System layout in PS ring and possible evolution

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
G2P Target installation and Beyond. Schedule Pivot before.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
LIGO-G W Performance of the LIGO I PSL at the LIGO Hanford Observatory Rick Savage LIGO Hanford Observatory Laser Zentrum Hannover November 15,2000.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Given Connections Solution
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Electricity Calculating Electric Power When installing new appliances, equipment, tools, or any type of electrical convenience, it is important to know.
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
A longitudinal damper for the PS (preliminary ideas) 24 April 20121M. Paoluzzi BE/RF.
Electricity, Electronics And Ham Radio “Kopertroniks” By Nick Guydosh 4/12/07.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
RF and Transverse Dampers Current Systems Wolfgang Hofle W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Acknowledgements: RF.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
An Inductive Pick-Up (IPU) for Beam Position and Current Measurement
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Brief summary of Finemet Review 9-10 September S. Gilardoni.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Measurements and potential improvements of the amplifier for the 10 MHz cavities G.Favia, V.Desquiens, M.Morvillo.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
CDMS II Shielding To Installation To Construction From Design.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Summary of discussion on isolating flanges E. Shaposhnikova With input from LIU-SPS BD WG (in particular H. Bartosik, F. Caspers and J. Varela), K. Cornelis,
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Report Technical Director Storage-Ring-Installation Completed
Challenges of Dual Harmonic RF Systems
ABB i-bus® KNX Valve Drive Actuator VAA/A
Injectors BLM system: PS Ring installation at EYETS
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
10 MHz amplifier status G. Favia
WP02 PRR: Master Oscillator and RF Reference Distribution
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Pierre-Alexandre Thonet
Upcoming longitudinal MDs
Electronics: Demod + 4Q FE
LLRF and Beam-based Longitudinal Feedback Readiness
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
Technologies Teacher Answers to Practical Activities 1-3
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

System layout in PS ring and possible evolution Finemet Review M.Haase September 14th - 2015

PS longitudinal damper cavity in SS02 The Cavity Need no modification The Gap Relay circuit and Overvoltage protection circuit. Need to redesigned Cavity Structure Need no modification Amplifier support Need to redesigned For the New Improved Plug in amplifier

Gap relay circuit and Overvoltage protection circuit We have indicated the following problems: High beam induced voltage observed around 40 MHz. Passive gap monitor has a resonance at 40MHz. Instead we use the active gap monitor. Gap Relay efficiency is not good enough. PRESENT CIRCUIT

NEW IMPROVED AMPLIFIER PRESENT INSTALATION NEW AMPLIFIER We use the same new plug in amplifier as provided in the PSB

NEW: AMPLIFIER DOCKING STATION In the amplifier support we need: New water distribution to the amplifier New cabling to connect the amplifier New 40V (amplifier) & 25V (driver) connective system PRESENT AMPLIFIER SUPPORT

The shielding works very well to protect our amplifiers for radiation issues But the access to the amplifiers is very difficult! The shielding is done with iron brick L10cm x W10cm x H20cm weight ~15kg Total ~500kg The solution we design a shielding wall that we can open the wall like a paddle to simplify the access to the amplifier

Additional changes are necessary Installing of new control cables for the plug in amplifier from Building 151 to the Ring ~70m. Additional a 25V Driver cable and some spare cables Replacing the Control chassis and control electronics with the improved version.

Additional changes are necessary WATER DISTRBUTION Improvement of the exist main water distribution, to handle better the water consumption for the plug in amplifier and cavity. (Pressure reducer and water flow detector)