Calibration Status Energy Calibration Stabilities/instabilities

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

1 TPC online  offline calibration November 2002.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
2nd September Richard Hawkings / Paul Laycock Conditions data handling in FDR2c  Tag hierarchies set up (largely by Paul) and communicated in advance.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
1 Status of receivers related activities Damien Prieur University of Pittsburgh 12/01/2010L1Calo Joint Meeting - Heidelberg.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
D. Cavalli, S. Resconi 2 Dec 2008 EtMiss Software updates Jet/EtMiss Meeting D. Cavalli, S. Resconi.
DØ Algorithms Meeting March 9, Leslie Groer Columbia UniversityCalorimeter Online Software Status 1  Examines  Crate Unpacking  Calibration 
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
David Adams ATLAS DIAL: Distributed Interactive Analysis of Large datasets David Adams BNL August 5, 2002 BNL OMEGA talk.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DØ Algorithms Meeting April 6, Leslie Groer, Columbia Univ Ursula Bassler, LPNHE, ParisCalorimeter Online Software Status 1  Examines  Crate Unpacking.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
L1Calo EM Efficiencies Hardeep Bansil University of Birmingham L1Calo Joint Meeting, Stockholm 29/06/2011.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The ATLAS Liquid Argon Calorimeter: Overview and Performance Huaqiao ZHANG (CPPM) On behalf of the ATLAS Liquid Argon Calorimeter Group.
Check of Calibration Hits in the Atlas simulation. Assignment of DM energy to CaloCluster. G.Pospelov Budker Institute of Nuclear Physics, Novosibirsk,
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
Online Software Status ● Overview ● Recent Changes ● Required Changes ● Desirable Changes ● Upgrade ● Summary Murrough Landon 1 July 2009.
L1Calo Databases ● Overview ● Recent Activitity ● To Do List ● Run types Murrough Landon 4 June 2007.
Online Database Developments ● Overview ● OKS database status and plans ● COOL database developments ● Validating calibrations ● Tools ● Summary Murrough.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
L1Calo Operations Summary
ATLAS Tile Calorimeter Data Quality Assessment and Performance
First collisions in LHC
Rainer Stamen, Norman Gee
Monitoring of L1Calo EM Efficiencies
Calorimeter Status Electronics Installation and Commissioning
Tracking Students Throughout the Scholarship Season
Online Database Work Overview Work needed for OKS database
on behalf of ATLAS LAr Endcap Group
L1Calo Requirements on the DPS
Run Control (and Other) Work
MINERVA Z Mass Exercise
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
Online Database Status
Online Software Status
Conditions Database Current conditions folders Proposed new folders
Online Software Status
Recent Online SW/DB Changes
Online SW Readiness (or not)
Online SW, DB & Calibration
Online Software Status
Remaining Online SW Tasks
Level 1 (Calo) Databases
Cabling Lengths and Timing
L1Calo Operations Summary
Online Software “To Do” List
Level-1 Calo Monitoring
Joint Meeting Wrap-up I’ve cheated Partially justified?
Current status Minjung Kim
J. Rutherfoord & P. Schacht 17 May 2004
VELO Software Update TELL1 Algorithms Error analysis
Laser Software Status and Comments on Concerns
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
Status of the Calibration
Presentation transcript:

Calibration Status Energy Calibration Stabilities/instabilities Murrough Landon 29 June 2011 Energy Calibration Stabilities/instabilities …of gains & databases Tools And what we are still missing Summary

Updates of Gains Only one complete gain update this year (18 March) Details in talk by Juraj in Cambridge: https://indico.cern.ch/getFile.py/access?contribId=6&sessionId=0&resId=0&materialId=slides&confId=120126 Since then aiming to keep the calibration stable Cross checks with physics runs suggests we have it ~right At least in most places Few subsequent changes in limited areas EM overlap region gains updated after timing changes But now Barrel component gains from pulser are 10- 30% “too high” Comparison of Calo/L1Calo in Physics runs suggests lower gains We are unintentionally making (variable) dead material corrections! Channels where HV known to have changed About 40 channels, all in EM layer, changes from 10% to factor of 2

Comparison with Data: Looks Good!

Updates of Understanding (1) Twice we thought we needed more gain updates Both times we were wrong Finding out why has taken about 40 emails with LAr experts To whom many thanks for their patience and careful answers! April: drifts of ~10% were observed in 20-30 towers But without any known HV changes We did not change gains because we didnt understand this It was due to a change in the LAr database We were automatically picking up an old version (without warnings) The new DB has additional cells marked as dead or noisy These are zeroed in the calculation of LAr tower energy Even if only slightly noisy But are still active in the trigger => inconsistency!

Drifts in HEC towers

Updates of Understanding (2) Recently: moved to Athena 16.6 Saw big gain changes: 20% in FCAL, 5% in EMEC EM layer gains: (Right – Wrong) / Wrong: Scale +/- 10% Hadronic layer gains (Right – Wrong) / Wrong: Scale +/- 50%

Updates of Understanding (3) Again an issue with the LAr database Some folder names (or tags) were changed A rare occurrence but needing manual update of job options Now changed to the new folders Gains back to square one (ie March values) Meanwhile we (or at least Juraj) learned many things We must check we use correct pulser->physics corrections in LAr We should think about the treatment of noisy cells We have to pay attention to many many LAr details which we had hoped we could take “out of the box” All this has diverted attention from (a) TileCal and (b) work on tools

Updates of Timings More details from Valerie Summary of changes: General timing update in early 2011 Few towers changed by more than 1-2 ns Updates of LAr TBBs and L1Calo timing in EM overlap Large (10-20 ns) changes of barrel component Got it wrong first time round, second attempt cross checked by Damien and Katy Seems OK in data But would be good to check with another special run

Updates of Timings: LAr EMEC TBBs EMEC TBB delays: In May, LAr changed the relative timing of front (strips) layer (by 3 ns) compared to the rest in TBBs for the EMEC No adjustment in L1Calo yet: pulse shape will change slightly as strips have ~20-30% of the energy (middle layer timing was not changed)

Tools We Have & Progress Made Smooth operational schedule Runs taken by calorimeter shifters Automatic analysis of runs At point 1 for standalone DAC and pedestal runs At the CAF for calibrations with LAr and Tile Summaries and plots available quickly on the web: P1: https://atlasop.cern.ch/l1calo/CalibRunsP1.php CAF: http://cern.ch/atlas- l1calo/calib/CalibRunsCAF.php Machinery generally works smoothly And now also have CAF testbed at Birmingham (thanks to Pete) Full receiver mapping Two receiver channels per tower for FCAL23 & EM overlap Now have procedures for calibrating those gains separately

Tools in Development (1) L1Calo calibrations taken by LAr and Tile shifters Will merge to single Calo shifter from August(?) L1Calo GUI tool being extended to take all Calo calibrations in parallel Current L1Calo panels moved to “Subdetector Views” Default: click “Do All” button for appropriate weekday Tile added successfully LAr and LUCID still to come...

Tools In Development (2) Tracking of HV changes Store HV status for each run in sqlite file HV plots in monitoring of physics runs Compare HV status now with that of last calibration update But still needs CAF results to be transferred to online DB Better CAF plots Clearer display of gain changes

Developments Needed (1) [from March] Tower builder board (TBB) delay database LAr still has a single set of TBB delays (text files) Physics & calibrations need different TBB delays Only solution up to now: Overwrite physics delays before doing a calibration Overwrite them again afterwards with the correct Physics delays Somewhat hazardous... Risk of taking next ATLAS stable beams run with wrong delays if the calibration is aborted without the correct delays being restored Longstanding request to LAr SW experts to improve this! Plan is to put separate physics & calibration delays into COOL LAr aiming to do this by mid April [now mid July – before Paolo goes] Until this, “shifter” calibration needs expert oversight

Developments Needed (2) [from March] New version of calibration results folders? Outputs of calibrations are stored in “Results” folders Separate folder for each type of calibration These are single version folders, indexed by timestamp Time stamp is just when the results were uploaded Not when the calibration run was taken Better to have multiple version folders, indexed by Run/LB Time stamp would always be the calibration run number Could upload new versions of results for the same run This would need: Changes to various software tools Complete new set of folders Suitable time to make the change (not while running)

Developments Still Needed (3) Monitoring for pulser runs Extra automatic plots from CAF analyses to show problems CAF results need to be transferred to online DB Monitoring of trends of calibration results Another long term wish list entry Analysis of pulse shape in pulser and physics runs Plenty of ideas exchanged about physics “PHOS4” scan Development of software has started More attention to TileCal Correlating gain changes with known issues

Open questions Dead material corrections In some deliberate scheme Rapid response to HV changes? Understanding of “ADC droop” Talk by Yuriy?

Summary Calibration most fairly stable during this years run Although databases in constant flux! Progress with tools and understanding Regular Wednesday morning (technical!) phone meetings Good communication with LAr and Tile experts Next L1Calo/LAr/Tile calibration workshop 12 July https://indico.cern.ch/conferenceDisplay.py?confId=14 3303 But there are still many things to do... So if you need an ATLAS qualifying task, just ask Juraj!