aquifer to determine action DWR Developed revised rules on our impairment process, adding specifics on groundwater investigations

Groundwater Impairment investigations process Determine if complainant has good well/pumping plant Review well logs; geologic information. Install monitoring equipment (pumping rate/quantity; well depths), conduct pump test to determine local aquifer properties; extent of direct well to well interference Prepare initial report, provide to GMD and neighbors for opportunity for comment Final report If impairment found, determine remedy

Wells that interfere with HS3 Well 19032 stopped pumping 6/29/13 (out of water) Well 10467 stopped pumping 5/26/13 Well 25275 not pumped in 2013 Pumping rate loggers and telemetry installed at wells 10035 and 11750 July 2013

Haskell County impairment (Garetson) 2005 – Garetson files impairment compliant with the Chief Engineer Expressed interest in an IGUCA to address concerns 2007 - Compliant withdrawn 2012 - Garetson files an impairment compliant in District Court K.S.A. 82a-716/717a – Allows water right holders to file directly to District Court to seek redress K.S.A. 82a-725- Allows Court to appoint chief engineer as referee 2014 – District Court grants temporary injunction 2015 - KS Court of Appeals upholds 2017 – District Court grants permanent injunction

Stone v. Hands litigation - dismissed

Total usable groundwater in storage equals about 200 million acre-feet (from USGS and KGS data compiled in an unpublished report, “Water Supplies and Use in Kansas” by Kansas Department of Agriculture, Division of Water Resources, April 24, 2007; rounded down from 219 million acre-feet considering estimated declines of about 2 to 3 million acre-feet per year). Total renewable groundwater supply equals about 4 million acre-feet of annual recharge (from USGS and KGS data compiled in an unpublished report, “Water Supplies and Use in Kansas” by Kansas Department of Agriculture, Division of Water Resources, April 24, 2007). However, most of the recharge is in central and eastern Kansas whereas most of the groundwater use is in western Kansas.

Quivira National Wildlife Refuge impairment investigation

Kansas Dept. of Agriculture, 12/10/2015 Depletions to Rattlesnake streamflows (baseflows) at Zenith due to junior groundwater pumping Determined by use of the GMD 5 groundwater model Kansas Dept. of Agriculture, 12/10/2015

Kansas Dept. of Agriculture, 12/10/2015 Refuge needs within its water right May, 2015 – Attachment 5 of Initial Report Kansas Dept. of Agriculture, 12/10/2015

Figure 10 in initial report

Quivira: current status Impairment investigation report finalized July 15, 2016 found junior, upstream groundwater pumping is regularly interfering with the U.S. Fish and Wildlife Service’s senior use. Regularly 3,000 – 5,000 acre-feet per year Working with water users to develop a workable solution 2015 Legislative action states that augmentation can be considered as a remedy for impairment Basin’s Sept. 2016 offer: augmentation only, 1500 AF/year, 15 cfs, on the Refuge Rejected by Service in December 1 as insufficient in quantity and noting that placing augmentation infrastructure on the refuge as described in the offer poses “significant legal obstacles

Quivira: current status Our Dec 8, 2016 letter to the basin Requested basin stakeholders develop a revised settlement offer by February 15, 2017. Should an agreement not be reached, we will be obligated to develop an administrative remedy for implementation in 2018 and beyond. No administration again in 2017 On 1/1/2017, the Service filed a “Request to Secure Water,” with a request to begin administration on 1/1/2018 On 2/15/2017, GMD 5 made a second offer, up to 5,000 acre-feet/year of augmentation

Water transfer for Hays 7000 AF; 80 miles.

Two Distinct Approval Processes required Change application approval under the Kansas Water Appropriation Act…. This process is first as the changes applications must be contingently approved prior to the water transfer process Water Transfer Process

Changes in water rights K.S.A. 82a-708b. Application for change in place of use, point of diversion or use; fee; review of action on application. (a) Any owner of a water right may change the place of use, the point of diversion or the use made of the water, without losing priority of right, provided such owner shall: (1) Apply in writing to the chief engineer for approval of any proposed change; (2) demonstrate to the chief engineer that any proposed change is reasonable and will not impair existing rights; (3) demonstrate to the chief engineer that any proposed change relates to the same local source of supply as that to which the water right relates; and (4) receive the approval of the chief engineer with respect to any proposed change…

Process from here DWR to complete its review of change applications and negotiations with the Cities on terms and conditions, including drafting of a master order and the individual approval documents Send to GMD 5 and basin for review. Public meeting to gather input Provisional approval of the change applications Water Transfer Hearing and review

Questions & Discussion LANE

Court of appeals decision K.S.A. 2014 Supp. 82a-707(c) provides that the first person to divert water from any source and use it for beneficial purposes has prior right thereto. In other words, "the first in time is first in right.“ K.S.A. 82a-716 and K.S.A. 82a-717a afford a senior water right holder the right to seek injunctive relief—and in some cases monetary damages—in order to protect his or her prior right against a junior water right holder. Looking to the plain and unambiguous language of K.S.A. 82a-716 and K.S.A. 82a-717a, it is apparent that the legislature intended that the holder of a senior water right may seek injunctive relief to protect against a diversion of water by a holder of a junior water right when that diversion does or would diminish, weaken, or injure the prior right.

When does yes, become no? At the meeting, the question was posed as to when DWR's "yes" in approving a new application or change application, becomes a "no" in our real-time administration of water rights. I replied that all approvals are done so as to minimize the potential for future impairment but are also approved contingent on vested and senior appropriator's rights being satisfied. Our approvals are thus a permission to use the water until such use interferes with the rights of a vested right user or senior appropriator. A requirement that our consideration of impairment in our approval processes determine that NO future impairment would EVER occur would lead us to routinely deny the majority of applications and cross purposes with the KWAA's intent to make water available for appropriation. In summary, the "yes" becomes "no" when we have a complaint and our investigation finds that the junior use is interfering with the senior use of the water.

Kansas Dept. of Agriculture, 12/10/2015

US FWS “Conditions on potentially acceptable solutions”, Dec 2016 1. Quantity - The impaired amount is already determined by the impairment report, so the combined remedy actions should be able to deliver a capacity of 5,000 AF. 2. Quality - water should be equal or better quality than what is being received currently. 3. Deadline or Timeline Based - Water delivery remedies should be based on a reasonable schedule of time, and not take years to begin implementation...Timelines for implementation should be identified in the plan. 4. Enforceable Actions - Any planning or proposal put in place must be enforceable, and not voluntary or incentive driven. 5. Minimal Legal Obstacles - Use options and solutions with the least amount of legal and statutory obstacles. Building pipelines and infrastructure on the refuge is big legal obstacle. 6. Augmentation - As the Service has mentioned on many occasions, the use of augmentation could be part of the remedy, but not the entire remedy. The Service prefers to maximize the use of other remedy actions prior to augmentation. 7. Augmentation Location - Any proposal that includes augmentation as part of the remedy would be more acceptable if planned from west of the refuge.