RAIL BALTICA PROCUREMENT PLAN

Slides:



Advertisements
Similar presentations
Part-financed by the European Union (European Regional Development Fund) From expectations to contributions towards Rail Baltica development in Kaunas.
Advertisements

OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
The Acquisition Gateway
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
Bridge Engineering Section Bridge Rehabilitation.
LITHUANIAN ASSOCIATION OF CONSULTING COMPANIES CONSULTING INDUSTRY IN LITHUANIA May 24, 2013 RIGA, LATVIA PRESENTATION OF THE LITHUANIAN ASSOCIATION OF.
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
PPP in Lithuania March, 2011.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Forum for Sustainable Mobility and Metropolitan Development Oradea, November 2013 JASPERS Teo Falato, Transport Sector Specialist.
RBGC First Transnational Roundtable Vilnius 24th November 2011 « Core Corridors and the « Rail Baltica » James Pond DG MOVE European Commission.
Click to edit Master title style Click to edit Master text styles Click to edit Master text styles Second level Second level Third level Third level Fourth.
Environmental Investment Centre (EIC) ISPA Unit Rävala pst 8, TALLINN Tel: Fax:
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
INTERREG IIIB project „RAIL BALTICA” Final Conference 10 January 2008 RAIL BALTICA.
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Progress of Riga and Pieriga Mobility Plan (RRMP) Andulis Židkovs Deputy State Secretary,
Anssi Pihkala1 Hansel Ltd Anssi Pihkala Chief Legal Counsel.
Different aspects of Latvian Railway Sector
Kaspars Ozoliņš State Secretary Ministry of Transport of the Republic of Latvia LATVIA TRANSPORT AND LOGISTICS BALTIC FORUM, JURMALA, MAY 23, 2014.
Pacific Aviation Investment Program. US$125 m Adaptable Program Loan Phase 1 Phase 2, 3, 4 Objective: improve operational safety and oversight of international.
Via Nordica 2008 Development of Main Road Networks both in the Baltic States and Poland Valdis Laukšteins Director of Technical Division SJSC Latvian State.
Transport Infrastructure and Civil Engineering Services.
6/2008 Keeping Finland Moving. 2 6/2008 Jukka Hirvelä Facts about Finland km² of which 77% is forest and 10% lakes and inland waterways. Built-up.
Reaching beyond the borders Dins Merirands, Deputy State Secretary Ministry of Transport of the Republic of Latvia Railway PRO Technology & Services Forum,
PROCUREMENT STUDIES Kaspars Briškens,
in Croatian Track access charging system
Business Environment in Latvia
RAIL BALTICA RIGA STATION – ASPIRATION FOR THE FUTURE
Minimum Set of Requirements for Suppliers
Rail Baltica procurement organisation and regulations
POSSIBLE E-SERVICES AND ELECTRONIC TRANSACTIONS IN LITHUANIA
Joint Presentation of the NCPs from PL, EE, LV and LT
Procurement at Lithuanian Railways
What to be taken into consideration for public procurement in Lithuania? Dainius Budrys Director, Rail Baltica statyba April 25, 2017.
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
Minimum Set of Requirements for Suppliers
Build Surrey Winning Supply Chain Work Workshop Working with Surrey Based Businesses Fred Mills, Osborne 6 June 2013.
NAB/RB Training Workshop In Valenciennes, April 2016
4th Railway Package – Implementation of the Technical Pillar
Terminals and Transport Interchanges
25/06/2018 6th ERA TAF TSI Regional Workshop (Poland, Latvia, Lithuania and Estonia) The Content of TAF TSI: RU/IM Communication and Legal Obligations.
Procurement at Lithuanian Railways
Session II: System authority for ERTMS 4RP Trackside approval
Round table discussion on ERTMS roll-out strategy
NATIONAL PROCUREMENT IN LATVIA
tourism competitiveness of Baltic States and it´s futurE Dr
PROCUREMENT 2017 DESIGN KAIDO ZIMMERMANN
Lorem ispum dolor sit amet Presentation Title.
TRIPARTITE PARTNERSHIP PROJECT
Personal data breach notification Be prepared!
FRISBEE: Freight Transport Model in Europe and Russia
Rail Baltica Cross-border Procurement Experience
Set Diagram for PowerPoint
Liquefied Natural Gas Terminal in Lithuania
A Catchy Title for My Research Project
LOGO 100% OPEN PROGRAM FOR 2018 RESULT Open School Program 1
Project delivery RIBA stages Define design deliver Key Objectives 1 2
A Catchy Title for My Research Project
Title of the Study Iowa State University Author #1 Author #2 Author #3
Dimension Sociopixels Automating Education.
This is an example text. Replace with your own text here.
Presented by European Railway Agency (ERA)
Title of the Study Iowa State University Author #1 Author #2 Author #3
OP Integrated infrastructure 2014 – 2020
Include your personal presentation if necessary.
Lorem ipsum NAME OF PRESENTATION Click to add subtitle
CUSTOMER JOURNEY MAP FOR POWERPOINT
SCHOOL SAFETY SUMMIT— ESC REGION 15
Title Background Methods Discussion Results Future Work Hypothesis
Presentation transcript:

RAIL BALTICA PROCUREMENT PLAN KASPARS ROKENS RB RAIL AS

RAIL BALTICA PROCURMENT PLAN Procrument phase Implementation phase 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Studies TESTING Design Railway line construction & supplies Stations / Terminals / Maintenance Facilities Construction ERTMS Electrification

RAIL BALTICA PROCURMENT IN 2017 36 37 IN TOTAL 1 SERVICES WORKS SERVICES / WORKS SUPPLIES

28 3 4 2 CONTRACTING AUTHORITIES RB RAIL ESTONIA – RAIL BALTIC ESTONIA LATVIA – EIROPAS DZELZCEĻA LĪNIJAS 4 LITHUANIA – MINISTRY OF TRANSPORTATION AND COMMUNICATIONS, LIETUVAS GELEŽINKELIAI 2

RB RAIL PROCUREMENT 14 5 9 STUDIES DESIGN OTHER

RB RAIL PROCUREMENT - OTHER BIM Marketing services Expert services Software for engeneering team Common Visual Identity RMS ERP system Legal services Key text Lorem ipsum dolor sit amet Travel agency services

RB RAIL PROCUREMENT - OTHER BIM Common Visual Identity RMS Software for engeneering team Q3 2017 Q2 2017 Q2 2017 Q2 2017

28 3 4 2 CONTRACTING AUTHORITIES RB RAIL ESTONIA – RAIL BALTIC ESTONIA LATVIA – EIROPAS DZELZCEĻA LĪNIJAS 4 LITHUANIA – MINISTRY OF TRANSPORTATION AND COMMUNICATIONS, LIETUVAS GELEZINKELIAI 2

Estonia tenders 2017 Technical solution and design for vehicle loading station Q2 Detailed Technical Design of Ülemiste terminal buildings Q4 Detailed Technical Design of Pärnu passenger terminal buildings Q4

Latvia tenders 2017 FIDIC engineer for Riga Central Railway junction Q2 Detailed technical design and construction of Riga Central Railway junction, related civil structures and buildings Q2/4 Technical assessment of the technical design Q3 Technical assessment of the technical design for Rail Baltica, Notified Body ( NoBo) Q4

Lithuania tenders 2017 Preparation of the project for land acquisition for public usage Q2 Preparation of the special plan for the straightening and speed increase of the “PL/ LT state border – Kaunas-RRT Palemonas” railway line Q4

www.railbaltica.org