Train Performance Challenges

Slides:



Advertisements
Similar presentations
Hertfordshire County Council Scrutiny 20 May 2010 Gerard Burgess Partnerships Manager London Midland (D) (ii)
Advertisements

May 3, Northern line upgrade Merton Public Transport Liaison Committee Meeting 26 October 2010.
Beverly A. Scott, Ph.D. MBTA General Manager MassDOT Rail & Transit Administrator Richard A. Davey MassDOT Secretary and CEO GREEN LINE OVERVIEW May 2014.
Metro Today, Main Line Tomorrow Malcolm Dobell, Head of Train Systems Kate Whelan, Lead Systems Performance Engineer SUP ATC.
1 NAT accessibilité  New rolling stock in Ile de France  Regional Structuring Bus Network RIR  Extended provision: night services  New services tramway.
Hugh Chaplain Transport for Greater Manchester / Rail North Thursday 6 th November 2014.
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
A Very Big Experiment Congestion Charging in London Peter Jones Transport Studies Group University of Westminster.
Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.
Presentation to: Inaugural meeting of North East Rail Forum – July 2014 Jerry Farquharson Director of Business Planning First ScotRail.
16 October Transport in Merton Youssef Cockbaine.
Introducing Passenger Focus and local rail services for Peckham Rye Sharon Hedges Passenger Link Manager.
First Capital Connect Hertfordshire County Council Overview & Scrutiny Committee 20 May 2010 Larry Heyman Integration & Partnership Manager.
First Capital Connect St Albans City & District Council Overview & Scrutiny (Public Services) Committee 13 July 2011 Neal Lawson Managing Director First.
Duncan Cross Deputy Director Operations London Overground & Crossrail Crossrail The First Interconnected CBTC Railway in the UK.
Transport for London London Overground Southwark Rail User Group Monday, 17 th November 2008.
Ultra at Heathrow & beyond BASE April 2013 Presentation by Adam Ruddle, Key Account Manager, Ultra Global PRT.
Central London Congestion Charging David Hutchinson GREATER LONDON AUTHORITY International Union of Air Pollution Prevention and Environmental Protection.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
West Anglia Rail Services Hertfordshire County Council Scrutiny Panel 20 May 2010 Geraint Hughes Stakeholder Manager.
Transport Update Chris Carter Transport Strategy Manager.
Putting Luas Cross City in context - Public Transport and Sustainable Measures in Dublin Dublin City Council 21 st March 2013 Gerry Murphy.
First Capital Connect London Borough of Merton Public Transport Liaison Committee Tuesday 26 October 2010.
1 12 February 2014 Martin Turner – Head Of Sales Paul Upton – Business Development Manager Heidi Rowan – Business Development Manager GTMC.
Crossrail 2 London Assembly Regeneration Committee.
Gridlock? – Transport in 2030 Solving Congestion in South East England 14 th November, 2007 Adrian Shooter Chairman, ATOC.
Transforming rail travel in the North Sheffield Chamber of Commerce & Industry Mark Barker Stakeholder Manager Northern Franchise.
Northern Transforming Rail Travel in the North Matthew Worman Stakeholder Manager 11 th April 2016.
29 October 2013 Integrating Public Transport and Land Use Planning Bus Industry Confederation Mark Williams Director, Sustainable Transport Planning Department.
Chiltern Railways providing Access for Oxfordshire Graham Cross Business Development Director.
Aberdeen City Briefing 13 th May Project Scope – Phase 1 Transport Scotland’s specification for delivery by Mar 2019: Half hourly service between.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
Hosted by:. KEEPING LONDON MOVING Garrett Emmerson Chief Operating Officer - Transport for London, Surface Transport Boston University – 7 December 2015.
Scotland Route Utilisation Strategy. Slide 2 What is a RUS? A blueprint for the future of the route  Provides a series of options that funders may choose.
Rail North Manchester Airport Transport Forum
High Speed Rail Some Development Principles
Level Two Supply Chain Management
Public Conference December
Our Purpose Specialists, helping the nation’s travelling public get home everyday safe, secure and on time Our Ambition To be recognised as a vital player.
Red Line Customer Capacity Update
Buses: vital to the local economy
HS2 - What tests should be applied in evaluating the final business case ? Chris Nash.
Improving the Cardiff and Valley Railway
Our Bus Service Konrad Pulé – October 2016.
Operations and Service Concept
LONDON UNDERGROUND.
CIVITAS: The Brighton & Hove Experience
Service Routes and Community Transit Hubs: Right Sizing Transit
Trams.
Quantitative Methods Dr. Aravind Banakar –
Quantitative Methods Dr. Aravind Banakar –
Quantitative Methods
Quantitative Methods
Quantitative Methods
Quantitative Methods
Rail Service Update Peter Jermany Principal Planner (Planning Policy)
Great Western Railway GWR’s Rail Vision and Community Rail
Gautrain System from An Operator’s Perspective
Update on Accessibility and Transport
Network Rail South East Route Performance for NTF 22 October 2014
GTR Class 387 – Great Northern Introduction
16 October 2006.
East Coast Route Study November 2016 update.
Introduction to Micro-Transit / Demand Responsive Transit
Sample ‘Scheduling Process’
Transdev Dublin Light Rail –
COST 335: Ten Years On A Review of Progress
Members’ Workshop Wednesday 17th April 2019 Woodhill House Aberdeen
GEML SOBC GEML Rail Conference July 2019
Great Eastern Mainline
Presentation transcript:

Train Performance Challenges Driver Availability Biggest recruitment and training programme in the UK Extra drivers needed so we don’t rely on overtime and rest days More services to resource at each timetable change. Huge training program for new fleets, services, new depots, routes Takes over a year to train a driver. 250hrs practical training & 840hrs learning theory Since January 2015, we brought in 58 newly trained-up drivers on GN We have a further 80 drivers in training on GN. Hornsey Depot remodelling and re-signalling – 12 drivers a day training Ageing Train Fleet – 40, 35, 28 and 21 years old. New trains – approx. 2,900 days of training planned this year. Network Rail Infrastructure – Good working relationship, improving reliability, significant work undertaken on the Northern City Line. Trespass a rising problem Moorgate – Dec 15 changes recognises growing demand to access night time economy of Moorgate/Old Street area (has been a key aspiration for London Travel Watch) and paves the way for more connectivity when Crossrail opens in 2018. Improves cross-platform access to / from Victoria Line at Highbury & Islington and integration with London Overground Access to Moorgate from about 06:00 – midnight weekdays and at weekends Continued interchange with Kings Cross services at Finsbury Park Gatwick X - 27 brand new trains, 12ct (instead of 10), 2 double doors to allow quicker boarding and alighting, more seats including in the 1 class compartment. 2+2 seating with power points, WIFI, air-conditioning, more luggage space, accessible toilets Moorgate - New fleet of 6-car air conditioned trains to replace the 40 year old Class 313 trains by the end of December 2018 (Air con, RTI) manufacturer yet to be appointed

Improving services and capacity December 2015 – New timetable, Moorgate operating hours extended to run until midnight at evenings and weekends (growing demand for leisure access and interchange with LUL and LOROL services at Highbury & Islington) Fleet Maintenance – Ongoing heavy maintenance works on class 365 units, 317 units and 313 units (Moorgate). Summer / Autumn 2016 – Electrostar trains introduction replacing class 317 and 321 units 2017– Class 700 trains introduced on GN By end 2018 - New fleet to provide increased capacity on the Moorgate line May 2018 Welwyn Garden City / Hertford Line staged increase of off-peak and Saturday frequency increasing to 4tph by December Dec 2018 - Welwyn Garden City: In the peak 2tph to/from Welwyn Garden City operate through central London and additional Hertford and Welwyn to Moorgate peak services. Moorgate – Dec 15 changes recognises growing demand to access night time economy of Moorgate/Old Street area (has been a key aspiration for London Travel Watch) and paves the way for more connectivity when Crossrail opens in 2018. Improves cross-platform access to / from Victoria Line at Highbury & Islington and integration with London Overground Access to Moorgate from about 06:00 – midnight weekdays and at weekends Continued interchange with Kings Cross services at Finsbury Park Gatwick X - 27 brand new trains, 12ct (instead of 10), 2 double doors to allow quicker boarding and alighting, more seats including in the 1 class compartment. 2+2 seating with power points, WIFI, air-conditioning, more luggage space, accessible toilets Moorgate - New fleet of 6-car air conditioned trains to replace the 40 year old Class 313 trains by the end of December 2018 (Air con, RTI) manufacturer yet to be appointed

Brand new Moorgate trains On 22 December we announced Siemens as the preferred bidder for the new train fleet for Great Northern suburban services. The order will be for 25 six-car units (150 vehicles), of a variant of the Class 700, which is being built for the new Thameslink service. Replace Class 313 trains built in 1976 Enter service by the end of 2018 on routes to and from Welwyn, Hertford and Stevenage. Key features Fixed length with full width inter-vehicle gangways, creating more space for passengers on board (there are no intermediate cabs) Air-conditioning The latest in passenger information systems with real-time information Fully accessible and compliant with disability legislation Power points throughout