Mactaquac Project George Porter July 17, 2016.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

Working Groups launch. Today What a Working Group is How they will operate What work they need to do Finalise the Working Groups Get you to sign up and.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
Energy National Policy Statements Nick Cooper DECC.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Chapter 1 Infrastructure Management System. Managers and engineers need clear guidelines for life- cycle management of infrastructure systems for water,
City of Edmonton Strategic Approach to Environmental Management Office of the Environment.
A division of Holcim (Canada) Inc. Public Information Session Proposed Extension of the Acton Quarry May 5, 2009.
The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.
SWRR on the Potomac Rhonda Kranz and John Wells Sustainable Water Resources Roundtable April 25, 2006 Measuring the Sustainability of Water Management.
Columbia River Treaty Review British Columbia Perspective Northwest Hydroelectric Association 2013 Annual Conference Portland, Oregon February 20, 2013.
The Federal Resource Management and Ecosystem Services Guidebook Federal Resource Management and Ecosystem Services Guidebook nespguidebook.com ASSESSMENT.
An Update 1 August 4,  The proposed hydro generating station at Bala Falls remains front and centre as an issue of concern to residents and cottagers.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
Improving Lives, Communities and the Environment Through Natural Resources Conservation.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
January ‘06Advice to Minister1. January ‘06Advice to Minister2 Understanding Climate Change Climate Change Action Plan Elements Climate Change Action.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Sample Codes of Ethics in Adventure Tourism
Corporate Ecosystem Valuation (CEV) Road Test Case Study: Lafarge May 3, 2011.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Condition of Forests in San Diego County: Recent Conifer Tree Mortality and the Institutional Response Presented by California Department of Forestry Mark.
HUMBOLDT BAY SEA LEVEL RISE ADAPTATION PLANNING PROJECT Funded by the State Coastal Conservancy Aldaron Laird Project Planner.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Planning Commission Ian Macek May 26, 2016 Freight Master Plan.
Woodford Neighbourhood Forum 1. 2 This presentation is a brief summary of the work of WNF. It is supported by two circulated documents The Annual Progress.
Our goal for today To gather broad, values-based input to inform future decisions about fish passage at Mactaquac Generating Station. Your feedback today.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Planning Explained Module 4 – Engaging with Neighbourhood Planning.
Chapter 4 Assessment.
Progress Briefing - Energy Initiative
Allington Waste Management Facility
Manchester Master Plan Committee (MPC) Planning Framework
New Economy Breakfast Briefing 6 December 2016
DESTINATION PLANNING AND DEVELOPMENT 1
Phase 2 Hope Bay Belt Project
MADRID – BOSTON PROPOSAL PHASE 2 OF THE HOPE BAY PROJECT
Development Charge Public Meeting October 23, 2017
ASCSN… #SalmonSchoolScotland
INAC Water and Wastewater: Discussion on Current Policies and Processes Presented at: Circuit Rider Trainer Professional Association’s Annual General Meeting.
Potholes Supplemental Feed Route Project
Phase 2 Hope Bay Belt Project
John Martin Reservoir Master Plan Revision
Utilities Department Wedgefield Water November 28, 2017.
Shaping the future of Laverstock and Ford Parish
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Washington County Parks and Open Spaces
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
2017 BCGWA Regional Meeting Environmental Flow Needs (EFNs)
Research Proposal January 1, 2013 Consulted books
Severn Tidal Power Feasibility Study
Integrated Bilateral Agreement (IBA) 2018 to 2028
DG Environment, Nature Protection Unit (D3)
Dams Helpful or Hurtful?.
Capital Improvement Plans
Photovoltaic Systems Engineering Utility Scale Development:
URBAN TRAIL PROJECT UPDATES
Mary River Project Phase 2 Proposal Freshwater Environment
Brackish Water Desalination Project Draft EIR
Scottish Government Responsible for environment & flooding issues
Responding to Changing Climate Washington State Department of Ecology
Pre-Proposal Conference March 27, 2019, 1:00 p.m.
Manilla Low Level Crossing Project
Bannock County Comprehensive Plan
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Lower Laguna Madre Estuary Program
Presentation transcript:

Mactaquac Project George Porter July 17, 2016

Mactaquac Generating Station operational since 1968 provides 20 per cent of peak energy needs in New Brunswick annually produces electric energy for approximately 12 per cent of New Brunswick’s homes & businesses (2020 renewable requirement of 40%) provides essential services to support a safe and reliable power grid (regulation, load following, reserves, black start, etc.)

The AAR problem at Mactaquac Alkali-Aggregate Reaction (AAR) causes expansion of the concrete Hundreds of stations affected worldwide Various techniques are used to address effects of expanding concrete Mactaquac currently is expected to reach the end of its life by 2030

The future of Mactaquac could be … Repower, with a new powerhouse, switchyard, fish passage facility and spillways. Retain the Headpond, with new spillways and a new fish passage facility. Restore the River, by removing all existing structures, including the earthen dam. Life Achievement, extending operation of the existing concrete facilities beyond 2030.

What is Life Achievement? Continued operations beyond 2030, perhaps to original lifespan. Detailed modelling suggests concrete’s structural integrity better than previously understood. Consistent with ongoing tests of concrete samples from station. Requires ongoing work and investment. Require mechanical and electrical equipment in the station be replaced due to age and wear.

What next? No decision has been made. Refine analysis and business case of all options. Business case is a work in progress as we gather estimates related to construction, environmental, social factors. Each option is expensive. There is no low-cost option for Mactaquac.

Durable decision What we are doing to gather information for a durable decision: Comparative Environmental Review Social Impact Comparative Review Engineering Mactaquac Aquatic Ecosystem Study First Nations Engagement Public Engagement

Repower footprint

River restoration

River restoration Residential Water Wells (~700 locations) Regulated Water Intake Extensions (~10 locations) Dust Control Measures (~11 locations) Wastewater Outfall Extensions (~14 locations) Culvert Replacement (~25 locations) Surface Water Management (~133 locations) Shoreline Protection (~11 locations) Shaping and Grading Slopes (~22 locations) Potential Land Exposed (~ 54 km2 (13,350 acres))

See http://canadarivers-gis.maps.arcgis.com/home/index.html Mactaquac Aquatic Ecosystem Studies Three themes in this work by the Canadian Rivers Institute Whole River Ecosystem Studies Fish Passage Environmental Flows See http://canadarivers-gis.maps.arcgis.com/home/index.html

Comparative Environmental Review Atmospheric environment Acoustic environment Surface water Groundwater Aquatic environment Vegetation and wetlands Wildlife and wildlife habitat Economy and employment Human occupancy and resource use Infrastructure and services Transportation Heritage resources Current use of land and resources for traditional purposes by Aboriginal persons.

Social Impact Comparative Review Social issues associated primarily with construction activities include: nuisance effects (noise, vibration, dust, odour) transportation effects (access, traffic, safety, road wear) community services, infrastructure and housing land acquisition employment, expenditures and businesses

Social Impact Comparative Review Social issues identified that relate primarily to the headpond drawdown include: community identity changes to recreational uses view shed changes property value impacts reduced river access exposure of lands intakes and outfalls impacts changes to water supplies/private wells ice damage to downstream infrastructure potential downstream flooding from ice jams

Discussion paper Purpose: to help New Brunswickers understand the kinds of choices ahead and create a shared understanding of the potential risks and benefits of each Key considerations Energy Policy Financial Considerations Replacement Services External Factors Risk NB Power must seek a best-cost solution that meets safety, reliability, environmental and financial goals.

Overview of New Brunswick First Nations There are 15 First Nations communities in New Brunswick: 6 Maliseet (Wolastoqiyik) communities which are situated along the Saint John River and 9 Mi’kmaq communities which exist along the eastern and northern coasts. According to Indian Register (August 31, 2012): 14,525 First Nations people live in New Brunswick; 9,052 (62%) live on-reserve; 5,473 (38%) off-reserve

First Nations engagement activities Corporate Aboriginal Affairs department First Nations engagement strategy with Dillon First Nations expertise on environmental advisory committee First Nations Liaison/Field Monitor First Nations representation on Community Liaison Committee NB Power funded activities for 6 Maliseet Communities of NB Consultation protocol development Traditional Knowledge/Traditional Land Use study Technical analysis of comparative environmental review

Quick review Topics the public can influence Topics the public cannot influence Common values identified during engagement process will be reflected in option selection How we engage with New Brunswickers (process and techniques) New information uncovered during engagement process will be considered Continued provision of safe, reliable electricity at low and stable rates Compliant with environmental regulations A decision must be made by 2016 Respectful of First Nation’s rights and interests

What we are asking about How important are the following considerations to you? Cost to New Brunswickers Potential economic activity Community impacts The environment (existing and future) Sources and costs of renewable energy

Public engagement

Public engagement numbers The following statistics provide an indication of the volume of engagement activity NB Power open houses: 7 Number of people who attended: 950 Mactaquac.ca updates (news releases, blog posts, reports): 20 Phone calls, emails, presentations and meetings: 282 ‘Mactaquaction’ survey responses: 7,821 Facebook visits to Mactaquaction.ca: 27,223 Vimeo views of Mactaquaction videos: 15,180 Stakeholder and community dialogue sessions: 4   After the May 31 closure of the public feedback period, a “what was said” document will be compiled and will provide a summary of the feedback received.

What New Brunswickers have been saying Connection to landscape as it is now ‘we adapted, don’t make us change again’ Concern about property values, water views, recreational use of headpond, what lies beneath the headpond shorelines Recognition of hydro as green energy, valued as a domestic supply Desire for improved fish passage, species protection Some support for dam removal ‘the river was beautiful before, and it can be again’ Questions about cost/benefit of rebuild ‘Can a new station pay for itself?’ We will want you to explain the rationale for your decision

Detailed Design & Site Work for Preferred Option Project timeline Decision gate 2016 Decision gate 2019 Study Options: Repower Retain the headpond River restoration Due Diligence Studies Acquire Approvals for Preferred Option Detailed Design & Site Work for Preferred Option End of service life 2030

Questions? If you or your group would like more information about this project, or would like to share your point of view, please contact us. By email: mactaquac@nbpower.com By phone: 1-866-754-7727 Online: www.mactaquac.ca