Implementing Finishing Job of Building

Slides:



Advertisements
Similar presentations
FLOOR FINISHES Screeds Terrazzo (in-situ type) Ceramic Tiling
Advertisements

Materials And Construction Technology PALESTINE UNIVERSITY Chapter No. 6 Tiling.
DECORATIVE SINGLE COAT PLASTER FOR MARBLE CHIPS CLADDING SYSTEM ( PEBBLEDASH )
Brief Introduction of 3D Construction System
Carpentry Skilled Trades 1201 Footings and Foundations.
Class Day Thirteen. Chapter 9 Stone & Concrete Masonry.
EXAMPLE QUESTIONS According to their sizes, aggregates are divided into 2 main groups, write down the names of these groups and give one example for each.
Construction Methods and Materials Masonry Masonry.
After the foundations have been completed the walls are set out and construction commences. wall structures.
FOUNDATION Meeting 2 Study Program: S0673 / Building Construction II Period: 2007.
University of Palestine Industrial Engineering Department Materials And Construction Technology Chapter (2) Blocks And Stone works.
CONSTRUCTING A FIVE CABIN LATRINE
ARCH 243 CLADDING OF WALLS. CLADDING / VENERING OF WALL SURFACES PLASTER STONE CERAMIC –BRICK METAL GLASS PLASTIC WOOD.
Construction Materials Unit 2.1 CONSTRUCTION AGGREGATE.
Choosing the Right Siding When selecting siding, there are six basic issues to consider: 1. Water Resistance. Water-resistant types of siding will have.
REINFORCED CONCRETE AND IRON RESTATING. Meeting 12 Study Program: S0673 / Building Construction II Year: 2007.
Intro to Concrete 18.0 & 19.0 Class notes.
The Roman Arch. AQUEDUCT TRIUMPHAL ARCH VILLA TEMPLE.
FORMS, SCAFFOLDING and STAGING
MASONRY.
When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house.
The temple-pyramids were one of the Mayans most impressive achievements. The massive stone structures were built in the heart of Mayan cities. Mathematical.
FOUNDATION ELECTRIC POLES
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
ALPHA COLLEGE OF ENGINEERING AND TECHNOLOGY
Technological And Engineering EXPLAINS ERECTION PROCEDURE OF TIMBER BENCH AND RAILING TIMBER.
ENGINEERING PLUMBING AND SANITATION Applies Fire Company of Plumbing System.
Arranging Bugdget Plan of Construction Cost (RAB) Calculating construction RAB of House Building, water building and Bridge By: SMK NEGERI 5 SURAKARTA.
Make door frame, doors and windows Explain the procedure door frame assembly, doors and windows Technology and Engineering Technical Timber Construction.
COLLEGE OF AGRIL. ENGINEERING & TECHNOLOGY
IMPLEMENTING CONTRUCTION MEASURING
Teknologi Dan Rekayasa
APPLYING THE BASICS OF PICTURE TECHNIQUE
Making picture of construction applying.
Competency: Repairing of CD Player
Identify House Building Science
IMPLEMENTING SCAFFOLDING JOB
Identifying House Building Science
Teknologi Dan Rekayasa
DOING WELDING, THERMAL CUTTING AND WARMING
Making Picture of construction Application
Using Hand Tools and Electric on Stone and Concrete Construction
CLADDING / VENERING OF INTERIOR AND EXTERIOR WALL SURFACES WITH MASONRY STONE CLADDING BRICK CLADDING.
Understanding Material of Building
Technology And Engineering
IMPLEMENTING PRE MOULDED CONCRETE JOB
BRICKS.
Identifying House Building science
Making Picture of Construction Application
Applying Building Material Checking
Subject : Building Construction
Itroduction Types of bricks Classification of bricks Bonds
IMPLEMENTING JOB OF BUILDING FINISHING
DAMP-PROOFING AND WATER-PROOFING COURSE
Water - Cement Ratio.
Arranging Budget Plan of Construction Cost (RAB)
Arranging Budget Planning of construction cost (RAB)
SeminAR ON LINTELS --SANTHOSHKUMAR.M..,.
PPT PROCEDURES TO INSTALL PAVERS
Civil Engineering Materials
MATERIALS AND CONSTRUCTION I
Building Construction I Sofia Sebastian 1
Warm Up Problem of the Day Lesson Presentation Lesson Quizzes.
Student: xxxxxxxxx AEC 204 Lab December 5, 2006
Using the Rilem Test Contents: Surface Preparation: Test Procedures:
TECHNICAL SPECIFICATION AND REQUIREMENTS
R.G.G.P (NARWANA) Power point presentation of Building construction
Subject: Civil Engineering Material Program : Civil Engineering Year/Part : II/I Class Load : 2 period/week By: Assistant Professor, Er. R.P. Neupane.
Presentation transcript:

Implementing Finishing Job of Building Implementing Brick arrngement By : SMK Negeri 5 Surakarta

GOALS OF LEARNING : Student can identify kinds and size of bricks. Student can explain kinds of brick construction. Student can make profile of brick arrangement. Student can make stirring Student can do arrange of brick. Teknologi dan Rekayasa

REQUIRES OF BRICK ARRANGONG JOB MATERIAL MUST BE QUALIFIED. Sand must be filtered, the equpment fot stirring must be plastic. Brick arrange is not BAREH Brick arrangement is on sturdy ground. Water which used for mixing must enough The bricks arrangement must be more than 30 cm on the sloop , there is water resistant layer Wall arrangement must be HIGROSKOPIC Every large of 10 m2, installed practice column (Every distance of 2-3 M) 8. Maximum height of arranging every day is 1 meter. (If it is added calcite) , 1.5 M if the mixture is without calcite Brick stand erectly and flat. Teknologi dan Rekayasa

STAGE OF INSTALLING JOB OF WALL/BRICK Material Preparation Profil Preparation/Measurement stick/Measuring Mixture making Watering brick Installing Brick Exactness controll Teknologi dan Rekayasa

WALL ARRANGEMENT Quality : hardness ,Strength pressure same colour, Corner Sharpness, flat surface, same size DIMENSION : Thick = 52,5 mm Width= 115 mm Length=23,5 mm Sand (filtered in 3 mm)

KINDS OF MATERIAL OF WALL INSTALLING SUPER BRICK TRADITIONAL BRICK CEMENT STONE LIGHT CONCRETE BATAKO / CON BLOCK NATURAL STONE Teknologi dan Rekayasa

EXAMPLE OF QULIFIED BRICK Teknologi dan Rekayasa

2. PROCEDURE OF iNSTALLING A. Mixture Making * Work system  manual  use mixing tool * Mixture ratio  1 Pc : 1 Kpr : 8 Ps  1 Pc : 2,5 - 3 Ps  1 Pc : 1 Dol : 7 Ps  1 Pc : 7 Ps  Bahan dry mix * Mixing must be plastic Teknologi dan Rekayasa

IN BOX MIXING Teknologi dan Rekayasa

C. Elbow D. even E. flatness Teknologi dan Rekayasa 10

USING STEM WATER PASS Teknologi dan Rekayasa 11

PLACING MORTAR AND TAKE THE REMAIN Teknologi dan Rekayasa 12

TRADITIONAL BRICK INSTALLING String K3 PROFIL Mixture Box K3 Teknologi dan Rekayasa 13

B.Spesi * Horizontal Spesi  Thickness 1,5 cm  fully filled  good binding * Vertical spesi  Thickness 1cm  Shifted 1/4 of brick, ½ of brick  flly filled  neat Teknologi dan Rekayasa 14

THE FORM OF SURFACE ON BRICK ARRANGEMENT Vertical position horizontal Teknologi dan Rekayasa 15

3. The Exactness of Brick Arragement A. Size B. Stand Erectness * Waterpass min1.00 M * Lot BENANG UNTING-UNTING Teknologi dan Rekayasa 16

EXPOSE BRICK CONSTRUCTION Teknologi dan Rekayasa

SUPER BRICK ARRANGEMENT WITH STRAIGHT ROLLAX Teknologi dan Rekayasa

INSTALLING SUOER BRIK WITH CURVE ROLLAX Teknologi dan Rekayasa

I BRICK EXPOSE CONSTRUCTION Teknologi dan Rekayasa

BRICK EXPOSE TRADITIONAL ARRANGEMENT Teknologi dan Rekayasa