Beam diagnostics from GSI

Slides:



Advertisements
Similar presentations
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Advertisements

TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
CCC Meeting Cryogenic Current Comparator in the FAIR Project Overview of FAIR / current status Beam diagnostics work package Tasks and installation locations.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
The Stripping Foil Test Stand in the Linac4 Transfer Line
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
BPM stripline acquisition in CLEX Sébastien Vilalte.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
ORNL is managed by UT-Battelle for the US Department of Energy Low Level RF Status and Development Activities at the Spallation Neutron Source Mark Crofford.
Peter Spiller MAC meeting Time Schedule SIS100 1.
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
SESAME TL2 and SR Diagnostics
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
"North American" Electronics
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
RF acceleration and transverse damper systems
Oleksiy Dolinskyy December 1st, 2014
A Flexible Open Source Electronics System for Radiotracer Imaging
Diagnostic & Control Status
MICE RF System Power Supplies, Control and Monitoring Status report
Integration of the e+ elements
Jorge Sánchez-Quesada BE-RF-FB
LAPP BPM Read-out Electronics
ATF/ATF2 Control System
Z. Andelkovic, W. Geithner, F. Herfurth, M. Lestinsky, G. Vorobyev
Instrumentation for SPS 2006 restart
How SCADA Systems Work?.
The ELENA BPM System. Status and Plans.
Luminosity Monitor Status
Status of the BI Work Package in the LIU-PSB frame
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
P. Forck, P. Kowina, M. Schwickert, R. Singh
352MHz Klystron Control for the 3MeV Linac test stand
6th BINP-GSI-FAIR workshop
EMC Electronics and Trigger Review and Trigger Plan
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Example of DAQ Trigger issues for the SoLID experiment
UITF MPS system requirements
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
TPC Detector Control System
The Online Detector Control at the BaBar experiment at SLAC
RF Local Protection System
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
ACOE347 – Data Acquisition and Automation Systems
Pierluigi Paolucci & Giovanni Polese
Elettra – Sincrotrone Trieste S.C.p.A.
The LHCb Front-end Electronics System Status and Future Development
UITF Conduct of Operations Review
LIU BWS Firmware status
Status of DESY-PSI-CERN collaboration on development of X-band TDS with variable polarisation: PolariX-TDS Alexej Grudiev on behalf of Polarix-TDS collaboration.
WP13 outsourcing: Hollow Electron Lens
Presentation transcript:

Beam diagnostics from GSI O. Chorniy on behalf of GSI LOBI

GSI LOBI participation in CR BD On GSI responsibility: Cryogenic Current Comparator project DAQ for first turn diagnostics (Screens, SEM) DAQ for current measurements (FCT, CCC, DCT, BLM) GSI supports the In-Kind partners on the following components: Specifications Schottky and BTF for ITEP Russia Coordination of the BPM DAQ for Technodrom, Slovenia Present status Component In-Kind Specs status Cryogenic Current Comparator GSI  to be done Tune BTF Exciter ITEP /GSI Schottky Pick Up approval RGM BINP Scrapers BINP  BLM Detector NN HV supply and DAQ Slovenia/GSI done DC Transformer and FCT   Detector + Vacuum Chamber DAQ Scintillation Screen and SEM-Grid Pressurized air drive and control Beam Stopper BPM Detector (sensor+pre-amplifier)+Vacuum Chamber

DAQ Developments for CR (and FAIR) SCREENS SEM BPM and TUNE BLM, DCT FCT

Scint. screens diagnostics DAQ

Scint. screens diagnostics DAQ CUPID (Control Unit for Profile and Image Data). GUI screenshot during one of the measurements FESA class with input fields from GUI Comissioning this year during beam time at GSI

Scint. screens diagnostics DAQ PLC to control iris: main controller, communication module and switch for satellite connection Camera controller and power source Industrial PC with FESA class running Hardware installation of the PLC system containing two sets of: PLC satellite controller, relay module, DAC modules. Comissioning this year during beam time at GSI

SEM diagnostics DAQ as an option for CR Scheme of SEM grid DAQ and electronics POLAND –PrOfiLe AcquisitioN Digitizer FESA GUI to control the front-end electronics Last beam time: Test of QFW sensitivity limit. Preliminary, direct comparison with theory predictions shows good agreement for detection threshold. Next, to estimate the aplicability of the systems for CR beam condition.

Pneumatic drives control PLC Controller PLC Satellite Six-fold node PA Terminal IEPLC framework (CERN) to generate FESA classes and scripts for PLC Control system for pneumatic drives Concept of the drives control is under evaluation.

BLM and DC measurements DAQ Scheme of BLM system Large Analog Signal and Scaling Information Environment simplifies the observation of the time correlated information. Different presentation tools in GUI Actively used for machine experiments this year at GSI. Example VME crate with SIS3820 multi-scaler boards.

Developments for BLM detector Scheme of BLM system Evaluation of the electronics Rate limitations were investigated with: Laser, U, Au and p beams Preliminary result: Hamamatsu H6427, with a GSI active divider, has the largest gain variation and the best performance at high rates. Measurements with BLM (Scint.type) Response to Au beam at 300 AMeV, 3x107 pps

FCT DAQ Scheme for the FCT DAQ Single board solution for multi-event triggering FCT detector SIS timing time gate generator converter digitized RF signal comparator rate divider trigger pulses ADC trigger single trigger PC Demo GUI with longitudinal phase space tomography VME crate with ADC under development

DAQ for tune measurements Base Band Tune Measurement System (BBQ) VME with ADC in Electronic Room GUI directly shows the tune GUI and the FESA class for BBQ measurements are under development

Organisational topics Specifications for In-Kind partners Schottky (waiting on decision on the type) BTF (started, based on the SIS 18) Specifications for GSI, complete systems: CCC (After prototype tests in Cryring or HTP ?) To clarify soon: Scheme of mechanical part for “pneumatic drive” for First Turn Diagnostics . The role of the BINP in Specifications approval procedure (discussed in October) Review the applications of detectors (for example, clear commissioning scenario) Component In-Kind Specs status Cryogenic Current Comparator GSI  to be done Tune BTF Exciter ITEP /GSI Schottky Pick Up approval RGM BINP Scrapers BINP  BLM Detector NN HV supply and DAQ Slovenia/GSI done DC Transformer and FCT   Detector + Vacuum Chamber DAQ Scintillation Screen and SEM-Grid Pressurized air drive and control Beam Stopper BPM Detector (sensor+pre-amplifier)+Vacuum Chamber The Contract is signed!

Temp

„Test stand“ for tomography Real BPM data loaded to signal generator Oscii for control purposes GUI VME