Bunch-by-bunch feedbacks and Low Level RF

Slides:



Advertisements
Similar presentations
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
Yu. Artyukh, V. Bespal’ko, E. Boole, V. Vedin Institute of Electronics and Computer Science Riga, LATVIA 16th International Workshop on Laser.
Using FPGAs with Embedded Processors for Complete Hardware and Software Systems Jonah Weber May 2, 2006.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
WAO 2007 Andrej Košiček Dealing with the Obsolescence in state-of- the-art Electronic Components 27 September 2007.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Font 4 Review Digital Feedback System BPM Analogue Processor Digital Processor Feather Kicker Power Amplifier Pick up StriplinesKicker StriplinesBeam.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
Feedback for CESR TA Michael Billing May 17, 2007.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
Initial Performance Results of the APS P0 (Transverse Bunch-to-Bunch) Feedback System N. DiMonte#, C.-Y. Yao, Argonne National Laboratory, Argonne, IL.
January 19, 2006PEP TFB R.Akre PEP II Transverse Feedback System Ron Akre William Colocho Anatoly Krasnykh Vojtech Pacak Dmitry Teytelman Uli Wienands.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
Digital Phase Control System for SSRF LINAC C.X. Yin, D.K. Liu, L.Y. Yu SINAP, China
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
BPM stripline acquisition in CLEX Sébastien Vilalte.
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
Feedback System Design Alessandro Drago SuperB Meeting January 2000 SLAC.
Digital LLRF plans at the Australian Synchrotron P.Corlett, K.Zingre, G. LeBlanc Australian Synchrotron, 800 Blackburn Road, Clayton 3168, Victoria, Australia.
LFB, LLRF, TFB update Alessandro Drago XIII SuperB General Meeting Isola d’Elba, 5/30-6/
Feedback Systems Update Alessandro Drago SuperB General Meeting Perugia June 2009.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Injector II Low Level RF & Interlock – Status
RF acceleration and transverse damper systems
Dither Luminosity feedback versus Fast IP feedback
LCLS_II High Rep Rate Operation and Femtosecond Timing
SLAC I&C Division / EE Department
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
LLRF Research and Development at STF-KEK
Working groups status report on Feedbacks
Feedback systems and Low Level RF
ATF/ATF2 Control System
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
Feedbacks for low emittance accelerators
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
PADME L0 Trigger Processor
MPGD Detectors and Electronics at CIAE
Data Acquisition System for Gamma-Gamma Physics at KLOE
P. Forck, P. Kowina, M. Schwickert, R. Singh
Ongoing R&D in Orsay/Saclay on ps time measurement: a USB-powered 2-channel 3.2GS/s 12-bit digitizer D.Breton (LAL Orsay), E.Delagnes (CEA/IRFU) Séminaire.
Controls CBETA controls will extend existing EPICS control system
M. Mehler1), H. Klingbeil1), B. Zipfel2)
LLRF and Beam-based Longitudinal Feedback Readiness
Intrabunch feedback system development at DAFNE
University of California Los Angeles
Alberto A. Colavita, INFN, TS
LLRF Control System Outline Scope Requirements Design Considerations
Feedback Systems in Circular Colliders
Undulator Cavity BPM System Status
Breakout Session SC3 – Undulator
Presentation transcript:

Bunch-by-bunch feedbacks and Low Level RF Alessandro Drago LNF, 1-4 December 2009

Main topics Feedback design basics 12-bit feedback ready to be tested for the new KLOE runs in DAFNE Low noise longitudinal front-end / back-end ready to be tested for the new KLOE runs in DAFNE FPGA design progress Jitter measurements on Virtex-5 FPGA Models & simulators Low Level RF status Conclusions

SuperB bunch-by-bunch feedback system general considerations Dramatic acceleration of electronic component development, is making obsolete in short time ALL the existing DAFNE and PEPII transverse and longitudinal feedback systems (included the last versions), and SuperB commissioning will start not before 2014 Low emittance beams ask for small impact feedback design From DAFNE tests, we know that it is always possible manage more power in the feedbacks installing as many systems as necessary Indeed we have proved that two separate feedback systems for the same oscillation plane can work in perfect collaboration doubling the feedback damping inverse time New feedback design can’t be just a software porting but it must be based on robustness, flexibility, scalability and innovation, and, as consequence, the digital processing unit (DPU) will be the same for transverse and longitudinal feedback systems New feedback systems needs internal and beam diagnostics tools and the legacy of the previous systems should be carefully implemented with the best compatibility

B-B-B Feedback Main R&D Topics R&D list includes the following upgrade points respect to the previous feedback versions: very low noise analog front end @ n*RF [n=3 or 4 or 6] maintain low cross-talk between adjacent bunches under 40 dB (better 60 dB) in front end Only one pickup for each feedback system digital processing unit with 12/16bits ADC/DAC for high dynamic range feedback loop >=72dB “dual gain” approach to minimize residual beam motion and feedback noise on the beam [to be implemented in DPU] integrated beam-feedback model with easy code and parameter download to DPU 500W vs. 250W power amplifiers dual separated timing to pilot the backend power stage Cavity kickers (for longitudinal systems) and stripline kickers (for transverse systems) for 2.1 ns bunch spacing

Open questions Type and growth rate of instabilities How much power & how many feedbacks are necessary ? Impact of b-b-b feedback systems on ultra-low emittance beams Obsolescence of the hardware (chips) Obsolescence of the project (software maintenance)

Design progress Two converging ways to test the design topics: outsourcing R&D and in-house R&D 1.) outsourcing R&D: an upgrade of the iGP system working at 12 bit (iGp12) will be ready by next March to be evaluated at DAFNE for KLOE runs (two units funded by SuperB 2009 budget) 1.1) the iGp12 is sw compatible with the previous 8bit iGp system born by a KEK-SLAC-LNF collaboration 1.2) longitudinal front-end / back-end will be also ready and tested in the next DAFNE/KLOE run (SuperB budget) 2) in-house R&D: a stand-alone development system, using a XILINX single-board, is under test at LNF (funded by INFN C.S.N.V with the SFEED project) The two approaches are both necessary to evaluate at the best the design parameters versus the real FPGA computing power

DAFNE (2010) bunch-by-bunch feedbacks 2.7 ns bunch 2.7 ns D S Comb gen. 250W 180 DPU 16bit DAC FPGA 12bit ADC 250W/500W AM Phase detector x LP x a*RF 6*RF RF (476MHz) Inj.Trigger LAN Operator interface realtime and offline analysis programs DPU 16bit DAC FPGA 12bit ADC

SuperB bunch-by-bunch feedbacks 2.1 ns bunch 2.1 ns D S Comb gen. 250W DPU 16bit DAC FPGA 12bit ADC 250W/500W AM Phase detector x LP x a*RF 6*RF RF (476MHz) Inj.Trigger User trigger LAN Operator interface realtime and offline analysis programs DPU 16bit DAC FPGA 12bit ADC 180 x Amplitude detector LP 3*RF

Differences between SuperB & DAFNE feedbacks bunch 2.1 ns D S Comb gen. 250W DPU 16bit DAC FPGA 12bit ADC 250W/500W AM Phase detector x LP x a*RF 6*RF RF (476MHz) Inj.Trigger User trigger LAN Operator interface realtime and offline analysis programs DPU 16bit DAC FPGA 12bit ADC 180 x Amplitude detector LP 3*RF

In-house R&D Based on XILINX ML506 with Virtex-5 FPGA Main features The operator interface is based on a Web-Browser through a LAN (1Gbps ethernet) connection (on the contrary in the iGp and iGp12 systems the operator interface is made by EPICS) The external pc, placed inside the iGp box, is not more necessary because Microblaze microprocessor is implemented in the FPGA itself Low cost powerful board, commercially available Easy reprogramming in-house Many tests of the hardware performance are possible because it is not a black box

Web browser Operator interface / I

Web browser Operator interface / II

General Clock Divider (odd part) microBlaze clkout N extCLK CNT mod N = CNT 1+(N-1)/2 en_tff2 FF (toggle) en_tff1 div1 div2 14

Division by 2 done by FPGA by web browser operator interface choice 50MHz input clock 25MHz input clock 25MHz input clock/

FPGA divisions by 3x2 by 4x2 by 5x2

Jitter measurements

Jitter measurements made by high bandwidth (20GHz) oscilloscope TEK 11801A making a comparison between source RF signal and division reasult output signal ~40 ps peak-peak jitter ~5 ps RMS jitter

Models & simulators It is necessary to define power and number of feedback systems: to do this the known data should be inserted in a model/simulator Simulator 1) DAFNE itself Simulator 2) longitudinal beam/RF/feedback simulator, written in FORTRAN, used for DAFNE (in 1992-3) to be revised Simulator 3) instability / feedback simulator, written in Simulink/Matlab Simulator 4) in base at the e-clouds models

Simulator 2) longitudinal beam/RF/feedback simulator, written in FORTRAN, used for DAFNE (in 1992-3) to be revised for the SuperB case Analytical approach Small oscillations Equispaced bunches Equal charge bunches Produce an output tracking for longitudinal oscillation of each bunch

Mauro Migliorati (Roma1 University) has made the porting from the original FORTRAN code running for VAX/VMS to PC/Windows without any problems [November 2009] In principle the program can run on every PC from the Command Prompt windows To start the SuperB simulation, we need machine parameters and the PEPII Cavity High Order Modes, then check if the approximations in the code are enough good

.FOR  source files .inp  input files .exe  executable file .out  output file .dat  tracking data files Compiler: G77 for Windows Cygwin1.dll library for windows interface

cav-mac.inp  cavity-machine input data file

.out output file

Easy file.dat data plot by MATLAB

Low Level RF status obsolescence of the old PEP-II subsystem is obvious up to now we have considered two very different ways to implement this subsystem 1) Dimtel Inc. & Larry Doolittle approach consist in design a LLRF board to be so flexible to cope with “any” unknown specifications 2) in the second approach, LPSC [ Laboratory of Subatomic Physics and Cosmology] - IN2P3/CNRS laboratory in Grenoble/France (O. Bourrion & C. Vescovi) is ready to start a design after some knowledge of specifications. They are currently working on the LLRF of CNAO (Pavia, Italy) system that should become operative in next months CNAO RF specifications are not very similar to the SuperB ones At the present we need to write of the subsystem specification or, at least to have an idea of them, to go ahead

Conclusions Much work is in very quick progress for the bunch-by-bunch feedback Next DAFNE runs will be important to evaluate what is still necessary for the final b-b-b feedback implementation Some work on the longitudinal simulator can start just from now LLRF design is waiting for spec’s