Tile Upgrade Workshop (CERN- February 2008, 8 and 9)

Slides:



Advertisements
Similar presentations
Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
Advertisements

1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
1 Chapter 5 Sensors and Detectors A detector is typically the first stage of a communication system. Noise in this stage may have significant effects on.
Fiber-Optic Communications
End of phase A meeting CNES (Toulouse) 2/02/2012 Ph. Gorodetzky APC - Paris Diderot1 High Voltage power supplies HV Switches Design: J. Szabelski, J. Karcmarczyk,
Active Dividers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Michel Crouau (Now retired) Dominique.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
B W Kennedy, CCLRC Rutherford Appleton Laboratory VPTs for the CMS experiment B W Kennedy CCLRC Rutherford Appleton Laboratory St Petersburg, 26 April.
1 Light Collection  Once light is produced in a scintillator it must collected, transported, and coupled to some device that can convert it into an electrical.
References Hans Kuzmany : Solid State Spectroscopy (Springer) Chap 5 S.M. Sze: Physics of semiconductor devices (Wiley) Chap 13 PHOTODETECTORS Detection.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
PHOBOS TOF Construction Status
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
9 September 2009 Beam Loss Monitoring with Optical Fibers for Particle Accelerators Joint QUASAR and THz Group Workshop.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Abort Gap Monitoring Randy Thurman-Keup 6 / 8 / 2004 LARP Meeting.
Techniques for Nuclear and Particle Physics Experiments By W.R. Leo Chapter Eight:
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Mechanics and granularity considerations of a Tile hadronic calorimeter for FCC hh barrel Nikolay Topilin/Dubna+ Sergey Kolesnikov/Dubna Ana Henriques/CERN.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
R. Pani Department of Experimental Medicine and Pathology University of Rome La Sapienza-Italy. Flat Panel PMT: advances in position sensitive photodetection.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
Lecture 3-Building a Detector (cont’d) George K. Parks Space Sciences Laboratory UC Berkeley, Berkeley, CA.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
25 juin 2010DPallin sLHC_Tile meeting1 Tilecal VFE developments at Clermont-Ferrand June 2010 Status G Bohner, J Lecoq, X Soumpholphakdy F Vazeille, D.
Performances of the HV system out of Drawers Roméo Bonnefoy, Robert Chadelas, Christian Fayard, Marie-Lise Mercier, Eric Sahuc and François Vazeille (LPC.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
The Tile PMTs From the PMT design studies to the production and QA tests François Vazeille LPC Clermont-Ferrand On behalf of many people who worked on.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
February 10, 2009, G-APD Workshop, GSI Darmstadt1 APD Laser Test Setup Charles University, Faculty of Mathematics and Physics, Institute of Particle and.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Status of Clermont-Ferrand R&D works Tiles session in AUW François Vazeille LPC Clermont-Ferrand ● Mechanics ● External High Voltage Power Supply ● Active.
DEVELOPMENT OF THE POLYSTYRENE SCINTILLATOR TECHNOLOGY AND PARTICLE DETECTORS ON THEIR BASES VLADIMIR RYKALIN IHEP, PROTVINO INSTR-14, NOVOSIBIRSK, 24.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
Discussion on the integrator specifications with comparison of the 3 options Debriefing meeting at LPC, 28 April 2016 François Vazeille  Summary of the.
Answers to Barcelona questions about Mini-Drawers and comments Tilecal upgrade meeting CERN (24 June 2013) François Vazeille on behalf of Roméo Bonnefoy,
in ATLAS and at Clermont-Ferrand
"Drawer Mechanics - MiniDrawer"
Upgrade activities at Clermont-Ferrand
of the High Voltage part of the on-detector electronics
Analog FE circuitry simulation
TileCal issues and Combined Performance
ACTIVE DIVIDER for anode currents up to 10 microamps
Tile Upgrade Workshop (CERN- February and 9)
TileCal upgrade EVO meeting Demonstrator tesks
Concept of Drawers Thoughts on Drawers and mini-Drawers: Small story
Mini-drawers, FE-ASIC , Integrator
Status of Questions and Actions from the meeting of 10/2016
Tilecal week (8 February 2012)
R&D on the sliding comparison of standard and mini-drawers
Status of upgrade works at Clermont-Ferrand
Electricity L1: Circuit Diagrams
Pierre-Alexandre Thonet
Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009)
Instrumentation for Colliding Beam Physics 2017
First noise measurements in the FATALIC option
Directional Optical Module Integration
Department of Physics and Astronomy,
Recent Progress in Large Format PMTs
New developments in photodetection
Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA M. Palm, CERN.
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

Tile Upgrade Workshop (CERN- February 2008, 8 and 9) Optical components: PMT Blocks Tile Upgrade Workshop (CERN- February 2008, 8 and 9) François Vazeille  Two main possible effects must be considered: particle rates and/or radiations. Iron µ metal 3 in 1 PMT and Divider Plastic support Mixer Small pieces  3 components are considered here: - Light mixers. - PMTs + Dividers (since they were optimized with PMTs). and not the 3in1 cards to be reviewed in front-end electronics.  Passive components, such as the Plastic molded supports (NORYL) are not affected by radiations. 1

Light Mixers Present LHC design • Produced (10 000) and tested in the Optical laboratory of the Faculty of Mathematics and Physics, Charles University in Prague. • Shape and dimensions + drawing optimized by Clermont-Ferrand: - Square cross section + length  The best light uniformity on PMT photocathode. - Length  The best PMT location inside the magnetic shielding. - Final drawing  Special corners for the assembly inside the Plastic NORYL support. • Material: Extruded acrylic PMMA (Polymethyl Metacrylate) PLEXIGLASS XT 2270 clear-transparent (92%) with highly UV-absorbing material  To kill Cerenkov effect of direct particles. 2

 Do we need a new SLHC design? • Drawing: No modification … since same magnetic field and same PMTs. • Material Clear-transparency level before starting SLHC? - Natural ageing? - Ageing due to the light effect (Natural light, Fiber light)? - Ageing due to radiation?  Should be measured on some Light mixers after some LHC years. - Light mixers taken in the worst positions. - Needs access to the corresponding Drawers. 2. UV- dopant amount before starting LHC? as above. 3. SLHC effects: increase of above effects - Transparency decreased  Light yield decrease expected. - UV dopant decreased + 10 times more direct particles  More Cerenkov effect expected. BUT HOW MUCH? 3

• Next actions before taking decisions - Measures after some LHC years: transparency and UV-dopant efficiency. Bibliography works about: - Natural ageing. - Radiation effects on PLEXIGLASS. - UV-dopant loss with time and radiation + direct particles. To complete the bibliography study if there are doubts or missing information by experimental tests: • Intense light bath. • Radiation tests. Comment: Remaking the Light mixers and changing them should a very big job! 4

PMTs Present LHC design • Produced (10 140) and tested in 7 Institutes (Clermont-Ferrand, Dubna, Lisbon, Pisa, Urbana, UTA, Valencia) • Design optimized by Clermont-Ferrand + other Institutes (Pisa, Valencia…)  7 years collaboration with Hamamatsu: PMT R7877  8 stages Metal dynode structure with a metal package. Compactness and stray magnetic field effects. Gain (~105) and linearity (over 16 bits, non-linearity < 2% at the upper range). Dark current…  Do we need a new SLHC design? • Very likely no. • Information from long term studies TJNAF (USA): same PMTs working and tested before/after at Clermont-Fd and used again after several working years in true conditions. Pisa results (see next talk. • A maintenance must be foreseen: replacement of bad PMTs. 5

Dividers Present LHC design • Produced (11 000) and tested by Clermont-Fd  45 mm • Design optimized by Clermont-Ferrand + Chicago (2 ground levels): - Optimization of the PMT working: • Gain and linearity. • Impact of additional continuous current (MB events)  See the performances (next slide). - Minimum of cables: direct connections with PMT and 3in1 card. - No sensitivity to radiations: only passive components. 6

• More on design and performances Choice of resistors of voltage divider  driven by the current flow. Applied rules for a pure resistor Divider: • Rule 1: Pile-up events 100 times the mean anode current Worst case of pile-up events: ~2 µA  voltage Divider current of 200 µA. Warning: Current simulations gave 576 nA as maximum current for Layer 1  There would be an additional safety factor of about 4. • Rule 2: Intense pulses Storage capacitors in the last stages to balance the voltage drop due to large current flow. Performances: from the study of a set of 250 PMTs over the 10 140 requested PMTs. Anode current 100 nA 2 µA 5 µA Gain variation ~ 0% > 1% > 2% 7

• Do we need a new SLHC design? The maximum current will go from 2 to 20 µA  The Rule 1 would be no longer satisfied only a ratio equal to 10 between the current flow and the anode current or 40 if we take the simulation value of about 500 nA.  Bigger sensitivity to MB events and worst linearity behavior, in particular for very high energy events (the best expected events!). - That should affect only a part of the cells: close to the beam. - Using the Laser should be a way to recover the linearity HOW MANY CELLS WOULD BE AFFECTED? SHOULD WE ACCEPT SOME NON-LINEARITY? SHOULD WE CHANGE EVERY DIVIDER OR ONLY A FRACTION OF THEM? • Next actions before taking decisions New simulations (or new analyses of existing simulations) in order to know better the MB currents in every cell. To look at deeper the R&D results of tested PMT/Dividers + Test Bench results. To decide what is acceptable from the Physics goals, knowing that the Laser is a useful tool to solve the problem. 8

- If requested, is it possible to make an upgrade? YES from the design point of view Already made at Clermont-Ferrand by Michel Crouau for LHCb, with several solutions considered to increase the gain on the last dynodes: - Booster Divider (Additional supplies on last stages). - Cockcroft-Walton Divider (Oscillator supplied by a LV). - Transistor Divider (Transistors on last stages). Chosen solutions: less components are added. Divider with 2 Transistors Resistor Divider anode anode  500 µA flowing in the Divider is sufficient to deal with a 100 µA anode current. 9

Chosen Divider in the LHCb experiment for the 100 Hamamatsu multi-anode PMTs. Comment: Remaking the Dividers and changing them should be a very big job! 10

First conclusions 11 Component Is this a component which MUST be upgraded? If yes, why? Program? If no, is this a component that, with high probability, will not need upgrading? Light Mixer Likely no Perhaps the material but not the drawing Bibliography Light tests Tests after some LHC years The proposed program will lead to a certitude PMT No See long term tests Detect bad ones Maintenance Divider No if a compromise is accepted, otherwise yes Increased MB current Working/Linearity affected for: • First cells • High energy jets Deep analysis of Tilecal R&D New look of MB simulations Physical goals New design possible A compromise in between decreased performances on some cells and possible corrections (Laser) 11